X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354122907022

Well Details

Well ID: 0354122907022
Loading map...
Location: 02/07-29-035-12W4/2
Location Alias: 02/07-29-35-12 W4M
Location Alias 2: 02/07-29-035-12 W4/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 12
Section: 29
County/Municipality: County of Paintearth No. 18
Well Name: CPEC PROVOST 7-29-35-12
Operator Name: Crescent Point Energy Corp.
License Number: 0178361
License Date: 1995-06-05
License Status: Suspension
Spud Date: 1995-06-26
Final Drill Date: 1995-07-01
Well Total Depth: 1090.00 m
Surface Hole Latitude: 52.031273
Surface Hole Longitude: -111.681827

For data sources see[1][2]

Well History

Date Event
1995-06-05 Obtained License
1995-06-26 Surface Casing Operation Performed
1995-06-26 Well Log Performed
1995-07-01 Finished Drilling
1995-07-01 Well Log Performed
1995-07-01 Well Mode changed to Drilled and Cased
1995-07-02 Production Casing Operation Performed
1995-07-02 Rig Released
1995-07-21 Well Log Performed
1995-07-22 Perforation Treatment Performed - Fractured
1995-07-22 Perforation Treatment Performed - Jet Perforation
1999-05-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-05-19 Perforation Treatment Performed - Jet Perforation
1999-05-19 Plug Back Performed
1999-05-19 Well Log Performed
1999-05-19 Well Mode changed to Drilled and Cased
1999-05-20 Well Log Performed
1999-05-22 Perforation Treatment Performed - Jet Perforation
1999-05-23 Well Log Performed
2000-05-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-05-04 Plug Back Performed
2000-05-04 Well Abandoned
2000-05-04 Well Mode changed to Abandoned and Re-entered
2000-05-05 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-07-22 Perforation 941.00 944.00 13
1995-07-22 Fracture 941.00 944.00 0
1999-05-19 Packing Device Capped w/Cement 917.00 925.00 0
1999-05-19 Perforation 271.00 276.00 13
1999-05-22 Perforation 261.00 266.00 13
2000-05-04 Packing Device Capped w/Cement 250.00 258.00 0

For data sources see[4]



References