X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354011816033

Well Details

Well ID: 0354011816033
Loading map...
Location: 03/16-18-035-01W4/3
Location Alias: 03/16-18-35-01 W4M
Location Alias 2: 03/16-18-035-01 W4/03
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 01
Section: 18
County/Municipality: Special Areas No. 4
Well Name: BOW RIVER PROVOST 16-18-35-1
Operator Name: Bow River Energy Ltd.
License Number: 0358792
License Date: 2006-06-13
License Status: Suspension
Spud Date: 2006-07-20
Final Drill Date: 2006-07-22
Well Total Depth: 880.00 m
Surface Hole Latitude: 52.008581
Surface Hole Longitude: -110.125879

For data sources see[1][2]

Well History

Date Event
2006-06-13 Obtained License
2006-07-20 Surface Casing Operation Performed
2006-07-21 Direction Drilling Operation Performed - Deviate
2006-07-22 Finished Drilling
2006-07-22 Production Casing Operation Performed
2006-07-22 Well Log Performed
2006-07-22 Well Mode changed to Drilled and Cased
2006-07-23 Rig Released
2006-08-27 Perforation Treatment Performed - Jet Perforation
2006-08-27 Well Log Performed
2006-08-31 Well Log Performed
2006-09-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-09-02 Perforation Treatment Performed - Jet Perforation
2006-09-02 Plug Back Performed
2006-09-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-09-03 Perforation Treatment Performed - Jet Perforation
2006-09-03 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-07-21 195.30 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-08-27 Perforation 854.00 856.50 17
2006-09-02 Packing Device Capped w/Cement 843.00 851.00 0
2006-09-02 Perforation 829.00 832.00 17
2006-09-03 Packing Device Capped w/Cement 818.00 826.00 0
2006-09-03 Perforation 758.00 759.00 17
2006-09-03 Perforation 755.00 756.00 17

For data sources see[5]



References