If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0345042611022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.950829,"lon":-114.466787,"icon":""}]} |
Location: 02/11-26-034-04W5/2 | |
Location Alias: 02/11-26-34-04 W5M | |
Location Alias 2: 02/11-26-034-04 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 5 | |
Range: 04 | |
Section: 26 | |
County/Municipality: Red Deer County | |
Well Name: NCE PET 02 GARRINGTON 11-26-34-4 | |
Operator Name: NAL Resources Limited | |
License Number: 0057227 | |
License Date: 1976-02-24 | |
License Status: RecCertified | |
Spud Date: 1976-02-23 | |
Final Drill Date: 1976-03-14 | |
Well Total Depth: 2522.20 m | |
Surface Hole Latitude: 51.950829 | |
Surface Hole Longitude: -114.466787 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-02-24 | Obtained License |
1976-03-14 | Finished Drilling |
1976-03-14 | Well Mode changed to Drilled and Cased |
1976-03-15 | Drill Stem Test Performed |
1976-03-17 | Production Casing Operation Performed |
1976-05-14 | Perforation Treatment Performed - Jet Perforation |
1976-05-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-05-20 | Perforation Treatment Performed - Jet Perforation |
1976-05-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-05-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1976-05-30 | Perforation Treatment Performed - Jet Perforation |
1976-05-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-06-03 | Perforation Treatment Performed - Fractured |
1996-07-14 | Perforation Treatment Performed - Jet Perforation |
1996-07-15 | Perforation Treatment Performed - Jet Perforation |
1996-07-15 | Well Log Performed |
1996-07-18 | Perforation Treatment Performed - Fractured |
1996-07-21 | Well Log Performed |
1998-01-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-01-17 | Plug Back Performed |
1998-01-17 | Well Log Performed |
1998-01-19 | Well Log Performed |
1998-01-20 | Perforation Treatment Performed - Jet Perforation |
1998-01-26 | Perforation Treatment Performed - Jet Perforation |
1998-01-26 | Well Log Performed |
1998-01-28 | Perforation Treatment Performed - Fractured |
1998-02-18 | Well Began Production |
1998-02-18 | Well Fluid changed to Gas |
1998-02-18 | Well Mode changed to Flowing |
1998-02-19 | Well Fluid changed to Gas |
1998-02-19 | Well Mode changed to Flowing |
2008-09-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-09-28 | Plug Back Performed |
2008-09-28 | Well Fluid changed to Gas |
2008-09-28 | Well Log Performed |
2008-09-28 | Well Mode changed to Abandoned Zone |
2008-09-29 | Perforation Treatment Performed - Jet Perforation |
2008-09-29 | Well Log Performed |
2008-09-30 | Perforation Treatment Performed - Remedial Casing |
2008-10-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-10-01 | Perforation Treatment Performed - Jet Perforation |
2008-10-01 | Well Log Performed |
2008-10-02 | Perforation Treatment Performed - Remedial Casing |
2008-10-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-10-03 | Perforation Treatment Performed - Jet Perforation |
2008-10-03 | Well Log Performed |
2008-10-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-10-04 | Perforation Treatment Performed - Remedial Casing |
2008-11-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-11-26 | Well Log Performed |
2008-12-06 | Well Abandoned |
2008-12-06 | Well Fluid changed to Gas |
2008-12-06 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-05-14 | Perforation | 2448.20 | 2451.20 | 3 |
1976-05-31 | Acid Treatment | 2395.10 | 2404.30 | 0 |
1976-06-03 | Fracture | 2395.10 | 2404.30 | 0 |
1996-07-14 | Perforation | 2448.20 | 2451.20 | 3 |
1996-07-15 | Perforation | 2448.20 | 2451.20 | 18 |
1996-07-18 | Fracture | 2448.20 | 2451.20 | 0 |
1998-01-17 | Packing Device Capped w/Cement | 2433.50 | 2441.50 | 0 |
1998-01-17 | Packing Device Capped w/Cement | 2382.00 | 2390.00 | 0 |
1998-01-20 | Perforation | 2206.00 | 2209.00 | 20 |
1998-01-26 | Perforation | 2206.00 | 2209.00 | 17 |
1998-01-28 | Fracture | 2206.00 | 2209.00 | 0 |
1976-05-17 | Acid Treatment | 2448.20 | 2451.20 | 0 |
2008-09-28 | Packing Device Capped w/Cement | 2194.00 | 2202.00 | 0 |
2008-09-29 | Perforation | 1570.00 | 1571.00 | 6 |
2008-09-30 | Remedial Casing Cementing | 1570.00 | 1571.00 | 0 |
2008-10-01 | Packing Device Capped w/Cement | 1557.00 | 1565.00 | 0 |
2008-10-01 | Perforation | 1255.00 | 1256.00 | 6 |
2008-10-02 | Remedial Casing Cementing | 1255.00 | 1256.00 | 0 |
2008-10-03 | Packing Device Capped w/Cement | 1239.00 | 1247.00 | 0 |
2008-10-03 | Perforation | 719.00 | 720.00 | 6 |
2008-10-04 | Remedial Casing Cementing | 719.00 | 720.00 | 0 |
2008-10-04 | Packing Device Capped w/Cement | 694.00 | 714.00 | 0 |
1976-05-20 | Perforation | 2498.10 | 2499.40 | 3 |
2008-11-26 | Packing Device Capped w/Cement | 30.00 | 230.00 | 0 |
1976-05-20 | Perforation | 2500.00 | 2502.40 | 3 |
1976-05-21 | Acid Treatment | 2498.10 | 2502.40 | 0 |
1976-05-29 | Packing Device Capped w/Cement | 2490.20 | 2490.20 | 0 |
1976-05-29 | Packing Device Capped w/Cement | 2444.50 | 2444.50 | 0 |
1976-05-30 | Perforation | 2395.10 | 2396.30 | 3 |
1976-05-30 | Perforation | 2398.80 | 2404.30 | 3 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1998 | 7403 | 0.0 | 0.0 | 0.0 |
1999 | 8087 | 0.0 | 0.0 | 0.0 |
2000 | 8377 | 0.0 | 0.0 | 0.0 |
2001 | 8596 | 0.0 | 0.0 | 0.0 |
2002 | 8509 | 0.0 | 0.0 | 0.0 |
2003 | 8172 | 0.0 | 0.0 | 0.0 |
2004 | 7898 | 0.0 | 0.0 | 0.0 |
2005 | 8390 | 0.0 | 0.0 | 0.0 |
2006 | 8179 | 0.0 | 0.0 | 0.0 |
2007 | 8089 | 0.0 | 0.0 | 0.0 |
2008 | 4199 | 0.0 | 0.0 | 0.0 |
For data sources see[5]