X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354090802020

Well Details

Well ID: 0354090802020
Loading map...
Location: 02/02-08-035-09W4/0
Location Alias: 02/02-08-35-09 W4M
Location Alias 2: 02/02-08-035-09 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 09
Section: 08
County/Municipality: County of Paintearth No. 18
Well Name: HOL ET AL PROVOST 2-8-35-9
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0047350
License Date: 1973-09-21
License Status: RecCertified
Spud Date: 1973-09-27
Final Drill Date: 1973-09-29
Well Total Depth: 925.40 m
Surface Hole Latitude: 51.985203
Surface Hole Longitude: -111.251792

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-09-21 Obtained License
1973-09-29 Finished Drilling
1973-09-29 Well Mode changed to Drilled and Cased
1973-09-30 Production Casing Operation Performed
1973-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-10-04 Perforation Treatment Performed - Jet Perforation
1973-10-05 Well Began Injection
1973-10-05 Well Fluid changed to Water
1973-10-05 Well Type changed to Injection
1983-05-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-11-24 Well Fluid changed to Water
1988-11-24 Well Mode changed to Suspended
1988-11-24 Well Type changed to Injection
1997-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-10 Plug Back Performed
1997-06-10 Well Abandoned
1997-06-10 Well Fluid changed to Water
1997-06-10 Well Mode changed to Abandoned
1997-06-10 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-10-04 Perforation 897.90 899.80 7
1973-10-04 Acid Treatment 897.90 899.80 0
1983-05-12 Acid Treatment 897.90 899.80 0
1997-06-10 Packing Device Capped w/Cement 875.50 883.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0

For data sources see[5]

References