X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0345043614022

Well Details

Well ID: 0345043614022
Loading map...
Location: 02/14-36-034-04W5/2
Location Alias: 02/14-36-34-04 W5M
Location Alias 2: 02/14-36-034-04 W5/02
Country: Canada
Province: Alberta
Township: 034
Meridian: 5
Range: 04
Section: 36
County/Municipality: Red Deer County
Well Name: VH1 102 GARR 14-36-34-4
Operator Name: Harvest Operations Corp.
License Number: 0095825
License Date: 1982-05-04
License Status: Abandoned
Spud Date: 1982-05-02
Final Drill Date: 1982-05-25
Well Total Depth: 2460.00 m
Surface Hole Latitude: 51.966698
Surface Hole Longitude: -114.439559

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-05-04 Obtained License
1982-05-12 Lost Circulation Occurred
1982-05-20 Drill Stem Test Performed
1982-05-25 Finished Drilling
1982-05-26 Drill Stem Test Performed
1982-05-27 Drill Stem Test Performed
1982-05-29 Production Casing Operation Performed
1982-06-17 Perforation Treatment Performed - Jet Perforation
1982-06-25 Perforation Treatment Performed - Cement Squeeze
1982-06-27 Perforation Treatment Performed - Jet Perforation
1982-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-30 Perforation Treatment Performed - Jet Perforation
1982-07-04 Perforation Treatment Performed - Fractured
1982-07-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-07-10 Perforation Treatment Performed - Jet Perforation
1982-07-11 Perforation Treatment Performed - Fractured
1982-07-16 Perforation Treatment Performed - Jet Perforation
1982-07-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-07-17 Perforation Treatment Performed - Jet Perforation
1982-07-18 Perforation Treatment Performed - Fractured
1984-06-16 Perforation Treatment Performed - Jet Perforation
1984-06-18 Perforation Treatment Performed - Jet Perforation
1984-06-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-06-20 Perforation Treatment Performed - Fractured
1984-07-26 Well Mode changed to Drilled and Cased
1985-05-01 Well Began Production
1985-05-01 Well Fluid changed to Gas
1985-05-01 Well Mode changed to Flowing
1993-07-01 Well Fluid changed to Gas
1993-07-01 Well Mode changed to Suspended
2001-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-02 Perforation Treatment Performed - Jet Perforation
2001-03-02 Plug Back Performed
2001-03-03 Perforation Treatment Performed - Cement Squeeze
2001-03-05 Perforation Treatment Performed - Cement Plug
2001-03-05 Well Fluid changed to Gas
2001-03-05 Well Mode changed to Abandoned and Re-entered
2008-04-05 Well Log Performed
2008-05-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-06-17 Perforation 2180.00 2183.00 7
1982-07-11 Fracture 2180.00 2183.00 0
1982-07-16 Perforation 2180.00 2183.00 7
1982-07-17 Packing Device Capped w/Cement 2141.00 2149.00 0
1982-07-17 Perforation 1898.00 1903.00 7
1982-07-18 Fracture 1898.00 1903.00 0
1984-06-16 Perforation 2180.00 2183.00 7
1984-06-18 Perforation 2172.00 2174.00 13
1984-06-19 Packing Device Capped w/Cement 2177.00 2181.00 0
1984-06-20 Fracture 2172.00 2174.00 0
2001-03-02 Packing Device Capped w/Cement 2114.00 2122.00 0
1982-06-25 Cement Squeeze 2180.00 2183.00 0
2001-03-02 Packing Device Capped w/Cement 1862.00 1870.00 0
2001-03-02 Perforation 557.00 558.00 9
2001-03-03 Cement Squeeze 557.00 558.00 0
2001-03-05 Cement Plug 470.00 545.00 0
1982-06-27 Perforation 2364.00 2373.50 7
1982-06-28 Acid Treatment 2364.00 2373.50 0
1982-06-30 Perforation 2367.50 2371.00 7
1982-07-04 Fracture 2364.00 2373.50 0
1982-07-06 Packing Device Capped w/Cement 2292.00 2300.00 0
1982-07-06 Packing Device Capped w/Cement 2188.50 2191.50 0
1982-07-10 Perforation 2180.00 2183.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 4128 0.0 0.0 0.0
1986 6246 0.0 0.0 0.0
1987 5818 0.0 0.0 0.0
1988 8028 0.0 0.0 0.0
1989 8592 0.0 0.0 0.0
1990 6584 0.0 0.0 0.0
1991 7541 0.0 0.0 0.0
1992 7994 0.0 0.0 0.0
1993 3521 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1982-05-12 Lost Circulation 1131.00 1131.00

For data sources see[6]

References