If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0345062911020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.949953,"lon":-114.821147,"icon":""}]} |
Location: 02/11-29-034-06W5/0 | |
Location Alias: 02/11-29-34-06 W5M | |
Location Alias 2: 02/11-29-034-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 5 | |
Range: 06 | |
Section: 29 | |
County/Municipality: Clearwater County | |
Well Name: PWEI CAROLINE 11-29-34-6 | |
Operator Name: TAQA North Ltd. | |
License Number: 0064970 | |
License Date: 1977-07-26 | |
License Status: Suspension | |
Spud Date: 1977-08-11 | |
Final Drill Date: 1977-09-23 | |
Well Total Depth: 3073.30 m | |
Surface Hole Latitude: 51.949953 | |
Surface Hole Longitude: -114.821147 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1977-07-26 | Obtained License |
1977-09-23 | Finished Drilling |
1977-09-23 | Well Mode changed to Drilled and Cased |
1977-09-26 | Production Casing Operation Performed |
1977-10-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1977-10-21 | Perforation Treatment Performed - Jet Perforation |
1977-10-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1977-10-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1977-10-27 | Perforation Treatment Performed - Jet Perforation |
1977-10-30 | Perforation Treatment Performed - Fractured |
1977-11-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1977-11-24 | Perforation Treatment Performed - Jet Perforation |
1977-11-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1977-11-26 | Perforation Treatment Performed - Fractured |
1977-12-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1977-12-12 | Perforation Treatment Performed - Jet Perforation |
1977-12-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1977-12-17 | Perforation Treatment Performed - Fractured |
1978-01-28 | Well Began Production |
1978-01-28 | Well Fluid changed to Crude Oil |
1978-01-28 | Well Mode changed to Pumping |
1981-07-15 | Well Fluid changed to Crude Oil |
1981-07-15 | Well Mode changed to Suspended |
1990-08-09 | Perforation Treatment Performed - Cement Squeeze |
1990-08-09 | Well Fluid changed to Crude Oil |
1990-08-09 | Well Mode changed to Suspended |
1990-08-11 | Perforation Treatment Performed - Jet Perforation |
1990-08-13 | Perforation Treatment Performed - Cement Squeeze |
1990-08-14 | Perforation Treatment Performed - Jet Perforation |
1990-08-16 | Perforation Treatment Performed - Jet Perforation |
1990-08-21 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1977-10-21 | Perforation | 2998.30 | 2999.50 | 7 |
1977-11-24 | Perforation | 2920.00 | 2922.40 | 7 |
1977-11-25 | Acid Treatment | 2914.80 | 2922.40 | 0 |
1977-11-26 | Fracture | 2914.80 | 2922.40 | 0 |
1977-12-08 | Packing Device Capped w/Cement | 2792.30 | 2795.00 | 0 |
1977-12-12 | Perforation | 2719.40 | 2724.30 | 13 |
1977-12-13 | Acid Treatment | 2719.40 | 2724.30 | 0 |
1977-12-17 | Fracture | 2719.40 | 2724.30 | 0 |
1990-08-09 | Cement Squeeze | 2719.40 | 2724.30 | 0 |
1990-08-11 | Perforation | 2914.80 | 2917.20 | 7 |
1990-08-11 | Perforation | 2920.00 | 2922.40 | 7 |
1977-10-21 | Perforation | 3002.00 | 3003.20 | 7 |
1990-08-13 | Cement Squeeze | 2914.80 | 2922.40 | 0 |
1990-08-14 | Perforation | 2937.10 | 2940.70 | 7 |
1990-08-16 | Perforation | 2936.40 | 2946.20 | 13 |
1990-08-21 | Fracture | 2936.40 | 2946.20 | 0 |
1977-10-21 | Acid Treatment | 2998.30 | 3003.20 | 0 |
1977-10-26 | Packing Device Capped w/Cement | 2976.10 | 2984.00 | 0 |
1977-10-27 | Perforation | 2937.10 | 2940.70 | 7 |
1977-10-27 | Acid Treatment | 2937.10 | 2940.70 | 0 |
1977-10-30 | Fracture | 2937.10 | 2940.70 | 0 |
1977-11-23 | Packing Device Capped w/Cement | 2933.10 | 2935.20 | 0 |
1977-11-24 | Perforation | 2914.80 | 2917.20 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1978 | 5879 | 0.0 | 0.0 | 0.0 |
1979 | 6384 | 0.0 | 0.0 | 0.0 |
1980 | 6435 | 0.0 | 0.0 | 0.0 |
1981 | 1550 | 0.0 | 0.0 | 0.0 |
For data sources see[5]