X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354022704000

Well Details

Well ID: 0354022704000
Loading map...
Location: 00/04-27-035-02W4/0
Location Alias: 00/04-27-35-02 W4M
Location Alias 2: 00/04-27-035-02 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 02
Section: 27
County/Municipality: Special Areas No. 4
Well Name: HIGH GROUND HZ PROVOST 4-27-35-2
Operator Name: Karve Energy Inc.
License Number: 0486503
License Date: 2017-11-24
License Status: Issued
Spud Date: 2018-01-18
Final Drill Date: 2018-01-21
Well Total Depth: 2287.00 m
Surface Hole Latitude: 52.027364
Surface Hole Longitude: -110.192947

For data sources see[1][2]

Well History

Date Event
2017-11-24 Obtained License
2018-01-19 Direction Drilling Operation Performed - Deviate
2018-01-19 Surface Casing Operation Performed
2018-01-20 Direction Drilling Operation Performed - Horizontal
2018-01-21 Finished Drilling
2018-01-21 Production Casing Operation Performed
2018-01-21 Well Log Performed
2018-01-21 Well Mode changed to Drilled and Cased
2018-01-22 Rig Released
2018-02-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-07 Well Began Production
2018-02-07 Well Fluid changed to Crude Oil
2018-02-07 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-01-18 Bonanza Drilling Inc. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-19 446.40 Deviate (5 - 79 degrees)
2018-01-20 883.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-02-03 Multi-Stage Fracture 2214.50 2214.60 0
2018-02-03 Multi-Stage Fracture 1952.50 1952.60 0
2018-02-03 Multi-Stage Fracture 1924.70 1924.80 0
2018-02-03 Multi-Stage Fracture 1896.90 1897.00 0
2018-02-03 Multi-Stage Fracture 1869.10 1869.20 0
2018-02-03 Multi-Stage Fracture 1841.40 1841.50 0
2018-02-03 Multi-Stage Fracture 1787.30 1787.40 0
2018-02-03 Multi-Stage Fracture 1746.10 1746.20 0
2018-02-03 Multi-Stage Fracture 1718.70 1718.80 0
2018-02-03 Multi-Stage Fracture 1691.00 1691.10 0
2018-02-03 Multi-Stage Fracture 1663.30 1663.40 0
2018-02-03 Multi-Stage Fracture 2186.80 2186.90 0
2018-02-03 Multi-Stage Fracture 1622.20 1622.30 0
2018-02-03 Multi-Stage Fracture 1594.50 1594.60 0
2018-02-03 Multi-Stage Fracture 1566.80 1566.90 0
2018-02-03 Multi-Stage Fracture 1485.20 1485.30 0
2018-02-03 Multi-Stage Fracture 1457.40 1457.50 0
2018-02-03 Multi-Stage Fracture 1430.10 1430.20 0
2018-02-03 Multi-Stage Fracture 1402.40 1402.50 0
2018-02-03 Multi-Stage Fracture 1374.60 1374.70 0
2018-02-03 Multi-Stage Fracture 1347.00 1347.10 0
2018-02-03 Multi-Stage Fracture 1319.70 1319.80 0
2018-02-03 Multi-Stage Fracture 2159.00 2159.10 0
2018-02-03 Multi-Stage Fracture 1279.00 1279.10 0
2018-02-03 Multi-Stage Fracture 1251.20 1251.30 0
2018-02-03 Multi-Stage Fracture 1223.50 1223.60 0
2018-02-03 Multi-Stage Fracture 1155.60 1155.70 0
2018-02-03 Multi-Stage Fracture 1128.20 1128.30 0
2018-02-03 Multi-Stage Fracture 1100.60 1100.70 0
2018-02-03 Multi-Stage Fracture 1072.90 1073.00 0
2018-02-03 Multi-Stage Fracture 1045.10 1045.20 0
2018-02-03 Multi-Stage Fracture 1004.60 1004.70 0
2018-02-03 Multi-Stage Fracture 963.50 963.60 0
2018-02-03 Multi-Stage Fracture 2131.30 2131.40 0
2018-02-04 Multi-Stage Fracture 922.80 922.90 0
2018-02-03 Multi-Stage Fracture 2103.60 2103.70 0
2018-02-03 Multi-Stage Fracture 2075.80 2075.90 0
2018-02-03 Multi-Stage Fracture 2034.60 2034.70 0
2018-02-03 Multi-Stage Fracture 2007.40 2007.50 0
2018-02-03 Multi-Stage Fracture 1979.90 1980.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-02-03 2018-02-04 752 1,653 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 79.8329 N/A
16/30 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 16.027 N/A
20/40 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 4.0067 N/A
Econocide B1008 (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.012 N/A
Methyl Alcohol 67-56-1 100 0.012 N/A
Non-Hazardous Ingredients Not Available 100 0.012 N/A
SBE-2 (Breaker) Step Energy Services Breaker Non-Hazardous Ingredients Not Available 100 0.0813 N/A
Sodium chloride 7647-14-5 100 0.0813 N/A
SBX-2 (Crosslinker) Step Energy Services Crosslinker Proprietary Trade Secret 100 0.092 N/A
Water 7732-18-5 100 0.092 N/A
SFR-106 (Friction Reducer) Step Energy Services Friction Reducer Ethoxylated Alcohol 78330-21-9 100 0.0413 N/A
Non-Hazardous Ingredients Not Available 100 0.0413 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.0413 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.3392 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.3392 N/A
SNE-2 (Non-Emulsifier) Step Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.0764 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.0764 N/A
Methanol 67-56-1 100 0.0764 N/A
Monoethanolamine 141-43-5 100 0.0764 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.0764 N/A
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- 9043-30-5 100 0.0764 N/A
Water 7732-18-5 100 0.0764 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-02-03 2018-02-04 Groundwater - Non-saline greater than 150m deep 826
2018-02-03 2018-02-04 Waste Water - Oilfield 826
2018-02-03 2018-02-04 Groundwater - Saline 827

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6833 0.0 0.0 0.0
2019 7673 0.0 0.0 0.0
2020 2140 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-22 No Incident Encountered 0.00 0.00
2018-01-24 No Incident Encountered 0.00 0.00

For data sources see[10]

References