If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354023613020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.039017,"lon":-110.159909,"icon":""}]} |
Location: 02/13-36-035-02W4/0 | |
Location Alias: 02/13-36-35-02 W4M | |
Location Alias 2: 02/13-36-035-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 02 | |
Section: 36 | |
County/Municipality: Special Areas No. 4 | |
Well Name: HIGH GROUND PROVOST 13-36-35-2 | |
Operator Name: Karve Energy Inc. | |
License Number: 0421173 | |
License Date: 2010-06-15 | |
License Status: Issued | |
Spud Date: 2010-07-22 | |
Final Drill Date: 2010-07-29 | |
Well Total Depth: 2361.00 m | |
Surface Hole Latitude: 52.039017 | |
Surface Hole Longitude: -110.159909 |
Date | Event |
---|---|
2010-06-15 | Obtained License |
2010-07-23 | Surface Casing Operation Performed |
2010-07-23 | Well Log Performed |
2010-07-24 | Direction Drilling Operation Performed - Horizontal |
2010-07-26 | Intermediate Casing Operation Performed |
2010-07-29 | Finished Drilling |
2010-07-29 | Well Mode changed to Drilled and Cased |
2010-07-31 | Liner Casing Operation Performed |
2010-08-01 | Rig Released |
2010-08-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-08-29 | Perforation Treatment Performed - Open-Hole Completion |
2010-11-02 | Well Began Production |
2010-11-02 | Well Fluid changed to Gas |
2010-11-02 | Well Mode changed to Flowing |
2012-04-19 | Well Log Performed |
2018-01-26 | Well Log Performed |
2018-01-27 | Well Log Performed |
2018-01-28 | Well Log Performed |
2018-03-01 | Well Began Injection |
2018-03-01 | Well Fluid changed to Gas |
2018-03-01 | Well Type changed to Injection |
2019-11-01 | Well Fluid changed to Gas |
2019-11-01 | Well Mode changed to Suspended |
2019-11-01 | Well Type changed to Injection |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-07-24 | 460.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-08-29 | Open Hole/Barefoot Completion | 2341.50 | 2361.00 | 0 |
2010-08-29 | Multi-Stage Fracture | 1790.30 | 1790.40 | 0 |
2010-08-29 | Multi-Stage Fracture | 1728.80 | 1728.90 | 0 |
2010-08-29 | Multi-Stage Fracture | 1667.20 | 1667.30 | 0 |
2010-08-29 | Multi-Stage Fracture | 1619.10 | 1619.20 | 0 |
2010-08-29 | Multi-Stage Fracture | 1557.40 | 1557.50 | 0 |
2010-08-29 | Multi-Stage Fracture | 1482.30 | 1482.40 | 0 |
2010-08-29 | Multi-Stage Fracture | 1407.30 | 1407.40 | 0 |
2010-08-29 | Multi-Stage Fracture | 1359.30 | 1359.40 | 0 |
2010-08-29 | Multi-Stage Fracture | 1297.60 | 1297.70 | 0 |
2010-08-29 | Multi-Stage Fracture | 1222.40 | 1222.50 | 0 |
2010-08-29 | Multi-Stage Fracture | 2310.00 | 2310.10 | 0 |
2010-08-29 | Multi-Stage Fracture | 1160.80 | 1160.90 | 0 |
2010-08-29 | Multi-Stage Fracture | 1099.10 | 1099.20 | 0 |
2010-08-29 | Multi-Stage Fracture | 1010.90 | 1011.00 | 0 |
2010-08-29 | Multi-Stage Fracture | 2248.50 | 2248.60 | 0 |
2010-08-29 | Multi-Stage Fracture | 2186.90 | 2187.00 | 0 |
2010-08-29 | Multi-Stage Fracture | 2111.80 | 2111.90 | 0 |
2010-08-29 | Multi-Stage Fracture | 2036.80 | 2036.90 | 0 |
2010-08-29 | Multi-Stage Fracture | 1988.60 | 1988.70 | 0 |
2010-08-29 | Multi-Stage Fracture | 1913.60 | 1913.70 | 0 |
2010-08-29 | Multi-Stage Fracture | 1815.90 | 1816.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 1405 | 0.0 | 0.0 | 0.0 |
2011 | 7690 | 0.0 | 0.0 | 0.0 |
2012 | 8601 | 0.0 | 0.0 | 0.0 |
2013 | 8544 | 0.0 | 0.0 | 0.0 |
2014 | 8664 | 0.0 | 0.0 | 0.0 |
2015 | 8364 | 0.0 | 0.0 | 0.0 |
2016 | 7666 | 0.0 | 0.0 | 0.0 |
2017 | 6169 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2010-08-29 | No Incident Encountered | 0.00 | 0.00 |
2018-01-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]