X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0345013311000

Well Details

Well ID: 0345013311000
Loading map...
Location: 00/11-33-034-01W5/0
Location Alias: 00/11-33-34-01 W5M
Location Alias 2: 00/11-33-034-01 W5/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 5
Range: 01
Section: 33
County/Municipality: Red Deer County
Well Name: GNEL INNIS 11-33-34-1
Operator Name: Obsidian Energy Ltd.
License Number: 0015013
License Date: 1958-03-21
License Status: RecCertified
Spud Date: 1958-03-29
Final Drill Date: 1958-05-07
Well Total Depth: 2654.80 m
Surface Hole Latitude: 51.964259
Surface Hole Longitude: -114.087251

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-03-21 Obtained License
1958-04-05 Lost Circulation Occurred
1958-04-10 Lost Circulation Occurred
1958-05-01 Production Casing Operation Performed
1958-05-07 Finished Drilling
1958-05-07 Perforation Treatment Performed - Open-Hole Completion
1958-05-07 Well Mode changed to Drilled and Cased
1958-05-25 Well Began Production
1958-05-25 Well Fluid changed to Crude Oil
1958-05-25 Well Mode changed to Flowing
1985-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-17 Well Fluid changed to Crude Oil
1985-12-17 Well Mode changed to Pumping
1988-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-11-16 Plug Back Performed
1988-11-16 Well Abandoned
1988-11-16 Well Fluid changed to Crude Oil
1988-11-16 Well Mode changed to Abandoned
2007-04-10 Well Log Performed
2007-05-08 Well Log Performed
2007-05-09 Well Log Performed
2007-05-16 Perforation Treatment Performed - Cement Plug
2007-05-16 Well Log Performed
2007-05-17 Perforation Treatment Performed - Jet Perforation
2007-05-17 Well Log Performed
2007-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-05-22 Perforation Treatment Performed - Jet Perforation
2007-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-05-23 Perforation Treatment Performed - Cement Squeeze
2007-05-29 Perforation Treatment Performed - Jet Perforation
2007-05-29 Well Log Performed
2007-05-30 Perforation Treatment Performed - Cement Squeeze
2007-05-31 Perforation Treatment Performed - Jet Perforation
2007-05-31 Well Log Performed
2007-06-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-06-01 Perforation Treatment Performed - Cement Squeeze
2007-06-02 Perforation Treatment Performed - Jet Perforation
2007-06-03 Perforation Treatment Performed - Cement Squeeze
2007-06-04 Perforation Treatment Performed - Jet Perforation
2007-06-05 Perforation Treatment Performed - Cement Squeeze
2007-06-06 Perforation Treatment Performed - Jet Perforation
2007-06-06 Well Log Performed
2007-06-08 Perforation Treatment Performed - Cement Squeeze
2007-06-09 Perforation Treatment Performed - Jet Perforation
2007-06-09 Well Log Performed
2007-06-10 Perforation Treatment Performed - Cement Squeeze
2007-06-11 Perforation Treatment Performed - Jet Perforation
2007-06-12 Perforation Treatment Performed - Cement Squeeze
2007-06-14 Perforation Treatment Performed - Cement Squeeze
2007-06-14 Perforation Treatment Performed - Jet Perforation
2007-06-14 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-05-07 Open Hole/Barefoot Completion 2648.70 2654.80 0
2007-05-29 Perforation 2217.00 2218.00 13
2007-05-30 Cement Squeeze 2217.00 2218.00 0
2007-05-31 Perforation 1917.00 1918.00 13
2007-06-01 Cement Squeeze 1917.00 1918.00 0
2007-06-01 Packing Device Capped w/Cement 1685.00 1785.00 0
2007-06-02 Perforation 1664.00 1665.00 13
2007-06-03 Cement Squeeze 1664.00 1665.00 0
2007-06-04 Perforation 1459.00 1460.00 13
2007-06-05 Cement Squeeze 1459.00 1460.00 0
2007-06-06 Perforation 1324.00 1325.00 13
1985-12-16 Acid Treatment 2648.70 2654.80 0
2007-06-08 Cement Squeeze 1324.00 1325.00 0
2007-06-09 Perforation 1013.00 1014.00 13
2007-06-10 Cement Squeeze 1013.00 1014.00 0
2007-06-11 Perforation 415.00 416.00 13
2007-06-12 Cement Squeeze 415.00 416.00 0
2007-06-14 Perforation 275.00 276.00 13
2007-06-14 Cement Squeeze 275.00 276.00 0
1988-11-16 Packing Device Capped w/Cement 2607.20 2617.00 0
2007-05-16 Cement Plug 2550.00 2607.20 0
2007-05-17 Perforation 2405.00 2406.00 13
2007-05-18 Acid Treatment 2405.00 2406.00 0
2007-05-22 Perforation 2284.00 2285.00 13
2007-05-23 Acid Treatment 2284.00 2285.00 0
2007-05-23 Cement Squeeze 2284.00 2285.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1985 302 0.0 0.0 0.0
1986 48 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1958-04-05 Lost Circulation 1365.80 1365.80
1958-04-10 Lost Circulation 2019.60 2019.60

For data sources see[6]

References