X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354020404020

Well Details

Well ID: 0354020404020
Loading map...
Location: 02/04-04-035-02W4/0
Location Alias: 02/04-04-35-02 W4M
Location Alias 2: 02/04-04-035-02 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 02
Section: 04
County/Municipality: Special Areas No. 4
Well Name: RHE 102 HZ PROVOST 4-4-35-2
Operator Name: Rolling Hills Energy Ltd.
License Number: 0491748
License Date: 2018-11-02
License Status: Issued
Spud Date: 2018-11-10
Final Drill Date: 2019-01-14
Well Total Depth: 2348.00 m
Surface Hole Latitude: 51.971021
Surface Hole Longitude: -110.217925

For data sources see[1][2]

Well History

Date Event
2018-11-02 Obtained License
2018-11-11 Surface Casing Operation Performed
2019-01-13 Direction Drilling Operation Performed - Deviate
2019-01-13 Direction Drilling Operation Performed - Horizontal
2019-01-14 Finished Drilling
2019-01-14 Well Log Performed
2019-01-14 Well Mode changed to Drilled and Cased
2019-01-15 Production Casing Operation Performed
2019-01-15 Rig Released
2019-02-10 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-19 Well Began Production
2019-02-19 Well Fluid changed to Crude Oil
2019-02-19 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-11-10 Predator Drilling Inc. 27 N/A Set Surface
2019-01-12 Precision Drilling Corporation 292 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-01-13 515.70 Deviate (5 - 79 degrees)
2019-01-13 843.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-02-10 Multi-Stage Fracture 2287.60 2287.70 0
2019-02-10 Multi-Stage Fracture 1983.60 1983.70 0
2019-02-10 Multi-Stage Fracture 1956.20 1956.30 0
2019-02-10 Multi-Stage Fracture 1915.90 1916.00 0
2019-02-10 Multi-Stage Fracture 1847.90 1848.00 0
2019-02-10 Multi-Stage Fracture 1806.10 1806.20 0
2019-02-10 Multi-Stage Fracture 1778.00 1778.10 0
2019-02-10 Multi-Stage Fracture 1737.00 1737.10 0
2019-02-10 Multi-Stage Fracture 1695.80 1695.90 0
2019-02-10 Multi-Stage Fracture 1668.30 1668.40 0
2019-02-10 Multi-Stage Fracture 1628.10 1628.20 0
2019-02-10 Multi-Stage Fracture 2245.90 2246.00 0
2019-02-10 Multi-Stage Fracture 1588.70 1588.80 0
2019-02-10 Multi-Stage Fracture 1561.90 1562.00 0
2019-02-10 Multi-Stage Fracture 1534.80 1534.90 0
2019-02-10 Multi-Stage Fracture 1493.80 1493.90 0
2019-02-10 Multi-Stage Fracture 1452.90 1453.00 0
2019-02-10 Multi-Stage Fracture 1424.90 1425.00 0
2019-02-10 Multi-Stage Fracture 1383.90 1384.00 0
2019-02-10 Multi-Stage Fracture 1314.80 1314.90 0
2019-02-10 Multi-Stage Fracture 1218.50 1218.60 0
2019-02-10 Multi-Stage Fracture 1191.00 1191.10 0
2019-02-10 Multi-Stage Fracture 2217.80 2217.90 0
2019-02-10 Multi-Stage Fracture 1163.70 1163.80 0
2019-02-10 Multi-Stage Fracture 1072.50 1072.60 0
2019-02-10 Multi-Stage Fracture 1045.30 1045.40 0
2019-02-10 Multi-Stage Fracture 1017.90 1018.00 0
2019-02-10 Multi-Stage Fracture 976.70 976.80 0
2019-02-10 Multi-Stage Fracture 948.50 948.60 0
2019-02-10 Multi-Stage Fracture 921.20 921.30 0
2019-02-10 Multi-Stage Fracture 894.00 894.10 0
2019-02-10 Multi-Stage Fracture 2190.30 2190.40 0
2019-02-10 Multi-Stage Fracture 2148.70 2148.80 0
2019-02-10 Multi-Stage Fracture 2120.70 2120.80 0
2019-02-10 Multi-Stage Fracture 2093.30 2093.40 0
2019-02-10 Multi-Stage Fracture 2052.30 2052.40 0
2019-02-10 Multi-Stage Fracture 2024.20 2024.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-02-10 2019-02-10 763 1,435 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 70.3858 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 14.6183 N/A
2K7 Solution W-M Fusion Technologies Inc. Bactericide/Biocide 2-Bromo-2-nitropropane-1. 3-diol (BNPD) 52-51-7 100 0.0625 N/A
Methanol 67-56-1 100 0.0625 N/A
water 7732-18-5 100 0.0625 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.021 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1423 N/A
Ethylene glycol 107-21-1 100 0.1423 N/A
Potassium Carbonate 584-08-7 100 0.1423 N/A
Potassium Hydroxide 1310-58-3 100 0.1423 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.0939 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0575 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0575 N/A
water 7732-18-5 100 0.0575 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-02-08 2019-02-09 Surface Water - Runoff 1740

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 7186 0.0 0.0 0.0
2020 2176 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-08 No Incident Encountered 0.00 0.00
2019-02-11 No Incident Encountered 0.00 0.00

For data sources see[10]

References