X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354033010000

Well Details

Well ID: 0354033010000
Loading map...
Location: 00/10-30-035-03W4/0
Location Alias: 00/10-30-35-03 W4M
Location Alias 2: 00/10-30-035-03 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 03
Section: 30
County/Municipality: Special Areas No. 4
Well Name: DYNAMIC ET AL PROVOST 10-30-35-3
Operator Name: Petromark Minerals Ltd.
License Number: 0017630
License Date: 1959-08-25
License Status: RecCertified
Spud Date: 1959-08-27
Final Drill Date: 1959-09-01
Well Total Depth: 947.90 m
Surface Hole Latitude: 52.035661
Surface Hole Longitude: -110.418634

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-08-25 Obtained License
1959-09-01 Finished Drilling
1959-09-02 Production Casing Operation Performed
1960-03-24 Well Mode changed to Drilled and Cased
1976-02-09 Perforation Treatment Performed - Fractured
1976-02-09 Perforation Treatment Performed - Jet Perforation
1981-02-12 Well Began Production
1981-02-12 Well Fluid changed to Gas
1981-02-12 Well Mode changed to Flowing
1992-09-10 Well Log Performed
1992-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-11 Perforation Treatment Performed - Jet Perforation
1992-09-11 Perforation Treatment Performed - Remedial Casing
1992-09-11 Plug Back Performed
1992-09-11 Well Fluid changed to Gas
1992-09-11 Well Mode changed to Abandoned
1992-09-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-02-09 Perforation 773.00 775.40 3
1976-02-09 Fracture 773.00 775.40 0
1992-09-11 Packing Device Capped w/Cement 760.00 768.00 0
1992-09-11 Perforation 289.00 289.50 7
1992-09-11 Remedial Casing Cementing 289.00 289.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 4211 0.0 0.0 0.0
1982 3202 0.0 0.0 0.0
1983 3517 0.0 0.0 0.0
1984 3139 0.0 0.0 0.0
1985 4172 0.0 0.0 0.0
1986 5771 0.0 0.0 0.0
1987 2441 0.0 0.0 0.0
1988 796 0.0 0.0 0.0
1989 1361 0.0 0.0 0.0
1990 1296 0.0 0.0 0.0

For data sources see[5]

References