X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354020513020

Well Details

Well ID: 0354020513020
Loading map...
Location: 02/13-05-035-02W4/0
Location Alias: 02/13-05-35-02 W4M
Location Alias 2: 02/13-05-035-02 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 02
Section: 05
County/Municipality: Special Areas No. 4
Well Name: KARVE 102 HZ PROVOST 13-5-35-2
Operator Name: Karve Energy Inc.
License Number: 0496389
License Date: 2019-11-14
License Status: Issued
Spud Date: 2020-01-20
Final Drill Date: 2020-01-23
Well Total Depth: 2245.00 m
Surface Hole Latitude: 51.967892
Surface Hole Longitude: -110.262265

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-01-20 Ensign Drilling Inc. 348 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-01-21 453.10 Deviate (5 - 79 degrees)
2020-01-22 916.20 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-02-07 Multi-Stage Fracture 2175.40 2175.50 0
2020-02-07 Multi-Stage Fracture 1891.50 1891.60 0
2020-02-07 Multi-Stage Fracture 1850.60 1850.70 0
2020-02-07 Multi-Stage Fracture 1823.00 1823.10 0
2020-02-07 Multi-Stage Fracture 1782.10 1782.20 0
2020-02-07 Multi-Stage Fracture 1754.70 1754.80 0
2020-02-07 Multi-Stage Fracture 1714.60 1714.70 0
2020-02-07 Multi-Stage Fracture 1687.30 1687.40 0
2020-02-07 Multi-Stage Fracture 1659.70 1659.80 0
2020-02-07 Multi-Stage Fracture 1633.20 1633.30 0
2020-02-07 Multi-Stage Fracture 1567.00 1567.10 0
2020-02-07 Multi-Stage Fracture 2147.90 2148.00 0
2020-02-07 Multi-Stage Fracture 1526.10 1526.20 0
2020-02-07 Multi-Stage Fracture 1485.40 1485.50 0
2020-02-07 Multi-Stage Fracture 1458.10 1458.20 0
2020-02-07 Multi-Stage Fracture 1430.80 1430.90 0
2020-02-07 Multi-Stage Fracture 1389.90 1390.00 0
2020-02-07 Multi-Stage Fracture 1362.40 1362.50 0
2020-02-07 Multi-Stage Fracture 1334.90 1335.00 0
2020-02-07 Multi-Stage Fracture 1307.40 1307.50 0
2020-02-07 Multi-Stage Fracture 1279.90 1280.00 0
2020-02-07 Multi-Stage Fracture 1252.40 1252.50 0
2020-02-07 Multi-Stage Fracture 2120.40 2120.50 0
2020-02-07 Multi-Stage Fracture 1224.90 1225.00 0
2020-02-07 Multi-Stage Fracture 1197.40 1197.50 0
2020-02-07 Multi-Stage Fracture 1169.90 1170.00 0
2020-02-07 Multi-Stage Fracture 1142.30 1142.40 0
2020-02-07 Multi-Stage Fracture 1047.90 1048.00 0
2020-02-07 Multi-Stage Fracture 2092.80 2092.90 0
2020-02-07 Multi-Stage Fracture 2065.20 2065.30 0
2020-02-07 Multi-Stage Fracture 2024.30 2024.40 0
2020-02-07 Multi-Stage Fracture 1984.90 1985.00 0
2020-02-07 Multi-Stage Fracture 1945.40 1945.50 0
2020-02-07 Multi-Stage Fracture 1918.90 1919.00 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2020-02-07 2020-02-07 769 1,080 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 70.2568 N/A
16/30 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 22.3759 N/A
20/40 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 6.7132 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0074 N/A
Methyl Alcohol 67-56-1 100 0.0074 N/A
SBE-2 (Breaker) Step Energy Services Breaker Non-Hazardous Ingredients Not Available 100 0.0672 N/A
Sodium chloride 7647-14-5 100 0.0672 N/A
SCS-1 (Clay Control) Step Energy Services Clay Control Choline chloride 67-48-1 100 0.0962 N/A
Non-Hazardous Ingredients Not Available 100 0.0962 N/A
SBX-2C (Crosslinker) STEP Energy Services Crosslinker Boric Acid 10043-35-3 100 0.0361 N/A
Ethylene Glycol 107-21-1 100 0.0361 N/A
Monoethanolamine 141-43-5 100 0.0361 N/A
Water 7732-18-5 100 0.0361 N/A
SFR-110 (Friction Reducer) Step Energy Services Friction Reducer Mineral Oil 8012-95-1 100 0.0471 N/A
Polyacrylamide 5/8/9003 100 0.0471 N/A
Primary Alcohol Ethoxylatehigh 68131-39-5 100 0.0471 N/A
Sodium 2-Acryloylamino-2-methyl-1-propanesulfonic 15214-89-8 100 0.0471 N/A
Sodium Acrylate 7446-81-3 100 0.0471 N/A
Water 7732-18-5 100 0.0471 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.3327 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.3327 N/A
SNE-2C (Non-Emulsifier) STEP Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.0668 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.0668 N/A
Methanol 67-56-1 100 0.0668 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.0668 N/A
Water 7732-18-5 100 0.0668 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2020-01-28 2020-01-28 Municipal Water 150
2020-01-28 2020-01-28 Municipal Water 350
2020-01-28 2020-01-28 Central Water Distribution Facility 85
2020-01-28 2020-01-28 Central Water Distribution Facility 10
2020-01-28 2020-01-28 Central Water Distribution Facility 9
2020-01-28 2020-01-28 Central Water Distribution Facility 238
2020-01-28 2020-01-28 Central Water Distribution Facility 238

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 1121 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-24 No Incident Encountered 0.00 0.00
2020-02-10 No Incident Encountered 0.00 0.00

For data sources see[9]

References