X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354030413000

Well Details

Well ID: 0354030413000
Loading map...
Location: 00/13-04-035-03W4/0
Location Alias: 00/13-04-35-03 W4M
Location Alias 2: 00/13-04-035-03 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 03
Section: 04
County/Municipality: Special Areas No. 4
Well Name: RHE PROVOST 13-4-35-3
Operator Name: Rolling Hills Energy Ltd.
License Number: 0409255
License Date: 2009-02-17
License Status: Abandoned
Spud Date: 2009-06-17
Final Drill Date: 2009-06-26
Well Total Depth: 1821.00 m
Surface Hole Latitude: 51.980388
Surface Hole Longitude: -110.363602

For data sources see[1][2]

Well History

Date Event
2009-02-17 Obtained License
2009-06-18 Well Log Performed
2009-06-19 Surface Casing Operation Performed
2009-06-21 Direction Drilling Operation Performed - Horizontal
2009-06-21 Well Log Performed
2009-06-22 Intermediate Casing Operation Performed
2009-06-26 Finished Drilling
2009-06-26 Well Log Performed
2009-06-26 Well Mode changed to Drilled and Cased
2009-06-27 Liner Casing Operation Performed
2009-06-27 Perforation Treatment Performed - Open-Hole Completion
2009-06-28 Rig Released
2009-06-30 Well Log Performed
2009-07-03 Perforation Treatment Performed - Multi-Stage Fracture
2009-07-08 Well Began Production
2009-07-08 Well Fluid changed to Gas
2009-07-08 Well Mode changed to Flowing
2009-07-15 Well Log Performed
2011-01-01 Well Fluid changed to Gas
2011-01-01 Well Mode changed to Pumping
2018-05-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-05-30 Plug Back Performed
2018-05-30 Well Log Performed
2018-05-31 Well Log Performed
2018-07-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-07-13 Plug Back Performed
2018-07-13 Well Abandoned
2018-07-13 Well Fluid changed to Gas
2018-07-13 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-06-21 470.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-06-27 Open Hole/Barefoot Completion 1816.90 1821.00 0
2018-05-30 Packing Device Capped w/Cement 808.00 816.00 0
2018-07-13 Packing Device Capped w/Cement 808.00 816.00 0
2009-07-03 Multi-Stage Fracture 1768.90 1769.00 0
2009-07-03 Multi-Stage Fracture 1668.70 1668.80 0
2009-07-03 Multi-Stage Fracture 1541.80 1541.90 0
2009-07-03 Multi-Stage Fracture 1455.00 1455.10 0
2009-07-03 Multi-Stage Fracture 1368.50 1368.60 0
2009-07-03 Multi-Stage Fracture 1287.10 1287.20 0
2009-07-03 Multi-Stage Fracture 1141.40 1141.50 0
2009-07-03 Multi-Stage Fracture 1068.00 1068.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 3685 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8768 0.0 0.0 0.0
2013 8326 0.0 0.0 0.0
2014 901 0.0 0.0 0.0
2015 7871 0.0 0.0 0.0
2016 8255 0.0 0.0 0.0
2017 4848 0.0 0.0 0.0
2018 3263 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-13 No Incident Encountered 0.00 0.00

For data sources see[7]

References