X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354040313000

Well Details

Well ID: 0354040313000
Loading map...
Location: 00/13-03-035-04W4/0
Location Alias: 00/13-03-35-04 W4M
Location Alias 2: 00/13-03-035-04 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 04
Section: 03
County/Municipality: Special Areas No. 4
Well Name: HIGH GROUND HZ PROVOST 13-3-35-4
Operator Name: Karve Energy Inc.
License Number: 0485167
License Date: 2017-08-25
License Status: Issued
Spud Date: 2017-09-30
Final Drill Date: 2017-10-02
Well Total Depth: 2309.00 m
Surface Hole Latitude: 51.967411
Surface Hole Longitude: -110.502551

For data sources see[1][2]

Well History

Date Event
2017-08-25 Obtained License
2017-10-01 Direction Drilling Operation Performed - Deviate
2017-10-01 Direction Drilling Operation Performed - Horizontal
2017-10-01 Surface Casing Operation Performed
2017-10-02 Finished Drilling
2017-10-02 Well Log Performed
2017-10-02 Well Mode changed to Drilled and Cased
2017-10-03 Production Casing Operation Performed
2017-10-04 Rig Released
2017-10-29 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-30 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-05 Well Began Production
2017-11-05 Well Fluid changed to Crude Oil
2017-11-05 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-09-30 Bonanza Drilling Inc. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-10-01 404.90 Deviate (5 - 79 degrees)
2017-10-01 806.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-10-29 Multi-Stage Fracture 2222.50 2222.60 0
2017-10-29 Multi-Stage Fracture 1935.00 1935.10 0
2017-10-30 Multi-Stage Fracture 1905.50 1905.60 0
2017-10-30 Multi-Stage Fracture 1877.00 1877.10 0
2017-10-30 Multi-Stage Fracture 1848.30 1848.40 0
2017-10-30 Multi-Stage Fracture 1808.20 1808.30 0
2017-10-30 Multi-Stage Fracture 1779.60 1779.70 0
2017-10-30 Multi-Stage Fracture 1750.80 1750.90 0
2017-10-30 Multi-Stage Fracture 1722.10 1722.20 0
2017-10-30 Multi-Stage Fracture 1694.20 1694.30 0
2017-10-30 Multi-Stage Fracture 1612.10 1612.20 0
2017-10-29 Multi-Stage Fracture 2193.10 2193.20 0
2017-10-30 Multi-Stage Fracture 1583.30 1583.40 0
2017-10-30 Multi-Stage Fracture 1554.50 1554.60 0
2017-10-30 Multi-Stage Fracture 1527.70 1527.80 0
2017-10-30 Multi-Stage Fracture 1498.20 1498.30 0
2017-10-30 Multi-Stage Fracture 1470.00 1470.10 0
2017-10-30 Multi-Stage Fracture 1440.60 1440.70 0
2017-10-30 Multi-Stage Fracture 1411.90 1412.00 0
2017-10-30 Multi-Stage Fracture 1383.60 1383.70 0
2017-10-30 Multi-Stage Fracture 1355.80 1355.90 0
2017-10-30 Multi-Stage Fracture 1326.60 1326.70 0
2017-10-29 Multi-Stage Fracture 2164.00 2164.10 0
2017-10-30 Multi-Stage Fracture 1297.90 1298.00 0
2017-10-30 Multi-Stage Fracture 1270.70 1270.80 0
2017-10-30 Multi-Stage Fracture 1242.60 1242.70 0
2017-10-30 Multi-Stage Fracture 1200.80 1200.90 0
2017-10-30 Multi-Stage Fracture 1121.60 1121.70 0
2017-10-30 Multi-Stage Fracture 1093.70 1093.80 0
2017-10-30 Multi-Stage Fracture 1025.70 1025.80 0
2017-10-30 Multi-Stage Fracture 996.90 997.00 0
2017-10-30 Multi-Stage Fracture 967.90 968.00 0
2017-10-30 Multi-Stage Fracture 939.30 939.40 0
2017-10-29 Multi-Stage Fracture 2135.30 2135.40 0
2017-10-30 Multi-Stage Fracture 885.40 885.50 0
2017-10-29 Multi-Stage Fracture 2078.80 2078.90 0
2017-10-29 Multi-Stage Fracture 2049.80 2049.90 0
2017-10-29 Multi-Stage Fracture 2020.40 2020.50 0
2017-10-29 Multi-Stage Fracture 1992.50 1992.60 0
2017-10-29 Multi-Stage Fracture 1963.70 1963.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-10-29 2017-10-30 698 1,627 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 79.5003 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 9.9478 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0645 N/A
water 7732-18-5 100 0.0645 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.048 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1232 N/A
Ethylene glycol 107-21-1 100 0.1232 N/A
Potassium Carbonate 584-08-7 100 0.1232 N/A
Potassium Hydroxide 1310-58-3 100 0.1232 N/A
IH-FR-1C Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.0418 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.2631 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0629 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0629 N/A
water 7732-18-5 100 0.0629 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-10-29 2017-10-30 Groundwater - Non-saline greater than 150m deep 814
2017-10-29 2017-10-30 Waste Water - Oilfield 814
2017-10-29 2017-10-30 Groundwater - Saline 813

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 1038 0.0 0.0 0.0
2018 8068 0.0 0.0 0.0
2019 7693 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-10-04 No Incident Encountered 0.00 0.00
2017-10-11 No Incident Encountered 0.00 0.00

For data sources see[10]

References