X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354093003000

Well Details

Well ID: 0354093003000
Loading map...
Location: 00/03-30-035-09W4/0
Location Alias: 00/03-30-35-09 W4M
Location Alias 2: 00/03-30-035-09 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 09
Section: 30
County/Municipality: County of Paintearth No. 18
Well Name: CHEVRON ET AL HAMIL 3-30V-35-9
Operator Name: Chevron Canada Limited
License Number: 0029396
License Date: 1965-11-16
License Status: RecCertified
Spud Date: 1965-11-19
Final Drill Date: 1965-11-23
Well Total Depth: 914.40 m
Surface Hole Latitude: 52.028656
Surface Hole Longitude: -111.281458

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-11-16 Obtained License
1965-11-23 Finished Drilling
1965-11-24 Production Casing Operation Performed
1965-12-21 Perforation Treatment Performed - Jet Perforation
1965-12-22 Perforation Treatment Performed - Fractured
1966-06-02 Perforation Treatment Performed - Fractured
1966-08-13 Well Mode changed to Drilled and Cased
1967-12-12 Well Began Production
1967-12-12 Well Fluid changed to Crude Oil
1967-12-12 Well Mode changed to Pumping
1970-05-19 Well Fluid changed to Crude Oil
1970-05-19 Well Mode changed to Suspended
1971-04-12 Well Fluid changed to Crude Oil
1971-04-12 Well Mode changed to Pumping
1973-10-12 Well Began Injection
1973-10-12 Well Fluid changed to Water
1973-10-12 Well Type changed to Injection
1976-06-28 Perforation Treatment Performed - Chemical Squeeze
1978-10-19 Well Fluid changed to Water
1978-10-19 Well Mode changed to Suspended
1978-10-19 Well Type changed to Injection
1990-11-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-11-19 Plug Back Performed
1990-11-19 Well Fluid changed to Water
1990-11-19 Well Log Performed
1990-11-19 Well Mode changed to Abandoned
1990-11-19 Well Type changed to Injection
1990-11-20 Perforation Treatment Performed - Acid Wash - No Pressure
1990-11-20 Perforation Treatment Performed - Cement Plug
1990-11-20 Perforation Treatment Performed - Jet Perforation
1990-11-21 Perforation Treatment Performed - Remedial Casing
1990-12-11 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-12-21 Perforation 895.50 897.30 13
1990-11-21 Remedial Casing Cementing 120.00 120.50 0
1965-12-22 Fracture 895.50 897.30 0
1966-06-02 Fracture 895.50 897.30 0
1976-06-28 Chemical Squeeze 895.50 897.30 0
1990-11-19 Packing Device Capped w/Cement 862.00 875.00 0
1990-11-20 Perforation 286.00 286.50 13
1990-11-20 Acid Wash 286.00 286.50 0
1990-11-20 Cement Plug 261.00 311.50 0
1990-11-20 Perforation 120.00 120.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 456 0.0 0.0 0.0
1968 1644 0.0 0.0 0.0
1970 24 0.0 0.0 0.0
1971 116 0.0 0.0 0.0
1972 232 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0

For data sources see[5]

References