X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0345031811000

Well Details

Well ID: 0345031811000
Loading map...
Location: 00/11-18-034-03W5/0
Location Alias: 00/11-18-34-03 W5M
Location Alias 2: 00/11-18-034-03 W5/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 5
Range: 03
Section: 18
County/Municipality: Red Deer County
Well Name: WHITECAP GARR 11-18-34-3
Operator Name: Whitecap Resources Inc.
License Number: 0051851
License Date: 1974-11-14
License Status: Abandoned
Spud Date: 1974-12-05
Final Drill Date: 1974-12-26
Well Total Depth: 2560.30 m
Surface Hole Latitude: 51.921184
Surface Hole Longitude: -114.420760

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-11-14 Obtained License
1974-12-26 Finished Drilling
1974-12-26 Well Mode changed to Drilled and Cased
1974-12-27 Drill Stem Test Performed
1974-12-28 Drill Stem Test Performed
1974-12-29 Drill Stem Test Performed
1974-12-30 Production Casing Operation Performed
1975-01-15 Perforation Treatment Performed - Jet Perforation
1975-01-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-01-20 Perforation Treatment Performed - Fractured
1975-02-01 Well Began Production
1975-02-01 Well Fluid changed to Crude Oil
1975-02-01 Well Mode changed to Flowing
1975-06-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-06-16 Well Fluid changed to Crude Oil
1975-06-16 Well Mode changed to Abandoned Zone
1975-06-22 Perforation Treatment Performed - Jet Perforation
1975-06-23 Perforation Treatment Performed - Jet Perforation
1975-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-06-25 Perforation Treatment Performed - Fractured
1988-03-02 Well Log Performed
1988-03-03 Perforation Treatment Performed - Jet Perforation
1988-03-03 Well Fluid changed to Crude Oil
1988-03-03 Well Log Performed
1988-03-03 Well Mode changed to Suspended
1988-03-09 Perforation Treatment Performed - Fractured
1988-03-20 Perforation Treatment Performed - Jet Perforation
1988-03-20 Well Log Performed
1988-03-28 Well Log Performed
1988-10-01 Well Fluid changed to Crude Oil
1988-10-01 Well Mode changed to Flowing
1998-07-01 Well Fluid changed to Crude Oil
1998-07-01 Well Mode changed to Suspended
2001-02-11 Well Log Performed
2001-02-13 Perforation Treatment Performed - Jet Perforation
2001-02-13 Well Log Performed
2001-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-02-14 Well Log Performed
2001-02-16 Perforation Treatment Performed - Fractured
2006-07-26 Perforation Treatment Performed - Cement Squeeze
2009-06-25 Well Log Performed
2009-06-27 Perforation Treatment Performed - Cement Plug
2009-06-27 Perforation Treatment Performed - Cement Squeeze
2009-06-27 Perforation Treatment Performed - Jet Perforation
2009-06-27 Perforation Treatment Performed - Remedial Casing
2009-06-27 Plug Back Performed
2009-06-27 Well Fluid changed to Crude Oil
2009-06-27 Well Log Performed
2009-06-27 Well Mode changed to Abandoned Zone
2009-06-29 Perforation Treatment Performed - Cement Plug
2009-06-29 Perforation Treatment Performed - Jet Perforation
2009-06-29 Perforation Treatment Performed - Remedial Casing
2009-06-29 Plug Back Performed
2009-06-29 Well Log Performed
2009-06-30 Perforation Treatment Performed - Remedial Casing
2009-07-02 Perforation Treatment Performed - Cement Plug
2009-07-02 Plug Back Performed
2009-07-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-01-15 Perforation 2463.40 2465.20 7
1975-06-25 Fracture 2422.90 2432.60 0
1988-03-03 Perforation 2463.40 2465.20 13
1988-03-09 Fracture 2463.40 2465.20 0
1988-03-20 Perforation 2437.00 2437.50 7
2001-02-13 Perforation 1960.50 1963.50 17
2001-02-14 Acid Treatment 1960.50 1963.50 0
2001-02-16 Fracture 1960.50 1963.50 0
2006-07-26 Cement Squeeze 1960.50 1963.50 0
2009-06-27 Perforation 2428.80 2430.50 13
2009-06-27 Cement Squeeze 2430.80 2432.60 0
1975-01-16 Acid Treatment 2463.40 2465.20 0
2009-06-27 Remedial Casing Cementing 2428.80 2430.50 0
2009-06-27 Cement Squeeze 2426.20 2427.70 0
2009-06-27 Cement Squeeze 2422.90 2425.00 0
2009-06-27 Cement Plug 2375.00 2432.50 0
2009-06-27 Perforation 1308.20 1309.20 13
2009-06-29 Remedial Casing Cementing 1308.20 1309.20 0
2009-06-29 Cement Plug 1266.80 1327.10 0
2009-06-29 Perforation 729.40 730.40 13
2009-06-29 Perforation 603.50 604.50 13
2009-06-29 Perforation 537.00 538.00 13
1975-01-20 Fracture 2463.40 2465.20 0
2009-06-29 Perforation 484.00 485.00 13
2009-06-29 Perforation 398.00 399.00 13
2009-06-30 Remedial Casing Cementing 729.40 730.40 0
2009-06-30 Remedial Casing Cementing 603.50 604.50 0
2009-06-30 Remedial Casing Cementing 537.00 538.00 0
2009-06-30 Remedial Casing Cementing 484.00 485.00 0
2009-06-30 Remedial Casing Cementing 398.00 399.00 0
2009-07-02 Cement Plug 196.00 753.00 0
1975-06-16 Packing Device Capped w/Cement 2427.70 2450.60 0
1975-06-22 Perforation 2429.00 2430.20 7
1975-06-22 Perforation 2430.80 2432.60 7
1975-06-23 Perforation 2422.90 2425.00 7
1975-06-23 Perforation 2426.20 2427.70 7
1975-06-24 Acid Treatment 2422.90 2432.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 1412 0.0 0.0 0.0
1988 900 0.0 0.0 0.0
1989 7798 0.0 0.0 0.0
1990 8616 0.0 0.0 0.0
1991 4776 0.0 0.0 0.0
1993 336 0.0 0.0 0.0

For data sources see[5]

References