X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354011602000

Well Details

Well ID: 0354011602000
Loading map...
Location: 00/02-16-035-01W4/0
Location Alias: 00/02-16-35-01 W4M
Location Alias 2: 00/02-16-035-01 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 01
Section: 16
County/Municipality: Special Areas No. 4
Well Name: HIGH GROUND HZ PROVOST 2-16-35-1
Operator Name: Karve Energy Inc.
License Number: 0489329
License Date: 2018-05-30
License Status: Issued
Spud Date: 2018-06-30
Final Drill Date: 2018-07-03
Well Total Depth: 2262.00 m
Surface Hole Latitude: 52.013634
Surface Hole Longitude: -110.083888

For data sources see[1][2]

Well History

Date Event
2018-05-30 Obtained License
2018-07-01 Direction Drilling Operation Performed - Deviate
2018-07-01 Surface Casing Operation Performed
2018-07-02 Direction Drilling Operation Performed - Horizontal
2018-07-03 Finished Drilling
2018-07-03 Well Log Performed
2018-07-03 Well Mode changed to Drilled and Cased
2018-07-04 Production Casing Operation Performed
2018-07-04 Rig Released
2018-07-31 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-08 Well Began Production
2018-08-08 Well Fluid changed to Crude Oil
2018-08-08 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-06-30 Bonanza Drilling Inc. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-07-01 437.80 Deviate (5 - 79 degrees)
2018-07-02 879.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-07-31 Multi-Stage Fracture 2218.50 2218.60 0
2018-07-31 Multi-Stage Fracture 1972.90 1973.00 0
2018-07-31 Multi-Stage Fracture 1948.40 1948.50 0
2018-07-31 Multi-Stage Fracture 1922.70 1922.80 0
2018-07-31 Multi-Stage Fracture 1895.50 1895.60 0
2018-07-31 Multi-Stage Fracture 1871.20 1871.30 0
2018-07-31 Multi-Stage Fracture 1843.00 1843.10 0
2018-07-31 Multi-Stage Fracture 1814.80 1814.90 0
2018-07-31 Multi-Stage Fracture 1786.60 1786.70 0
2018-07-31 Multi-Stage Fracture 1758.50 1758.60 0
2018-07-31 Multi-Stage Fracture 1730.40 1730.50 0
2018-07-31 Multi-Stage Fracture 2190.60 2190.70 0
2018-07-31 Multi-Stage Fracture 1702.00 1702.10 0
2018-07-31 Multi-Stage Fracture 1674.10 1674.20 0
2018-07-31 Multi-Stage Fracture 1646.00 1646.10 0
2018-07-31 Multi-Stage Fracture 1617.80 1617.90 0
2018-07-31 Multi-Stage Fracture 1589.60 1589.70 0
2018-07-31 Multi-Stage Fracture 1561.50 1561.60 0
2018-07-31 Multi-Stage Fracture 1533.30 1533.40 0
2018-07-31 Multi-Stage Fracture 1505.30 1505.40 0
2018-07-31 Multi-Stage Fracture 1477.30 1477.40 0
2018-07-31 Multi-Stage Fracture 1449.10 1449.20 0
2018-07-31 Multi-Stage Fracture 2166.40 2166.50 0
2018-07-31 Multi-Stage Fracture 1420.80 1420.90 0
2018-07-31 Multi-Stage Fracture 1392.60 1392.70 0
2018-07-31 Multi-Stage Fracture 1311.10 1311.20 0
2018-07-31 Multi-Stage Fracture 1283.00 1283.10 0
2018-07-31 Multi-Stage Fracture 1254.90 1255.00 0
2018-07-31 Multi-Stage Fracture 1230.10 1230.20 0
2018-07-31 Multi-Stage Fracture 1163.00 1163.10 0
2018-07-31 Multi-Stage Fracture 1134.90 1135.00 0
2018-07-31 Multi-Stage Fracture 1106.70 1106.80 0
2018-07-31 Multi-Stage Fracture 1078.50 1078.60 0
2018-07-31 Multi-Stage Fracture 2138.20 2138.30 0
2018-07-31 Multi-Stage Fracture 1050.30 1050.40 0
2018-07-31 Multi-Stage Fracture 1022.20 1022.30 0
2018-07-31 Multi-Stage Fracture 994.00 994.10 0
2018-07-31 Multi-Stage Fracture 965.70 965.80 0
2018-07-31 Multi-Stage Fracture 923.80 923.90 0
2018-07-31 Multi-Stage Fracture 895.60 895.70 0
2018-07-31 Multi-Stage Fracture 2110.90 2111.00 0
2018-07-31 Multi-Stage Fracture 2082.80 2082.90 0
2018-07-31 Multi-Stage Fracture 2054.60 2054.70 0
2018-07-31 Multi-Stage Fracture 2026.40 2026.50 0
2018-07-31 Multi-Stage Fracture 2001.10 2001.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-07-31 2018-07-31 742 1,742 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 78.7717 N/A
16/30 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 16.5127 N/A
20/40 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 4.1281 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0076 N/A
Methyl Alcohol 67-56-1 100 0.0076 N/A
Non-Hazardous Ingredients Not Available 100 0.0076 N/A
SBE-2 (Breaker) Step Energy Services Breaker Non-Hazardous Ingredients Not Available 100 0.0716 N/A
Sodium chloride 7647-14-5 100 0.0716 N/A
SBX-2 (Crosslinker) Step Energy Services Crosslinker Proprietary Trade Secret 100 0.084 N/A
Water 7732-18-5 100 0.084 N/A
SFR-106 (Friction Reducer) Step Energy Services Friction Reducer Ethoxylated Alcohol 78330-21-9 100 0.0323 N/A
Non-Hazardous Ingredients Not Available 100 0.0323 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.0323 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.327 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.327 N/A
SNE-2 (Non-Emulsifier) Step Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.0716 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.0716 N/A
Methanol 67-56-1 100 0.0716 N/A
Monoethanolamine 141-43-5 100 0.0716 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.0716 N/A
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- 9043-30-5 100 0.0716 N/A
Water 7732-18-5 100 0.0716 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-07-31 2018-07-31 Groundwater - Non-saline greater than 150m deep 871
2018-07-31 2018-07-31 Groundwater - Saline 871
2018-07-31 2018-07-31 Waste Water - Oilfield 871

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 3110 0.0 0.0 0.0
2019 8039 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-05 No Incident Encountered 0.00 0.00
2018-08-05 No Incident Encountered 0.00 0.00

For data sources see[10]

References