X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0345042611022

Well Details

Well ID: 0345042611022
Loading map...
Location: 02/11-26-034-04W5/2
Location Alias: 02/11-26-34-04 W5M
Location Alias 2: 02/11-26-034-04 W5/02
Country: Canada
Province: Alberta
Township: 034
Meridian: 5
Range: 04
Section: 26
County/Municipality: Red Deer County
Well Name: NCE PET 02 GARRINGTON 11-26-34-4
Operator Name: NAL Resources Limited
License Number: 0057227
License Date: 1976-02-24
License Status: RecCertified
Spud Date: 1976-02-23
Final Drill Date: 1976-03-14
Well Total Depth: 2522.20 m
Surface Hole Latitude: 51.950829
Surface Hole Longitude: -114.466787

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-02-24 Obtained License
1976-03-14 Finished Drilling
1976-03-14 Well Mode changed to Drilled and Cased
1976-03-15 Drill Stem Test Performed
1976-03-17 Production Casing Operation Performed
1976-05-14 Perforation Treatment Performed - Jet Perforation
1976-05-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-05-20 Perforation Treatment Performed - Jet Perforation
1976-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-05-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-05-30 Perforation Treatment Performed - Jet Perforation
1976-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-06-03 Perforation Treatment Performed - Fractured
1996-07-14 Perforation Treatment Performed - Jet Perforation
1996-07-15 Perforation Treatment Performed - Jet Perforation
1996-07-15 Well Log Performed
1996-07-18 Perforation Treatment Performed - Fractured
1996-07-21 Well Log Performed
1998-01-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-01-17 Plug Back Performed
1998-01-17 Well Log Performed
1998-01-19 Well Log Performed
1998-01-20 Perforation Treatment Performed - Jet Perforation
1998-01-26 Perforation Treatment Performed - Jet Perforation
1998-01-26 Well Log Performed
1998-01-28 Perforation Treatment Performed - Fractured
1998-02-18 Well Began Production
1998-02-18 Well Fluid changed to Gas
1998-02-18 Well Mode changed to Flowing
1998-02-19 Well Fluid changed to Gas
1998-02-19 Well Mode changed to Flowing
2008-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-09-28 Plug Back Performed
2008-09-28 Well Fluid changed to Gas
2008-09-28 Well Log Performed
2008-09-28 Well Mode changed to Abandoned Zone
2008-09-29 Perforation Treatment Performed - Jet Perforation
2008-09-29 Well Log Performed
2008-09-30 Perforation Treatment Performed - Remedial Casing
2008-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-10-01 Perforation Treatment Performed - Jet Perforation
2008-10-01 Well Log Performed
2008-10-02 Perforation Treatment Performed - Remedial Casing
2008-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-10-03 Perforation Treatment Performed - Jet Perforation
2008-10-03 Well Log Performed
2008-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-10-04 Perforation Treatment Performed - Remedial Casing
2008-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-11-26 Well Log Performed
2008-12-06 Well Abandoned
2008-12-06 Well Fluid changed to Gas
2008-12-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-05-14 Perforation 2448.20 2451.20 3
1976-05-31 Acid Treatment 2395.10 2404.30 0
1976-06-03 Fracture 2395.10 2404.30 0
1996-07-14 Perforation 2448.20 2451.20 3
1996-07-15 Perforation 2448.20 2451.20 18
1996-07-18 Fracture 2448.20 2451.20 0
1998-01-17 Packing Device Capped w/Cement 2433.50 2441.50 0
1998-01-17 Packing Device Capped w/Cement 2382.00 2390.00 0
1998-01-20 Perforation 2206.00 2209.00 20
1998-01-26 Perforation 2206.00 2209.00 17
1998-01-28 Fracture 2206.00 2209.00 0
1976-05-17 Acid Treatment 2448.20 2451.20 0
2008-09-28 Packing Device Capped w/Cement 2194.00 2202.00 0
2008-09-29 Perforation 1570.00 1571.00 6
2008-09-30 Remedial Casing Cementing 1570.00 1571.00 0
2008-10-01 Packing Device Capped w/Cement 1557.00 1565.00 0
2008-10-01 Perforation 1255.00 1256.00 6
2008-10-02 Remedial Casing Cementing 1255.00 1256.00 0
2008-10-03 Packing Device Capped w/Cement 1239.00 1247.00 0
2008-10-03 Perforation 719.00 720.00 6
2008-10-04 Remedial Casing Cementing 719.00 720.00 0
2008-10-04 Packing Device Capped w/Cement 694.00 714.00 0
1976-05-20 Perforation 2498.10 2499.40 3
2008-11-26 Packing Device Capped w/Cement 30.00 230.00 0
1976-05-20 Perforation 2500.00 2502.40 3
1976-05-21 Acid Treatment 2498.10 2502.40 0
1976-05-29 Packing Device Capped w/Cement 2490.20 2490.20 0
1976-05-29 Packing Device Capped w/Cement 2444.50 2444.50 0
1976-05-30 Perforation 2395.10 2396.30 3
1976-05-30 Perforation 2398.80 2404.30 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 7403 0.0 0.0 0.0
1999 8087 0.0 0.0 0.0
2000 8377 0.0 0.0 0.0
2001 8596 0.0 0.0 0.0
2002 8509 0.0 0.0 0.0
2003 8172 0.0 0.0 0.0
2004 7898 0.0 0.0 0.0
2005 8390 0.0 0.0 0.0
2006 8179 0.0 0.0 0.0
2007 8089 0.0 0.0 0.0
2008 4199 0.0 0.0 0.0

For data sources see[5]

References