X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354041614030

Well Details

Well ID: 0354041614030
Loading map...
Location: 03/14-16-035-04W4/0
Location Alias: 03/14-16-35-04 W4M
Location Alias 2: 03/14-16-035-04 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 04
Section: 16
County/Municipality: Special Areas No. 4
Well Name: HIGH GROUND HZ 03 PROVOST 14-16-35-4
Operator Name: Karve Energy Inc.
License Number: 0482307
License Date: 2017-01-09
License Status: Issued
Spud Date: 2017-01-23
Final Drill Date: 2017-01-25
Well Total Depth: 1676.00 m
Surface Hole Latitude: 52.010112
Surface Hole Longitude: -110.530890

For data sources see[1][2]

Well History

Date Event
2017-01-09 Obtained License
2017-01-24 Direction Drilling Operation Performed - Deviate
2017-01-24 Surface Casing Operation Performed
2017-01-25 Direction Drilling Operation Performed - Horizontal
2017-01-25 Finished Drilling
2017-01-25 Well Log Performed
2017-01-25 Well Mode changed to Drilled and Cased
2017-01-26 Production Casing Operation Performed
2017-01-26 Rig Released
2017-02-28 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-01 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-20 Well Began Production
2017-03-20 Well Fluid changed to Crude Oil
2017-03-20 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-01-23 Bonanza Drilling Inc. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-01-24 559.60 Deviate (5 - 79 degrees)
2017-01-25 900.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-02-28 Multi-Stage Fracture 1632.20 1632.30 0
2017-02-28 Multi-Stage Fracture 1298.90 1299.00 0
2017-02-28 Multi-Stage Fracture 1267.90 1268.00 0
2017-02-28 Multi-Stage Fracture 1236.80 1236.90 0
2017-02-28 Multi-Stage Fracture 1205.70 1205.80 0
2017-02-28 Multi-Stage Fracture 1174.70 1174.80 0
2017-02-28 Multi-Stage Fracture 1143.90 1144.00 0
2017-03-01 Multi-Stage Fracture 1112.80 1112.90 0
2017-03-01 Multi-Stage Fracture 1082.30 1082.40 0
2017-03-01 Multi-Stage Fracture 1051.20 1051.30 0
2017-03-01 Multi-Stage Fracture 1020.10 1020.20 0
2017-02-28 Multi-Stage Fracture 1587.70 1587.80 0
2017-02-28 Multi-Stage Fracture 1556.80 1556.90 0
2017-02-28 Multi-Stage Fracture 1512.20 1512.30 0
2017-02-28 Multi-Stage Fracture 1481.10 1481.20 0
2017-02-28 Multi-Stage Fracture 1436.80 1436.90 0
2017-02-28 Multi-Stage Fracture 1405.70 1405.80 0
2017-02-28 Multi-Stage Fracture 1361.10 1361.20 0
2017-02-28 Multi-Stage Fracture 1330.00 1330.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-02-28 2017-03-01 781 846 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Potassium Chloride 7447-40-7 100 75.4392 N/A
Water 7732-18-5 100 75.4392 N/A
Sand (16/30) Canyon Technical Services Aluminum Oxide 1344-28-1 100 19.9429 N/A
Crystalline silica. quartz 14808-60-7 100 19.9429 N/A
Iron Oxide 1309-37-1 100 19.9429 N/A
Titanium Oxide 13463-67-7 100 19.9429 N/A
Sand (20/40) Canyon Technical Services Aluminum Oxide 1344-28-1 100 3.3368 N/A
Crystalline silica. quartz 14808-60-7 100 3.3368 N/A
Iron Oxide 1309-37-1 100 3.3368 N/A
Titanium Oxide 13463-67-7 100 3.3368 N/A
Tolcide PS75LT Canyon Technical Services Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.2239 N/A
Water 7732-18-5 100 0.2239 N/A
CAN-2300 Breaker (Enzyme HpH) Canyon Technical Services Breaker Cellulase Enzyme Solution Not Available 100 0.0089 N/A
CAN-2301 Breaker (Oxidizer) Canyon Technical Services Breaker Ammonium Persulfate 7727-54-0 100 0.0714 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0714 N/A
CAN-2200 Crosslinker / pH buffer (Borate) Canyon Technical Services Crosslinker Boric Acid 10043-35-3 100 0.1232 N/A
Monoethanolamine 141-43-5 100 0.1232 N/A
Water 7732-18-5 100 0.1232 N/A
CAN-2413 Non-emulsifier Canyon Technical Services Demulsifier Isopropyl Alcohol 67-63-0 100 0.1469 N/A
Methanol 67-56-1 100 0.1469 N/A
Non-hazardous base ingredient(s) Not Available 100 0.1469 N/A
Sulfonic Acids (Petroleum) 61789-85-3 100 0.1469 N/A
CAN-4000 Tubular Lubricant Canyon Technical Services Friction Reducer Sorbitan Triolate 26266-58-0 100 0.0368 N/A
CAN-2000 Gellant (Guar) Canyon Technical Services Gelling Agent Polysacharide Suspension Not Available 100 0.4376 N/A
paraFLO 2 Canyon Technical Services Scale Inhibitor Non-hazardous base ingredient(s) Not Available 100 0.2319 N/A
Silica. crystalline-quartz 14808-60-7 100 0.2319 N/A
White mineral oil 8042-47-5 100 0.2319 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-02-28 2017-03-01 Surface Water - Runoff 846

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 6551 0.0 0.0 0.0
2018 5480 0.0 0.0 0.0
2019 6575 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-26 No Incident Encountered 0.00 0.00
2017-02-07 No Incident Encountered 0.00 0.00

For data sources see[10]

References