X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0345041511000

Well Details

Well ID: 0345041511000
Loading map...
Location: 00/11-15-034-04W5/0
Location Alias: 00/11-15-34-04 W5M
Location Alias 2: 00/11-15-034-04 W5/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 5
Range: 04
Section: 15
County/Municipality: Mountain View County
Well Name: AMOCO GARRINGTON 11-15MU-34-4
Operator Name: BP Canada Energy Group ULC
License Number: 0020560
License Date: 1961-03-13
License Status: RecCertified
Spud Date: 1961-03-15
Final Drill Date: 1961-05-29
Well Total Depth: 2598.40 m
Surface Hole Latitude: 51.920645
Surface Hole Longitude: -114.488784

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-03-13 Obtained License
1961-05-11 Drill Stem Test Performed
1961-05-15 Drill Stem Test Performed
1961-05-16 Drill Stem Test Performed
1961-05-29 Finished Drilling
1961-05-29 Well Mode changed to Drilled and Cased
1961-05-30 Drill Stem Test Performed
1961-06-01 Production Casing Operation Performed
1961-06-10 Perforation Treatment Performed - Jet Perforation
1961-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-06-15 Perforation Treatment Performed - Fractured
1961-06-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1961-06-26 Perforation Treatment Performed - Jet Perforation
1961-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-06-29 Perforation Treatment Performed - Fractured
1961-07-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1961-07-05 Perforation Treatment Performed - Jet Perforation
1961-07-06 Perforation Treatment Performed - Acid Wash - No Pressure
1961-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1961-07-07 Perforation Treatment Performed - Jet Perforation
1961-07-08 Perforation Treatment Performed - Fractured
1961-09-12 Well Began Production
1961-09-12 Well Fluid changed to Crude Oil
1961-09-12 Well Mode changed to Flowing
1966-07-18 Perforation Treatment Performed - Jet Perforation
1966-07-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1966-07-21 Perforation Treatment Performed - Fractured
1966-07-21 Well Fluid changed to Crude Oil
1966-07-21 Well Mode changed to Flowing
1976-06-09 Well Fluid changed to Crude Oil
1976-06-09 Well Mode changed to Pumping
1982-11-30 Well Fluid changed to Crude Oil
1982-11-30 Well Mode changed to Pumping
1984-10-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-10-11 Plug Back Performed
1986-07-01 Well Fluid changed to Crude Oil
1986-07-01 Well Mode changed to Suspended
1993-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-06-20 Perforation Treatment Performed - Jet Perforation
1993-06-20 Plug Back Performed
1993-06-21 Perforation Treatment Performed - Remedial Casing
1993-06-21 Well Fluid changed to Crude Oil
1993-06-21 Well Mode changed to Abandoned
1993-06-22 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-06-10 Perforation 2555.70 2556.70 7
1961-06-27 Acid Treatment 2490.50 2500.60 0
1961-06-29 Fracture 2490.50 2500.60 0
1961-07-04 Packing Device Capped w/Cement 2481.10 2481.10 0
1961-07-05 Perforation 2464.90 2467.40 7
1961-07-06 Acid Wash 2464.90 2467.40 0
1961-07-07 Packing Device Capped w/Cement 2443.00 2443.00 0
1961-07-07 Perforation 1984.60 1989.40 7
1961-07-08 Fracture 1984.60 1989.40 0
1966-07-18 Perforation 2260.10 2260.40 13
1966-07-18 Perforation 2261.00 2262.80 13
1961-06-10 Perforation 2557.90 2559.70 7
1966-07-18 Perforation 2266.50 2268.90 13
1966-07-21 Fracture 2260.10 2268.90 0
1966-07-21 Packing Device Capped w/Cement 1999.20 1999.20 0
1984-10-11 Packing Device Capped w/Cement 1994.00 1997.60 0
1993-06-20 Packing Device Capped w/Cement 1969.00 1977.00 0
1993-06-20 Perforation 600.00 601.00 13
1993-06-21 Remedial Casing Cementing 600.00 601.00 0
1961-06-11 Acid Treatment 2555.70 2559.70 0
1961-06-15 Acid Treatment 2555.70 2559.70 0
1961-06-15 Fracture 2555.70 2559.70 0
1961-06-24 Packing Device Capped w/Cement 2540.80 2540.80 0
1961-06-26 Perforation 2490.50 2491.70 7
1961-06-26 Perforation 2496.00 2497.80 7
1961-06-26 Perforation 2499.40 2500.60 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 744 0.0 0.0 0.0
1969 6528 0.0 0.0 0.0
1970 7824 0.0 0.0 0.0
1971 6456 0.0 0.0 0.0
1972 8112 0.0 0.0 0.0
1973 6720 0.0 0.0 0.0
1974 7584 0.0 0.0 0.0
1975 7799 0.0 0.0 0.0
1976 6144 0.0 0.0 0.0
1977 5832 0.0 0.0 0.0
1978 7416 0.0 0.0 0.0
1979 6168 0.0 0.0 0.0
1980 7775 0.0 0.0 0.0
1981 6768 0.0 0.0 0.0
1982 5808 0.0 0.0 0.0
1983 7608 0.0 0.0 0.0
1984 7841 0.0 0.0 0.0
1985 3615 0.0 0.0 0.0
1986 908 0.0 0.0 0.0

For data sources see[5]

References