If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0345043001000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.956961,"lon":-114.552675,"icon":""}]} |
Location: 00/01-30-034-04W5/0 | |
Location Alias: 00/01-30-34-04 W5M | |
Location Alias 2: 00/01-30-034-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 5 | |
Range: 04 | |
Section: 30 | |
County/Municipality: Clearwater County | |
Well Name: CVE CAROL 1-30-34-4 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0425150 | |
License Date: 2010-10-27 | |
License Status: Issued | |
Spud Date: 2010-12-14 | |
Final Drill Date: 2011-01-19 | |
Well Total Depth: 3583.00 m | |
Surface Hole Latitude: 51.956961 | |
Surface Hole Longitude: -114.552675 |
Date | Event |
---|---|
2010-10-27 | Obtained License |
2010-12-16 | Surface Casing Operation Performed |
2010-12-31 | Direction Drilling Operation Performed - Horizontal |
2011-01-09 | Intermediate Casing Operation Performed |
2011-01-10 | Well Log Performed |
2011-01-19 | Finished Drilling |
2011-01-19 | Well Log Performed |
2011-01-19 | Well Mode changed to Drilled and Cased |
2011-01-24 | Liner Casing Operation Performed |
2011-01-24 | Perforation Treatment Performed - Open-Hole Completion |
2011-01-25 | Rig Released |
2011-02-25 | Well Log Performed |
2011-03-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-03-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-06-01 | Well Began Production |
2011-06-01 | Well Fluid changed to Crude Oil |
2011-06-01 | Well Mode changed to Flowing |
2011-06-23 | Well Fluid changed to Crude Oil |
2011-06-23 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-12-31 | 1793.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-24 | Open Hole/Barefoot Completion | 3553.70 | 3583.00 | 0 |
2011-03-04 | Multi-Stage Fracture | 3545.40 | 3545.50 | 0 |
2011-03-04 | Multi-Stage Fracture | 3541.10 | 3541.20 | 0 |
2011-03-04 | Multi-Stage Fracture | 3433.80 | 3433.90 | 0 |
2011-03-04 | Multi-Stage Fracture | 3329.50 | 3329.60 | 0 |
2011-03-04 | Multi-Stage Fracture | 3224.60 | 3224.70 | 0 |
2011-03-04 | Multi-Stage Fracture | 3119.50 | 3119.60 | 0 |
2011-03-05 | Multi-Stage Fracture | 3044.30 | 3044.40 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 3473 | 0.0 | 0.0 | 0.0 |
2012 | 8615 | 0.0 | 0.0 | 0.0 |
2013 | 8399 | 0.0 | 0.0 | 0.0 |
2014 | 3918 | 0.0 | 0.0 | 0.0 |
2015 | 8015 | 0.0 | 0.0 | 0.0 |
2016 | 8687 | 0.0 | 0.0 | 0.0 |
2017 | 8638 | 0.0 | 0.0 | 0.0 |
2018 | 8397 | 0.0 | 0.0 | 0.0 |
2019 | 2063 | 0.0 | 0.0 | 0.0 |
For data sources see[6]