X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354023308002

Well Details

Well ID: 0354023308002
Loading map...
Location: 00/08-33-035-02W4/2
Location Alias: 00/08-33-35-02 W4M
Location Alias 2: 00/08-33-035-02 W4/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 02
Section: 33
County/Municipality: Special Areas No. 4
Well Name: HIGH GROUND HZ PROVOST 8-33-35-2
Operator Name: Karve Energy Inc.
License Number: 0485086
License Date: 2017-08-21
License Status: Issued
Spud Date: 2017-09-04
Final Drill Date: 2017-09-10
Well Total Depth: 2407.00 m
Surface Hole Latitude: 52.062305
Surface Hole Longitude: -110.220671

For data sources see[1][2]

Well History

Date Event
2017-08-21 Obtained License
2017-09-05 Surface Casing Operation Performed
2017-09-06 Direction Drilling Operation Performed - Deviate
2017-09-06 Direction Drilling Operation Performed - Horizontal
2017-09-10 Finished Drilling
2017-09-10 Well Log Performed
2017-09-10 Well Mode changed to Drilled and Cased
2017-09-11 Production Casing Operation Performed
2017-09-11 Rig Released
2017-09-27 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-28 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-16 Well Began Production
2017-10-16 Well Fluid changed to Crude Oil
2017-10-16 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-09-06 488.40 Deviate (5 - 79 degrees)
2017-09-06 551.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-09-27 Multi-Stage Fracture 2364.60 2364.70 0
2017-09-27 Multi-Stage Fracture 1951.70 1951.80 0
2017-09-27 Multi-Stage Fracture 1908.70 1908.80 0
2017-09-27 Multi-Stage Fracture 1879.30 1879.40 0
2017-09-28 Multi-Stage Fracture 1849.90 1850.00 0
2017-09-28 Multi-Stage Fracture 1820.80 1820.90 0
2017-09-28 Multi-Stage Fracture 1791.40 1791.50 0
2017-09-28 Multi-Stage Fracture 1762.10 1762.20 0
2017-09-28 Multi-Stage Fracture 1732.70 1732.80 0
2017-09-28 Multi-Stage Fracture 1703.30 1703.40 0
2017-09-28 Multi-Stage Fracture 1673.80 1673.90 0
2017-09-27 Multi-Stage Fracture 2321.70 2321.80 0
2017-09-28 Multi-Stage Fracture 1644.40 1644.50 0
2017-09-28 Multi-Stage Fracture 1614.90 1615.00 0
2017-09-28 Multi-Stage Fracture 1585.90 1586.00 0
2017-09-28 Multi-Stage Fracture 1556.50 1556.60 0
2017-09-28 Multi-Stage Fracture 1527.10 1527.20 0
2017-09-28 Multi-Stage Fracture 1497.70 1497.80 0
2017-09-28 Multi-Stage Fracture 1468.50 1468.60 0
2017-09-28 Multi-Stage Fracture 1426.10 1426.20 0
2017-09-28 Multi-Stage Fracture 1316.20 1316.30 0
2017-09-28 Multi-Stage Fracture 1286.80 1286.90 0
2017-09-27 Multi-Stage Fracture 2225.00 2225.10 0
2017-09-28 Multi-Stage Fracture 1257.40 1257.50 0
2017-09-28 Multi-Stage Fracture 1228.00 1228.10 0
2017-09-28 Multi-Stage Fracture 1198.60 1198.70 0
2017-09-28 Multi-Stage Fracture 1169.40 1169.50 0
2017-09-28 Multi-Stage Fracture 1140.00 1140.10 0
2017-09-28 Multi-Stage Fracture 1110.60 1110.70 0
2017-09-28 Multi-Stage Fracture 1081.20 1081.30 0
2017-09-28 Multi-Stage Fracture 1052.00 1052.10 0
2017-09-28 Multi-Stage Fracture 1022.50 1022.60 0
2017-09-28 Multi-Stage Fracture 993.10 993.20 0
2017-09-27 Multi-Stage Fracture 2195.60 2195.70 0
2017-09-28 Multi-Stage Fracture 963.80 963.90 0
2017-09-27 Multi-Stage Fracture 2166.30 2166.40 0
2017-09-27 Multi-Stage Fracture 2123.40 2123.50 0
2017-09-27 Multi-Stage Fracture 2053.30 2053.40 0
2017-09-27 Multi-Stage Fracture 2024.20 2024.30 0
2017-09-27 Multi-Stage Fracture 1994.70 1994.80 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-09-27 2017-09-28 806 2,135 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 82.7325 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 8.6497 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0517 N/A
water 7732-18-5 100 0.0517 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0644 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1305 N/A
Ethylene glycol 107-21-1 100 0.1305 N/A
Potassium Carbonate 584-08-7 100 0.1305 N/A
Potassium Hydroxide 1310-58-3 100 0.1305 N/A
IH-FR-1C Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.0442 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.2649 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0607 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0607 N/A
water 7732-18-5 100 0.0607 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-09-27 2017-09-28 Groundwater - Non-saline greater than 150m deep 2135

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 1693 0.0 0.0 0.0
2018 8400 0.0 0.0 0.0
2019 8691 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-09-11 No Incident Encountered 0.00 0.00
2017-09-13 No Incident Encountered 0.00 0.00

For data sources see[9]

References