If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354021308020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.014494,"lon":-110.152096,"icon":""}]} |
Location: 02/08-13-035-02W4/0 | |
Location Alias: 02/08-13-35-02 W4M | |
Location Alias 2: 02/08-13-035-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 02 | |
Section: 13 | |
County/Municipality: Special Areas No. 4 | |
Well Name: HIGH GROUND HZ 102 PROVOST 8-13-35-2 | |
Operator Name: Karve Energy Inc. | |
License Number: 0481882 | |
License Date: 2016-12-14 | |
License Status: Issued | |
Spud Date: 2017-01-07 | |
Final Drill Date: 2017-01-10 | |
Well Total Depth: 1795.00 m | |
Surface Hole Latitude: 52.014494 | |
Surface Hole Longitude: -110.152096 |
Date | Event |
---|---|
2016-12-14 | Obtained License |
2017-01-08 | Surface Casing Operation Performed |
2017-01-09 | Direction Drilling Operation Performed - Deviate |
2017-01-09 | Direction Drilling Operation Performed - Horizontal |
2017-01-10 | Finished Drilling |
2017-01-10 | Well Log Performed |
2017-01-10 | Well Mode changed to Drilled and Cased |
2017-01-11 | Production Casing Operation Performed |
2017-01-11 | Rig Released |
2017-02-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-02-21 | Well Began Production |
2017-02-21 | Well Fluid changed to Crude Oil |
2017-02-21 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-01-07 | Bonanza Drilling Inc. | 3 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-01-09 | 472.80 | Deviate (5 - 79 degrees) |
2017-01-09 | 814.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-02-01 | Multi-Stage Fracture | 1764.60 | 1764.70 | 0 |
2017-02-01 | Multi-Stage Fracture | 1484.70 | 1484.80 | 0 |
2017-02-01 | Multi-Stage Fracture | 1454.00 | 1454.10 | 0 |
2017-02-01 | Multi-Stage Fracture | 1422.80 | 1422.90 | 0 |
2017-02-01 | Multi-Stage Fracture | 1391.70 | 1391.80 | 0 |
2017-02-01 | Multi-Stage Fracture | 1360.60 | 1360.70 | 0 |
2017-02-01 | Multi-Stage Fracture | 1329.50 | 1329.60 | 0 |
2017-02-01 | Multi-Stage Fracture | 1298.40 | 1298.50 | 0 |
2017-02-01 | Multi-Stage Fracture | 1267.30 | 1267.40 | 0 |
2017-02-01 | Multi-Stage Fracture | 1236.20 | 1236.30 | 0 |
2017-02-01 | Multi-Stage Fracture | 1205.10 | 1205.20 | 0 |
2017-02-01 | Multi-Stage Fracture | 1733.40 | 1733.50 | 0 |
2017-02-01 | Multi-Stage Fracture | 1174.00 | 1174.10 | 0 |
2017-02-01 | Multi-Stage Fracture | 1143.90 | 1144.00 | 0 |
2017-02-01 | Multi-Stage Fracture | 1112.80 | 1112.90 | 0 |
2017-02-01 | Multi-Stage Fracture | 1081.70 | 1081.80 | 0 |
2017-02-01 | Multi-Stage Fracture | 1050.60 | 1050.70 | 0 |
2017-02-01 | Multi-Stage Fracture | 1019.50 | 1019.60 | 0 |
2017-02-01 | Multi-Stage Fracture | 988.40 | 988.50 | 0 |
2017-02-01 | Multi-Stage Fracture | 957.30 | 957.40 | 0 |
2017-02-01 | Multi-Stage Fracture | 926.30 | 926.40 | 0 |
2017-02-01 | Multi-Stage Fracture | 895.20 | 895.30 | 0 |
2017-02-01 | Multi-Stage Fracture | 1702.30 | 1702.40 | 0 |
2017-02-01 | Multi-Stage Fracture | 864.20 | 864.30 | 0 |
2017-02-01 | Multi-Stage Fracture | 1671.20 | 1671.30 | 0 |
2017-02-01 | Multi-Stage Fracture | 1640.10 | 1640.20 | 0 |
2017-02-01 | Multi-Stage Fracture | 1609.00 | 1609.10 | 0 |
2017-02-01 | Multi-Stage Fracture | 1577.90 | 1578.00 | 0 |
2017-02-01 | Multi-Stage Fracture | 1546.90 | 1547.00 | 0 |
2017-02-01 | Multi-Stage Fracture | 1515.80 | 1515.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-02-01 | 2017-02-01 | 709 | 1,088 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Potassium Chloride | 7447-40-7 | 100 | 76.6133 | N/A | |||
Water | 7732-18-5 | 100 | 76.6133 | N/A | ||||
Sand (16/30) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 18.5798 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 18.5798 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 18.5798 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 18.5799 | N/A | ||||
Sand (20/40) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 4.1288 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 4.1288 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 4.1288 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 4.1288 | N/A | ||||
Chemcide PT | Canyon Technical Services | Bactericide/Biocide | Methyl Alcohol | 67-56-1 | 100 | 0.0078 | N/A | |
N-Coco Alkyltrimethylenediamine diacetates | 61791-64-8 | 100 | 0.0078 | N/A | ||||
CAN-2300 Breaker (Enzyme HpH) | Canyon Technical Services | Breaker | Cellulase Enzyme Solution | Not Available | 100 | 0.0499 | N/A | |
CAN-2301 Breaker (Oxidizer) | Canyon Technical Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0837 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 0.0837 | N/A | ||||
CAN-2200 Crosslinker / pH buffer (Borate) | Canyon Technical Services | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.1373 | N/A | |
Monoethanolamine | 141-43-5 | 100 | 0.1373 | N/A | ||||
Water | 7732-18-5 | 100 | 0.1373 | N/A | ||||
CAN-2413 Non-emulsifier | Canyon Technical Services | Demulsifier | Isopropyl Alcohol | 67-63-0 | 100 | 0.0333 | N/A | |
Methanol | 67-56-1 | 100 | 0.0333 | N/A | ||||
Non-hazardous base ingredient(s) | Not Available | 100 | 0.0333 | N/A | ||||
Sulfonic Acids (Petroleum) | 61789-85-3 | 100 | 0.0333 | N/A | ||||
CAN-4000 Tubular Lubricant | Canyon Technical Services | Friction Reducer | Sorbitan Triolate | 26266-58-0 | 100 | 0.0063 | N/A | |
CAN-2000 Gellant (Guar) | Canyon Technical Services | Gelling Agent | Polysacharide Suspension | Not Available | 100 | 0.2321 | N/A | |
paraFLO 2 | Canyon Technical Services | Scale Inhibitor | Non-hazardous base ingredient(s) | Not Available | 100 | 0.1272 | N/A | |
Silica. crystalline-quartz | 14808-60-7 | 100 | 0.1272 | N/A | ||||
White mineral oil | 8042-47-5 | 100 | 0.1272 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-02-01 | 2017-02-01 | Surface Water - Runoff | 1088 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 7100 | 0.0 | 0.0 | 0.0 |
2018 | 8683 | 0.0 | 0.0 | 0.0 |
2019 | 7704 | 0.0 | 0.0 | 0.0 |
2020 | 2163 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-01-11 | No Incident Encountered | 0.00 | 0.00 |
2017-01-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]