X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354060701060

Well Details

Well ID: 0354060701060
Loading map...
Location: 06/01-07-035-06W4/0
Location Alias: 06/01-07-35-06 W4M
Location Alias 2: 06/01-07-035-06 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 06
Section: 07
County/Municipality: Special Areas No. 4
Well Name: VIKING 1D2 PROVO 1-7-35-6
Operator Name: Harvest Operations Corp.
License Number: 0158375
License Date: 1993-05-19
License Status: Suspension
Spud Date: 1993-05-21
Final Drill Date: 1993-05-25
Well Total Depth: 1065.00 m
Surface Hole Latitude: 51.983969
Surface Hole Longitude: -110.841680

For data sources see[1][2]

Well History

Date Event
1993-05-19 Obtained License
1993-05-22 Direction Drilling Operation Performed - Deviate
1993-05-22 Surface Casing Operation Performed
1993-05-25 Finished Drilling
1993-05-25 Well Log Performed
1993-05-25 Well Mode changed to Drilled and Cased
1993-05-26 Production Casing Operation Performed
1993-05-26 Rig Released
1993-06-07 Well Log Performed
1993-06-18 Perforation Treatment Performed - Jet Perforation
1993-07-09 Well Began Production
1993-07-09 Well Fluid changed to Crude Oil
1993-07-09 Well Mode changed to Pumping
1993-09-20 Well Log Performed
1999-04-20 Perforation Treatment Performed - Cement Squeeze
1999-04-20 Plug Back Performed
1999-04-23 Perforation Treatment Performed - Jet Perforation
1999-04-24 Well Log Performed
2003-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-18 Plug Back Performed
2003-01-18 Well Fluid changed to Crude Oil
2003-01-18 Well Log Performed
2003-01-18 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-05-22 186.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-06-18 Perforation 1005.00 1009.50 13
1999-04-20 Cement Squeeze 1005.00 1009.50 0
1999-04-23 Perforation 1003.00 1006.00 17
2003-01-18 Packing Device Capped w/Cement 966.00 974.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 3731 0.0 0.0 0.0
1994 8449 0.0 0.0 0.0
1995 8280 0.0 0.0 0.0
1996 8408 0.0 0.0 0.0
1997 8301 0.0 0.0 0.0
1998 8677 0.0 0.0 0.0
1999 7612 0.0 0.0 0.0
2000 8706 0.0 0.0 0.0
2001 8586 0.0 0.0 0.0
2002 8070 0.0 0.0 0.0
2003 384 0.0 0.0 0.0

For data sources see[6]

References