X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354090514000

Well Details

Well ID: 0354090514000
Loading map...
Location: 00/14-05-035-09W4/0
Location Alias: 00/14-05-35-09 W4M
Location Alias 2: 00/14-05-035-09 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 09
Section: 05
County/Municipality: Special Areas No. 4
Well Name: FINA PACIFIC HAMIL 14-5-35-9
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0007053
License Date: 1953-09-14
License Status: RecCertified
Spud Date: 1953-09-14
Final Drill Date: 1953-09-20
Well Total Depth: 910.10 m
Surface Hole Latitude: 51.981255
Surface Hole Longitude: -111.257656

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-09-14 Obtained License
1953-09-19 Drill Stem Test Performed
1953-09-20 Drill Stem Test Performed
1953-09-20 Finished Drilling
1953-09-20 Production Casing Operation Performed
1953-09-20 Well Mode changed to Drilled and Cased
1953-10-02 Perforation Treatment Performed - Jet Perforation
1953-10-05 Well Began Production
1953-10-05 Well Fluid changed to Crude Oil
1953-10-05 Well Mode changed to Pumping
1955-09-26 Perforation Treatment Performed - Fractured
1988-11-05 Well Log Performed
1988-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-11-24 Well Began Injection
1988-11-24 Well Fluid changed to Water
1988-11-24 Well Type changed to Injection
1998-07-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-30 Plug Back Performed
1998-07-30 Well Fluid changed to Water
1998-07-30 Well Mode changed to Abandoned Zone
1998-07-30 Well Type changed to Injection
1998-08-01 Perforation Treatment Performed - Abrasa-Jet Perforation
1998-08-01 Perforation Treatment Performed - Remedial Casing
1998-08-02 Well Abandoned
1998-08-02 Well Fluid changed to Water
1998-08-02 Well Mode changed to Abandoned
1998-08-02 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-10-02 Perforation 894.00 895.50 13
1955-09-26 Fracture 894.00 895.50 0
1988-11-06 Acid Treatment 894.00 895.50 0
1998-07-30 Packing Device Capped w/Cement 874.00 882.00 0
1998-08-01 Hydra Jet Perforation 317.00 317.20 0
1998-08-01 Remedial Casing Cementing 317.00 317.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1216 0.0 0.0 0.0
1969 3632 0.0 0.0 0.0
1970 4869 0.0 0.0 0.0
1971 8345 0.0 0.0 0.0
1972 7846 0.0 0.0 0.0
1973 8038 0.0 0.0 0.0
1974 5305 0.0 0.0 0.0
1975 8423 0.0 0.0 0.0
1976 7239 0.0 0.0 0.0
1977 7484 0.0 0.0 0.0
1978 7672 0.0 0.0 0.0
1979 7122 0.0 0.0 0.0
1980 8632 0.0 0.0 0.0
1981 8725 0.0 0.0 0.0
1982 8713 0.0 0.0 0.0
1983 8228 0.0 0.0 0.0
1984 8275 0.0 0.0 0.0
1985 8184 0.0 0.0 0.0
1986 8467 0.0 0.0 0.0
1987 8678 0.0 0.0 0.0
1988 7205 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0

For data sources see[5]

References