If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354091501000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.999396,"lon":-111.198465,"icon":""}]} |
Location: 00/01-15-035-09W4/0 | |
Location Alias: 00/01-15-35-09 W4M | |
Location Alias 2: 00/01-15-035-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 09 | |
Section: 15 | |
County/Municipality: Special Areas No. 4 | |
Well Name: ENERPLUS ET AL PROVOST 1-15-35-9 | |
Operator Name: Enerplus Corporation | |
License Number: 0033481 | |
License Date: 1968-01-17 | |
License Status: RecExempt | |
Spud Date: 1968-01-20 | |
Final Drill Date: 1968-01-30 | |
Well Total Depth: 929.60 m | |
Surface Hole Latitude: 51.999396 | |
Surface Hole Longitude: -111.198465 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1968-01-17 | Obtained License |
1968-01-29 | Drill Stem Test Performed |
1968-01-30 | Finished Drilling |
1968-01-30 | Well Mode changed to Drilled and Cased |
1968-01-31 | Production Casing Operation Performed |
1968-02-08 | Perforation Treatment Performed - Acid Wash - No Pressure |
1968-02-08 | Perforation Treatment Performed - Jet Perforation |
1968-02-09 | Perforation Treatment Performed - Fractured |
1968-03-19 | Well Began Production |
1968-03-19 | Well Fluid changed to Crude Oil |
1968-03-19 | Well Mode changed to Pumping |
1968-11-03 | Perforation Treatment Performed - Acid Wash - No Pressure |
1969-03-03 | Well Began Injection |
1969-03-03 | Well Fluid changed to Water |
1969-03-03 | Well Type changed to Injection |
1975-06-19 | Perforation Treatment Performed - Cement Squeeze |
1975-06-21 | Well Abandoned |
1975-06-21 | Well Fluid changed to Water |
1975-06-21 | Well Mode changed to Abandoned |
1975-06-21 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1968-02-08 | Perforation | 911.70 | 912.30 | 13 |
1968-02-08 | Acid Wash | 911.70 | 912.30 | 0 |
1968-02-09 | Fracture | 911.70 | 912.30 | 0 |
1968-11-03 | Acid Wash | 911.70 | 912.30 | 0 |
1975-06-19 | Cement Squeeze | 911.70 | 912.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1968 | 24 | 0.0 | 0.0 | 0.0 |
1969 | 0 | 0.0 | 0.0 | 0.0 |
1970 | 0 | 0.0 | 0.0 | 0.0 |
1971 | 0 | 0.0 | 0.0 | 0.0 |
1972 | 0 | 0.0 | 0.0 | 0.0 |
1973 | 0 | 0.0 | 0.0 | 0.0 |
1974 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]