X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354192007000

Well Details

Well ID: 0354192007000
Loading map...
Location: 00/07-20-035-19W4/0
Location Alias: 00/07-20-35-19 W4M
Location Alias 2: 00/07-20-035-19 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 19
Section: 20
County/Municipality: County of Stettler No. 6
Well Name: EMBER FENNBV 7-20-35-19
Operator Name: Ember Resources Inc.
License Number: 0383551
License Date: 2007-10-22
License Status: Amended
Spud Date: 2008-10-01
Final Drill Date: 2008-10-02
Well Total Depth: 403.00 m
Surface Hole Latitude: 52.016122
Surface Hole Longitude: -112.677610

For data sources see[1][2]

Well History

Date Event
2007-10-22 Obtained License
2008-10-01 Surface Casing Operation Performed
2008-10-02 Finished Drilling
2008-10-02 Production Casing Operation Performed
2008-10-02 Rig Released
2008-10-02 Well Mode changed to Drilled and Cased
2008-10-15 Well Log Performed
2008-10-25 Perforation Treatment Performed - Jet Perforation
2008-10-25 Well Log Performed
2008-11-01 Perforation Treatment Performed - Fractured
2008-11-05 Well Began Production
2008-11-05 Well Fluid changed to Coalbed Methane-Coals and Other
2008-11-05 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-10-25 Perforation 358.70 359.20 13
2008-10-25 Perforation 228.20 228.70 13
2008-10-25 Perforation 224.40 224.90 13
2008-10-25 Perforation 219.70 220.20 13
2008-10-25 Perforation 212.20 212.70 13
2008-10-25 Perforation 208.40 210.90 13
2008-10-25 Perforation 200.80 201.30 13
2008-10-25 Perforation 195.20 195.70 13
2008-10-25 Perforation 193.00 194.00 13
2008-10-25 Perforation 187.50 188.00 13
2008-10-25 Perforation 181.80 182.80 13
2008-10-25 Perforation 311.40 311.90 13
2008-10-25 Perforation 147.60 148.60 13
2008-11-01 Fracture 358.70 359.20 0
2008-11-01 Fracture 311.40 311.90 0
2008-11-01 Fracture 305.20 305.70 0
2008-11-01 Fracture 289.30 289.80 0
2008-11-01 Fracture 253.40 253.90 0
2008-11-01 Fracture 249.50 250.50 0
2008-11-01 Fracture 242.70 243.20 0
2008-11-01 Fracture 238.60 239.60 0
2008-11-01 Fracture 236.80 237.30 0
2008-10-25 Perforation 305.20 305.70 13
2008-11-01 Fracture 228.20 228.70 0
2008-11-01 Fracture 224.40 224.90 0
2008-11-01 Fracture 219.70 220.20 0
2008-11-01 Fracture 212.20 212.70 0
2008-11-01 Fracture 208.40 210.90 0
2008-11-01 Fracture 200.80 201.30 0
2008-11-01 Fracture 195.20 195.70 0
2008-11-01 Fracture 193.00 194.00 0
2008-11-01 Fracture 187.50 188.00 0
2008-11-01 Fracture 181.80 182.80 0
2008-10-25 Perforation 289.30 289.80 13
2008-11-01 Fracture 147.60 148.60 0
2008-10-25 Perforation 253.40 253.90 13
2008-10-25 Perforation 249.50 250.50 13
2008-10-25 Perforation 242.70 243.20 13
2008-10-25 Perforation 238.60 239.60 13
2008-10-25 Perforation 236.80 237.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 1269 0.0 0.0 0.0
2009 7479 0.0 0.0 0.0
2010 7455 0.0 0.0 0.0
2011 8297 0.0 0.0 0.0
2012 8678 0.0 0.0 0.0
2013 4786 0.0 0.0 0.0
2014 8535 0.0 0.0 0.0
2015 8656 0.0 0.0 0.0
2016 8175 0.0 0.0 0.0
2017 8414 0.0 0.0 0.0
2018 7106 0.0 0.0 0.0
2019 8100 0.0 0.0 0.0
2020 2169 0.0 0.0 0.0

For data sources see[5]

References