X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354201002002

Well Details

Well ID: 0354201002002
Loading map...
Location: 00/02-10-035-20W4/2
Location Alias: 00/02-10-35-20 W4M
Location Alias 2: 00/02-10-035-20 W4/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 20
Section: 10
County/Municipality: County of Stettler No. 6
Well Name: PENGROWTH FENNBV 2-10-35-20
Operator Name: Cona Resources Ltd.
License Number: 0004332
License Date: 1952-03-08
License Status: RecCertified
Spud Date: 1952-03-23
Final Drill Date: 1965-08-29
Well Total Depth: 1624.60 m
Surface Hole Latitude: 51.984585
Surface Hole Longitude: -112.775944

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-03-08 Obtained License
1952-04-23 Perforation Treatment Performed - Open-Hole Completion
1965-08-29 Finished Drilling
1965-08-29 Perforation Treatment Performed - Open-Hole Completion
1965-08-29 Well Mode changed to Drilled and Cased
1965-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-09-07 Well Began Production
1965-09-07 Well Fluid changed to Crude Oil
1965-09-07 Well Mode changed to Pumping
1965-12-18 Perforation Treatment Performed - Cement Squeeze
1965-12-18 Well Fluid changed to Crude Oil
1965-12-18 Well Mode changed to Abandoned Zone
1982-03-16 Perforation Treatment Performed - Open-Hole Completion
1982-03-17 Perforation Treatment Performed - Cement Plug
1982-03-17 Perforation Treatment Performed - Jet Perforation
1982-03-17 Perforation Treatment Performed - Open-Hole Completion
1982-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-03 Perforation Treatment Performed - Jet Perforation
2001-06-03 Plug Back Performed
2001-06-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-04 Plug Back Performed
2001-06-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-04-23 Open Hole/Barefoot Completion 1595.60 1604.50 0
2001-06-03 Packing Device Capped w/Cement 1572.00 1580.00 0
2001-06-03 Perforation 307.00 308.00 13
2001-06-04 Packing Device Capped w/Cement 272.00 302.00 0
1965-08-29 Open Hole/Barefoot Completion 1618.80 1623.70 0
1965-09-01 Acid Treatment 1618.80 1623.70 0
1965-12-18 Cement Squeeze 1615.40 1624.60 0
1982-03-16 Open Hole/Barefoot Completion 1598.50 1624.60 0
1982-03-17 Cement Plug 1607.00 1624.60 0
1982-03-17 Open Hole/Barefoot Completion 1598.50 1607.00 0
1982-03-17 Perforation 1594.70 1604.50 13
1982-09-10 Acid Treatment 1594.70 1607.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0

For data sources see[5]

References