X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354042007020

Well Details

Well ID: 0354042007020
Loading map...
Location: 02/07-20-035-04W4/0
Location Alias: 02/07-20-35-04 W4M
Location Alias 2: 02/07-20-035-04 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 04
Section: 20
County/Municipality: Special Areas No. 4
Well Name: KARVE 102 HZ PROVOST 7-20-35-4
Operator Name: Karve Energy Inc.
License Number: 0496076
License Date: 2019-10-16
License Status: Issued
Spud Date: 2020-01-07
Final Drill Date: 2020-01-09
Well Total Depth: 2089.00 m
Surface Hole Latitude: 52.015644
Surface Hole Longitude: -110.556103

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-01-07 Ensign Drilling Inc. 348 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-01-07 246.70 Deviate (5 - 79 degrees)
2020-01-08 1049.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-01-25 Multi-Stage Fracture 1966.40 1966.50 0
2020-01-25 Multi-Stage Fracture 1642.30 1642.40 0
2020-01-25 Multi-Stage Fracture 1602.80 1602.90 0
2020-01-25 Multi-Stage Fracture 1576.00 1576.10 0
2020-01-25 Multi-Stage Fracture 1536.20 1536.30 0
2020-01-25 Multi-Stage Fracture 1496.80 1496.90 0
2020-01-25 Multi-Stage Fracture 1469.90 1470.00 0
2020-01-25 Multi-Stage Fracture 1443.20 1443.30 0
2020-01-25 Multi-Stage Fracture 1404.80 1404.90 0
2020-01-25 Multi-Stage Fracture 1378.70 1378.80 0
2020-01-25 Multi-Stage Fracture 1339.30 1339.40 0
2020-01-25 Multi-Stage Fracture 1938.90 1939.00 0
2020-01-25 Multi-Stage Fracture 1299.90 1300.00 0
2020-01-25 Multi-Stage Fracture 1273.20 1273.30 0
2020-01-25 Multi-Stage Fracture 1245.70 1245.80 0
2020-01-25 Multi-Stage Fracture 1177.30 1177.40 0
2020-01-25 Multi-Stage Fracture 1151.00 1151.10 0
2020-01-25 Multi-Stage Fracture 1097.10 1097.20 0
2020-01-25 Multi-Stage Fracture 1070.70 1070.80 0
2020-01-25 Multi-Stage Fracture 1044.50 1044.60 0
2020-01-30 Open Hole/Barefoot Completion 2010.10 2089.00 0
2020-01-25 Multi-Stage Fracture 1912.60 1912.70 0
2020-01-25 Multi-Stage Fracture 1871.70 1871.80 0
2020-01-25 Multi-Stage Fracture 1804.80 1804.90 0
2020-01-25 Multi-Stage Fracture 1750.80 1750.90 0
2020-01-25 Multi-Stage Fracture 1723.40 1723.50 0
2020-01-25 Multi-Stage Fracture 1695.90 1696.00 0
2020-01-25 Multi-Stage Fracture 1669.00 1669.10 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2020-01-25 2020-01-25 783 633 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 76.319 N/A
16/30 Domestic Sand Step Energy Services Crystalline Silica 14808-60-7 100 22.9429 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0099 N/A
Methyl Alcohol 67-56-1 100 0.0099 N/A
SBE-2 (Breaker) Step Energy Services Breaker Non-Hazardous Ingredients Not Available 100 0.0533 N/A
Sodium chloride 7647-14-5 100 0.0533 N/A
SCS-1 (Clay Control) Step Energy Services Clay Control Choline chloride 67-48-1 100 0.1077 N/A
Non-Hazardous Ingredients Not Available 100 0.1077 N/A
SBX-2C (Crosslinker) STEP Energy Services Crosslinker Boric Acid 10043-35-3 100 0.037 N/A
Ethylene Glycol 107-21-1 100 0.037 N/A
Monoethanolamine 141-43-5 100 0.037 N/A
Water 7732-18-5 100 0.037 N/A
SFR-110 (Friction Reducer) Step Energy Services Friction Reducer Mineral Oil 8012-95-1 100 0.0536 N/A
Polyacrylamide 5/8/9003 100 0.0536 N/A
Primary Alcohol Ethoxylatehigh 68131-39-5 100 0.0536 N/A
Sodium 2-Acryloylamino-2-methyl-1-propanesulfonic 15214-89-8 100 0.0536 N/A
Sodium Acrylate 7446-81-3 100 0.0536 N/A
Water 7732-18-5 100 0.0536 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.4009 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.4009 N/A
SNE-2C (Non-Emulsifier) STEP Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.0753 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.0753 N/A
Methanol 67-56-1 100 0.0753 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.0753 N/A
Water 7732-18-5 100 0.0753 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2020-01-15 2020-01-15 Municipal Water 510
2020-01-15 2020-01-15 Municipal Water 17
2020-01-15 2020-01-15 Central Water Distribution Facility 97
2020-01-15 2020-01-15 Central Water Distribution Facility 16
2020-01-15 2020-01-15 Central Water Distribution Facility 74

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 1409 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-10 No Incident Encountered 0.00 0.00
2020-01-30 No Incident Encountered 0.00 0.00

For data sources see[9]

References