If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354031107000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.998954,"lon":-110.321346,"icon":""}]} |
Location: 00/07-11-035-03W4/0 | |
Location Alias: 00/07-11-35-03 W4M | |
Location Alias 2: 00/07-11-035-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 03 | |
Section: 11 | |
County/Municipality: Special Areas No. 4 | |
Well Name: HIGH GROUND HZ PROVOST 7-11-35-3 | |
Operator Name: Karve Energy Inc. | |
License Number: 0479701 | |
License Date: 2016-06-20 | |
License Status: Issued | |
Spud Date: 2016-07-27 | |
Final Drill Date: 2016-07-29 | |
Well Total Depth: 1815.00 m | |
Surface Hole Latitude: 51.998954 | |
Surface Hole Longitude: -110.321346 |
Date | Event |
---|---|
2016-06-20 | Obtained License |
2016-07-27 | Surface Casing Operation Performed |
2016-07-28 | Direction Drilling Operation Performed - Deviate |
2016-07-28 | Direction Drilling Operation Performed - Horizontal |
2016-07-29 | Finished Drilling |
2016-07-29 | Well Log Performed |
2016-07-29 | Well Mode changed to Drilled and Cased |
2016-07-30 | Production Casing Operation Performed |
2016-07-30 | Rig Released |
2016-09-01 | Well Began Production |
2016-09-01 | Well Fluid changed to Crude Oil |
2016-09-01 | Well Mode changed to Pumping |
2016-09-02 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-07-27 | Bonanza Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2016-07-28 | 505.00 | Deviate (5 - 79 degrees) |
2016-07-28 | 873.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-09-02 | Multi-Stage Fracture | 1756.40 | 1756.50 | 0 |
2016-09-02 | Multi-Stage Fracture | 1479.50 | 1479.60 | 0 |
2016-09-02 | Multi-Stage Fracture | 1448.70 | 1448.80 | 0 |
2016-09-02 | Multi-Stage Fracture | 1417.90 | 1418.00 | 0 |
2016-09-02 | Multi-Stage Fracture | 1387.10 | 1387.20 | 0 |
2016-09-02 | Multi-Stage Fracture | 1356.30 | 1356.40 | 0 |
2016-09-02 | Multi-Stage Fracture | 1325.60 | 1325.70 | 0 |
2016-09-02 | Multi-Stage Fracture | 1294.80 | 1294.90 | 0 |
2016-09-02 | Multi-Stage Fracture | 1264.00 | 1264.10 | 0 |
2016-09-02 | Multi-Stage Fracture | 1233.30 | 1233.40 | 0 |
2016-09-02 | Multi-Stage Fracture | 1202.50 | 1202.60 | 0 |
2016-09-02 | Multi-Stage Fracture | 1725.60 | 1725.70 | 0 |
2016-09-02 | Multi-Stage Fracture | 1171.70 | 1171.80 | 0 |
2016-09-02 | Multi-Stage Fracture | 1140.90 | 1141.00 | 0 |
2016-09-02 | Multi-Stage Fracture | 1110.10 | 1110.20 | 0 |
2016-09-02 | Multi-Stage Fracture | 1079.30 | 1079.40 | 0 |
2016-09-02 | Multi-Stage Fracture | 1048.60 | 1048.70 | 0 |
2016-09-02 | Multi-Stage Fracture | 1017.80 | 1017.90 | 0 |
2016-09-02 | Multi-Stage Fracture | 987.20 | 987.30 | 0 |
2016-09-02 | Multi-Stage Fracture | 956.40 | 956.50 | 0 |
2016-09-02 | Multi-Stage Fracture | 925.60 | 925.70 | 0 |
2016-09-02 | Multi-Stage Fracture | 1694.90 | 1695.00 | 0 |
2016-09-02 | Multi-Stage Fracture | 1664.10 | 1664.20 | 0 |
2016-09-02 | Multi-Stage Fracture | 1633.40 | 1633.50 | 0 |
2016-09-02 | Multi-Stage Fracture | 1602.60 | 1602.70 | 0 |
2016-09-02 | Multi-Stage Fracture | 1571.80 | 1571.90 | 0 |
2016-09-02 | Multi-Stage Fracture | 1541.00 | 1541.10 | 0 |
2016-09-02 | Multi-Stage Fracture | 1510.20 | 1510.30 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-09-02 | 2016-09-02 | 756 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water - KCL ( 5%) | Not Available | 100 | 75.3572 | N/A | |||
Sand (16/30) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 19.4699 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 19.4699 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 19.4699 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 19.4698 | N/A | ||||
Sand (20/40) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 4.3162 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 4.3162 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 4.3162 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 4.3162 | N/A | ||||
Tolcide PS75LT | Canyon Technical Services | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0101 | N/A | |
Water | 7732-18-5 | 100 | 0.0101 | N/A | ||||
CAN-2300 Breaker (Enzyme HpH) | Canyon Technical Services | Breaker | Cellulase Enzyme Solution | Not Available | 100 | 0.0163 | N/A | |
CAN-2301 Breaker (Oxidizer) | Canyon Technical Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0672 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 0.0672 | N/A | ||||
CAN-2200 Crosslinker / pH buffer (Borate) | Canyon Technical Services | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.1468 | N/A | |
Monoethanolamine | 141-43-5 | 100 | 0.1468 | N/A | ||||
Water | 7732-18-5 | 100 | 0.1468 | N/A | ||||
CAN-2413 Non-emulsifier | Canyon Technical Services | Demulsifier | Isopropyl Alcohol | 67-63-0 | 100 | 0.0368 | N/A | |
Methanol | 67-56-1 | 100 | 0.0368 | N/A | ||||
Non-hazardous base ingredient(s) | Not Available | 100 | 0.0368 | N/A | ||||
Sulfonic Acids (Petroleum) | 61789-85-3 | 100 | 0.0368 | N/A | ||||
CAN-2000 Gellant (Guar) | Canyon Technical Services | Gelling Agent | Polysacharide Suspension | Not Available | 100 | 0.4595 | N/A | |
paraFLO 2 | Canyon Technical Services | Scale Inhibitor | Non-hazardous base ingredient(s) | Not Available | 100 | 0.1196 | N/A | |
Silica. crystalline-quartz | 14808-60-7 | 100 | 0.1196 | N/A | ||||
White mineral oil | 8042-47-5 | 100 | 0.1196 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2016-09-02 | 2016-09-02 | Surface Water - Runoff | 1006 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2016 | 2261 | 0.0 | 0.0 | 0.0 |
2017 | 8393 | 0.0 | 0.0 | 0.0 |
2018 | 8226 | 0.0 | 0.0 | 0.0 |
2019 | 7845 | 0.0 | 0.0 | 0.0 |
2020 | 824 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-07-30 | No Incident Encountered | 0.00 | 0.00 |
2016-08-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]