If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354021007000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.980062,"lon":-110.202759,"icon":""}]} |
Location: 00/07-10-035-02W4/0 | |
Location Alias: 00/07-10-35-02 W4M | |
Location Alias 2: 00/07-10-035-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 02 | |
Section: 10 | |
County/Municipality: Special Areas No. 4 | |
Well Name: RHE PROVOST 7-10-35-2 | |
Operator Name: Rolling Hills Energy Ltd. | |
License Number: 0479216 | |
License Date: 2016-03-30 | |
License Status: Amended | |
Spud Date: 2016-04-24 | |
Final Drill Date: 2016-05-18 | |
Well Total Depth: 1837.00 m | |
Surface Hole Latitude: 51.980062 | |
Surface Hole Longitude: -110.202759 |
Date | Event |
---|---|
2016-03-30 | Obtained License |
2016-04-24 | Surface Casing Operation Performed |
2016-05-16 | Direction Drilling Operation Performed - Deviate |
2016-05-17 | Direction Drilling Operation Performed - Horizontal |
2016-05-17 | Well Log Performed |
2016-05-18 | Finished Drilling |
2016-05-18 | Production Casing Operation Performed |
2016-05-18 | Rig Released |
2016-05-18 | Well Mode changed to Drilled and Cased |
2016-08-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-08-16 | Well Began Production |
2016-08-16 | Well Fluid changed to Crude Oil |
2016-08-16 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2016-05-16 | 421.00 | Deviate (5 - 79 degrees) |
2016-05-17 | 953.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-08-08 | Multi-Stage Fracture | 1807.20 | 1809.10 | 0 |
2016-08-08 | Multi-Stage Fracture | 1509.90 | 1511.80 | 0 |
2016-08-08 | Multi-Stage Fracture | 1477.40 | 1479.30 | 0 |
2016-08-08 | Multi-Stage Fracture | 1444.90 | 1446.80 | 0 |
2016-08-08 | Multi-Stage Fracture | 1412.30 | 1414.20 | 0 |
2016-08-08 | Multi-Stage Fracture | 1380.10 | 1382.00 | 0 |
2016-08-08 | Multi-Stage Fracture | 1347.70 | 1349.60 | 0 |
2016-08-08 | Multi-Stage Fracture | 1315.10 | 1317.00 | 0 |
2016-08-08 | Multi-Stage Fracture | 1224.90 | 1226.80 | 0 |
2016-08-08 | Multi-Stage Fracture | 1177.90 | 1179.80 | 0 |
2016-08-08 | Multi-Stage Fracture | 990.80 | 992.70 | 0 |
2016-08-08 | Multi-Stage Fracture | 1774.10 | 1776.00 | 0 |
2016-08-08 | Multi-Stage Fracture | 958.70 | 960.60 | 0 |
2016-08-08 | Multi-Stage Fracture | 924.40 | 926.30 | 0 |
2016-08-08 | Multi-Stage Fracture | 1741.40 | 1743.20 | 0 |
2016-08-08 | Multi-Stage Fracture | 1707.40 | 1709.30 | 0 |
2016-08-08 | Multi-Stage Fracture | 1674.70 | 1676.60 | 0 |
2016-08-08 | Multi-Stage Fracture | 1630.70 | 1632.60 | 0 |
2016-08-08 | Multi-Stage Fracture | 1598.20 | 1600.10 | 0 |
2016-08-08 | Multi-Stage Fracture | 1565.50 | 1567.40 | 0 |
2016-08-08 | Multi-Stage Fracture | 1532.60 | 1534.50 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-08-08 | 2016-08-08 | 757 | 735 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | 7732-18-5 | 100 | 74.0146 | N/A | |||
Frac Sand - Regular | Iron Horse Energy Services | Crystalline Silica | 14808-60-7 | 100 | 25.4684 | N/A | ||
IH-BEZ-6 | Fusion Technologies Inc. | Breaker | Ethylene glycol | 107-21-1 | 100 | 0.0239 | N/A | |
IH-CBX-5 | Fusion Technologies Inc. | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.1476 | N/A | |
Ethylene glycol | 107-21-1 | 100 | 0.1476 | N/A | ||||
Potassium Carbonate | 584-08-7 | 100 | 0.1476 | N/A | ||||
Potassium Hydroxide | 1310-58-3 | 100 | 0.1476 | N/A | ||||
IH-GA-1 | Fusion Technologies Inc. | Gelling Agent | Low toxicity mineral oil | 8042-47-5 | 100 | 0.2881 | N/A | |
IH-NE-7 | Fusion Technologies Inc. | Surfactant | 2-ethyhexanol | 104-76-7 | 100 | 0.0593 | N/A | |
EO-C7-9-iso. C8-rich alcohols | 78330-19-5 | 100 | 0.0593 | N/A | ||||
EO-C9-11-iso. C10-rich alcohols | 78330-20-8 | 100 | 0.0593 | N/A | ||||
Heavy aromatic naptha | 64742-94-5 | 100 | 0.0593 | N/A | ||||
Isopropanol | 67-63-0 | 100 | 0.0593 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0593 | N/A | ||||
Polyethylene glycol | 25322-68-3 | 100 | 0.0593 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2016-08-09 | 2016-08-09 | Surface Water - Runoff | 810 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2016 | 3238 | 0.0 | 0.0 | 0.0 |
2017 | 8321 | 0.0 | 0.0 | 0.0 |
2018 | 7030 | 0.0 | 0.0 | 0.0 |
2019 | 7354 | 0.0 | 0.0 | 0.0 |
2020 | 2020 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-05-18 | No Incident Encountered | 0.00 | 0.00 |
2016-08-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]