X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354021406000

Well Details

Well ID: 0354021406000
Loading map...
Location: 00/06-14-035-02W4/0
Location Alias: 00/06-14-35-02 W4M
Location Alias 2: 00/06-14-035-02 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 02
Section: 14
County/Municipality: Special Areas No. 4
Well Name: RHE PROVOST 6-14-35-2
Operator Name: Rolling Hills Energy Ltd.
License Number: 0476471
License Date: 2015-08-07
License Status: Issued
Spud Date: 2015-08-26
Final Drill Date: 2015-09-02
Well Total Depth: 1607.00 m
Surface Hole Latitude: 52.003370
Surface Hole Longitude: -110.170515

For data sources see[1][2]

Well History

Date Event
2015-08-07 Obtained License
2015-08-27 Surface Casing Operation Performed
2015-09-01 Direction Drilling Operation Performed - Deviate
2015-09-02 Direction Drilling Operation Performed - Horizontal
2015-09-02 Finished Drilling
2015-09-02 Well Log Performed
2015-09-02 Well Mode changed to Drilled and Cased
2015-09-03 Production Casing Operation Performed
2015-09-03 Rig Released
2015-09-19 Well Log Performed
2015-09-21 Perforation Treatment Performed - Abrasa-Jet Perforation
2015-09-21 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-25 Well Began Production
2015-09-25 Well Fluid changed to Crude Oil
2015-09-25 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-09-01 Bonanza Drilling Inc. 1 N/A Drill To LD
2015-08-26 Predator Drilling Inc. 7 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-09-01 444.00 Deviate (5 - 79 degrees)
2015-09-02 886.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-09-21 Hydra Jet Perforation 1550.00 1551.90 0
2015-09-21 Multi-Stage Fracture 1298.20 1300.10 0
2015-09-21 Hydra Jet Perforation 1267.00 1268.90 0
2015-09-21 Multi-Stage Fracture 1267.00 1268.90 0
2015-09-21 Hydra Jet Perforation 1236.00 1237.90 0
2015-09-21 Multi-Stage Fracture 1236.00 1237.90 0
2015-09-21 Hydra Jet Perforation 1204.90 1206.80 0
2015-09-21 Multi-Stage Fracture 1204.90 1206.80 0
2015-09-21 Hydra Jet Perforation 1173.60 1175.50 0
2015-09-21 Multi-Stage Fracture 1173.60 1175.50 0
2015-09-21 Hydra Jet Perforation 1142.40 1144.30 0
2015-09-21 Multi-Stage Fracture 1550.00 1551.90 0
2015-09-21 Multi-Stage Fracture 1142.40 1144.30 0
2015-09-21 Hydra Jet Perforation 1111.40 1113.30 0
2015-09-21 Multi-Stage Fracture 1111.40 1113.30 0
2015-09-21 Hydra Jet Perforation 1080.10 1082.00 0
2015-09-21 Multi-Stage Fracture 1080.10 1082.00 0
2015-09-21 Hydra Jet Perforation 1049.00 1050.90 0
2015-09-21 Multi-Stage Fracture 1049.00 1050.90 0
2015-09-21 Hydra Jet Perforation 1018.50 1020.40 0
2015-09-21 Multi-Stage Fracture 1018.50 1020.40 0
2015-09-21 Hydra Jet Perforation 987.40 989.30 0
2015-09-21 Hydra Jet Perforation 1519.00 1520.90 0
2015-09-21 Multi-Stage Fracture 987.40 989.30 0
2015-09-21 Hydra Jet Perforation 956.10 958.00 0
2015-09-21 Multi-Stage Fracture 956.10 958.00 0
2015-09-21 Hydra Jet Perforation 925.50 927.40 0
2015-09-21 Multi-Stage Fracture 925.50 927.40 0
2015-09-21 Hydra Jet Perforation 894.40 896.30 0
2015-09-21 Multi-Stage Fracture 894.40 896.30 0
2015-09-21 Hydra Jet Perforation 863.10 865.00 0
2015-09-21 Multi-Stage Fracture 863.10 865.00 0
2015-09-21 Hydra Jet Perforation 832.20 834.10 0
2015-09-21 Multi-Stage Fracture 1519.00 1520.90 0
2015-09-21 Multi-Stage Fracture 832.20 834.10 0
2015-09-21 Hydra Jet Perforation 1450.60 1452.50 0
2015-09-21 Multi-Stage Fracture 1450.60 1452.50 0
2015-09-21 Hydra Jet Perforation 1366.90 1368.80 0
2015-09-21 Multi-Stage Fracture 1366.90 1368.80 0
2015-09-21 Hydra Jet Perforation 1298.20 1300.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-09-21 2015-09-21 731 627 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 72.1576 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 27.2931 N/A
IH-BEZ-6 Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0211 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1383 N/A
Ethylene glycol 107-21-1 100 0.1383 N/A
Potassium Carbonate 584-08-7 100 0.1383 N/A
Potassium Hydroxide 1310-58-3 100 0.1383 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.2822 N/A
IH-NE-6 Fusion Technologies Inc. Surfactant 2-ethyhexanol 104-76-7 100 0.1074 N/A
EO-C7-9-iso. C8-rich alcohols 78330-19-5 100 0.1074 N/A
EO-C9-11-iso. C10-rich alcohols 78330-20-8 100 0.1074 N/A
Heavy aromatic naptha 64742-94-5 100 0.1074 N/A
Isopropanol 67-63-0 100 0.1074 N/A
Methanol 67-56-1 100 0.1074 N/A
Polyethylene glycol 25322-68-3 100 0.1074 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-09-19 2015-09-19 Surface Water - Runoff 850

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2030 0.0 0.0 0.0
2016 7975 0.0 0.0 0.0
2017 8256 0.0 0.0 0.0
2018 7021 0.0 0.0 0.0
2019 7437 0.0 0.0 0.0
2020 2116 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-08-26 No Incident Encountered 0.00 0.00
2015-09-19 No Incident Encountered 0.00 0.00

For data sources see[10]

References