X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354022903004

Well Details

Well ID: 0354022903004
Loading map...
Location: 00/03-29-035-02W4/4
Location Alias: 00/03-29-35-02 W4M
Location Alias 2: 00/03-29-035-02 W4/04
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 02
Section: 29
County/Municipality: Special Areas No. 4
Well Name: HIGH GROUND PROVOST 3-29-35-2
Operator Name: Karve Energy Inc.
License Number: 0290590
License Date: 2003-07-29
License Status: Issued
Spud Date: 2003-09-02
Final Drill Date: 2003-09-05
Well Total Depth: 926.00 m
Surface Hole Latitude: 52.029979
Surface Hole Longitude: -110.257540

For data sources see[1][2]

Well History

Date Event
2003-07-29 Obtained License
2003-09-03 Surface Casing Operation Performed
2003-09-05 Finished Drilling
2003-09-05 Well Log Performed
2003-09-05 Well Mode changed to Drilled and Cased
2003-09-06 Production Casing Operation Performed
2003-09-06 Rig Released
2003-09-28 Perforation Treatment Performed - Jet Perforation
2003-09-28 Well Log Performed
2003-10-03 Well Log Performed
2003-10-04 Perforation Treatment Performed - Jet Perforation
2003-10-04 Well Log Performed
2006-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-01-08 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2006-01-08 Plug Back Performed
2006-01-08 Well Log Performed
2006-01-09 Perforation Treatment Performed - Jet Perforation
2006-01-09 Well Log Performed
2007-08-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-08-08 Perforation Treatment Performed - Jet Perforation
2007-08-08 Plug Back Performed
2007-08-08 Well Log Performed
2007-09-01 Well Began Production
2007-09-01 Well Fluid changed to Gas
2007-09-01 Well Mode changed to Flowing
2007-09-10 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-09-28 Perforation 896.10 896.90 17
2007-08-08 Packing Device Capped w/Cement 780.00 790.00 0
2007-08-08 Perforation 760.00 764.00 17
2007-09-10 Fracture 760.00 764.00 0
2003-09-28 Perforation 897.50 899.00 17
2003-09-28 Perforation 900.00 902.00 17
2003-10-04 Perforation 815.60 817.00 17
2003-10-04 Perforation 820.00 821.00 17
2003-10-04 Perforation 824.50 826.00 17
2006-01-08 Packing Device Capped w/Cement 875.30 883.30 0
2006-01-08 Packing Dev Cpd w/Res-Gyp Cem 811.00 814.00 0
2006-01-09 Perforation 802.00 805.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 1560 0.0 0.0 0.0
2008 7152 0.0 0.0 0.0
2009 8371 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8707 0.0 0.0 0.0
2012 8657 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8640 0.0 0.0 0.0
2015 8364 0.0 0.0 0.0
2016 5749 0.0 0.0 0.0
2017 5907 0.0 0.0 0.0
2018 1032 0.0 0.0 0.0
2019 336 0.0 0.0 0.0

For data sources see[5]

References