X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0345030407000

Well Details

Well ID: 0345030407000
Loading map...
Location: 00/07-04-034-03W5/0
Location Alias: 00/07-04-34-03 W5M
Location Alias 2: 00/07-04-034-03 W5/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 5
Range: 03
Section: 04
County/Municipality: Mountain View County
Well Name: RIGEL GARRINGTON 7-4-34-3
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0053791
License Date: 1975-06-09
License Status: Re-Entered
Spud Date: 1975-06-23
Final Drill Date: 1975-07-10
Well Total Depth: 2418.60 m
Surface Hole Latitude: 51.886953
Surface Hole Longitude: -114.364012

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-06-09 Obtained License
1975-07-10 Finished Drilling
1975-07-11 Production Casing Operation Performed
1975-08-03 Perforation Treatment Performed - Jet Perforation
1975-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-08-05 Perforation Treatment Performed - Fractured
1975-08-06 Well Mode changed to Drilled and Cased
1975-10-01 Well Began Production
1975-10-01 Well Fluid changed to Crude Oil
1975-10-01 Well Mode changed to Flowing
1989-06-21 Perforation Treatment Performed - Jet Perforation
1989-06-21 Well Fluid changed to Crude Oil
1989-06-21 Well Log Performed
1989-06-21 Well Mode changed to Flowing
1989-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-13 Well Log Performed
1996-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-14 Perforation Treatment Performed - Jet Perforation
1996-08-14 Plug Back Performed
1996-08-14 Well Fluid changed to Crude Oil
1996-08-14 Well Mode changed to Abandoned Zone
1996-08-15 Perforation Treatment Performed - Remedial Casing
1996-09-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-08-03 Perforation 2400.60 2402.40 13
1996-08-15 Remedial Casing Cementing 479.00 480.00 0
1975-08-04 Acid Treatment 2400.60 2402.40 0
1975-08-05 Fracture 2400.60 2402.40 0
1989-06-21 Perforation 2065.00 2070.80 13
1989-06-21 Perforation 2100.00 2104.60 13
1989-06-24 Acid Treatment 2065.00 2104.60 0
1996-08-14 Packing Device Capped w/Cement 2368.00 2368.00 0
1996-08-14 Packing Device Capped w/Cement 2052.00 2060.00 0
1996-08-14 Perforation 479.00 480.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 1976 0.0 0.0 0.0
1976 7765 0.0 0.0 0.0
1977 7935 0.0 0.0 0.0
1978 8651 0.0 0.0 0.0
1979 8486 0.0 0.0 0.0
1980 8077 0.0 0.0 0.0
1981 8677 0.0 0.0 0.0
1982 8239 0.0 0.0 0.0
1983 7628 0.0 0.0 0.0
1984 7089 0.0 0.0 0.0
1985 5647 0.0 0.0 0.0
1986 5068 0.0 0.0 0.0
1987 3741 0.0 0.0 0.0
1988 8342 0.0 0.0 0.0
1989 3761 0.0 0.0 0.0

For data sources see[5]

References