X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354102307000

Well Details

Well ID: 0354102307000
Loading map...
Location: 00/07-23-035-10W4/0
Location Alias: 00/07-23-35-10 W4M
Location Alias 2: 00/07-23-035-10 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 10
Section: 23
County/Municipality: County of Paintearth No. 18
Well Name: CALSTAN ET AL HAMIL 7-23-35-10
Operator Name: Chevron Canada Limited
License Number: 0022016
License Date: 1962-01-30
License Status: RecCertified
Spud Date: 1962-02-17
Final Drill Date: 1962-02-23
Well Total Depth: 918.10 m
Surface Hole Latitude: 52.017593
Surface Hole Longitude: -111.322517

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-01-30 Obtained License
1962-02-23 Finished Drilling
1962-02-23 Well Mode changed to Drilled and Cased
1962-02-24 Production Casing Operation Performed
1962-03-13 Perforation Treatment Performed - Jet Perforation
1962-03-15 Perforation Treatment Performed - Fractured
1962-06-25 Well Began Production
1962-06-25 Well Fluid changed to Crude Oil
1962-06-25 Well Mode changed to Pumping
1962-10-16 Perforation Treatment Performed - Condensate Squeeze
1962-11-06 Well Began Injection
1962-11-06 Well Fluid changed to Water
1962-11-06 Well Type changed to Injection
1967-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-05-30 Perforation Treatment Performed - Acid Wash - No Pressure
1969-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-03-21 Perforation Treatment Performed - Acid Wash - No Pressure
1971-06-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-06-16 Perforation Treatment Performed - Chemical Squeeze
1972-03-14 Perforation Treatment Performed - Chemical Squeeze
1972-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-25 Perforation Treatment Performed - Chemical Squeeze
1980-10-29 Perforation Treatment Performed - Fractured
1990-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-11-16 Plug Back Performed
1990-11-16 Well Fluid changed to Water
1990-11-16 Well Log Performed
1990-11-16 Well Mode changed to Abandoned
1990-11-16 Well Type changed to Injection
1990-11-17 Perforation Treatment Performed - Acid Wash - No Pressure
1990-11-17 Perforation Treatment Performed - Cement Plug
1990-11-17 Perforation Treatment Performed - Jet Perforation
1990-11-18 Perforation Treatment Performed - Cement Plug
1990-12-12 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-03-13 Perforation 891.80 892.80 3
1972-03-14 Chemical Squeeze 891.80 892.80 0
1972-06-15 Acid Treatment 891.80 892.80 0
1973-06-25 Chemical Squeeze 891.80 892.80 0
1980-10-29 Fracture 891.80 892.80 0
1990-11-16 Packing Device Capped w/Cement 839.50 850.00 0
1990-11-17 Perforation 277.00 277.50 13
1990-11-17 Acid Wash 277.00 277.50 0
1990-11-17 Cement Plug 252.00 302.50 0
1990-11-17 Perforation 120.00 120.50 13
1990-11-18 Cement Plug 49.00 110.00 0
1962-03-15 Fracture 891.80 892.80 0
1962-10-16 Condensate Squeeze 891.80 892.80 0
1967-05-30 Acid Wash 891.80 892.80 0
1967-05-30 Acid Treatment 891.80 892.80 0
1969-03-21 Acid Wash 891.80 892.80 0
1969-03-21 Acid Treatment 891.80 892.80 0
1971-06-16 Chemical Squeeze 891.80 892.80 0
1971-06-16 Acid Treatment 891.80 892.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0

For data sources see[5]

References