0344273110000

Well Details

Well ID: 0344273110000
Loading map...
Location: 00/10-31-034-27W4/0
Location Alias: 00/10-31-34-27 W4M
Location Alias 2: 00/10-31-034-27 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 27
Section: 31
County/Municipality: Red Deer County
Well Name: CALCO ET AL DAVEY 10-31-34-27
Operator Name: Calco Resources Ltd.
License Number: 0090091
License Date: 1981-05-11
License Status: RecCertified
Spud Date: 1981-05-16
Final Drill Date: 1981-06-05
Well Total Depth: 2030.00 m
Surface Hole Latitude: 51.964099
Surface Hole Longitude: -113.815360

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-05-11 Obtained License
1981-05-16 Lost Circulation Occurred
1981-05-26 Drill Stem Test Performed
1981-05-27 Drill Stem Test Performed
1981-06-05 Finished Drilling
1981-06-05 Well Mode changed to Drilled and Cased
1981-06-09 Drill Stem Test Performed
1981-06-10 Drill Stem Test Performed
1981-06-11 Drill Stem Test Performed
1981-06-12 Production Casing Operation Performed
1981-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-07-08 Perforation Treatment Performed - Jet Perforation
1981-07-09 Well Began Production
1981-07-09 Well Fluid changed to Crude Oil
1981-07-09 Well Mode changed to Flowing
1986-05-16 Well Fluid changed to Crude Oil
1986-05-16 Well Mode changed to Suspended
1986-10-27 Perforation Treatment Performed - Condensate Squeeze
1986-11-09 Well Fluid changed to Crude Oil
1986-11-09 Well Mode changed to Pumping
1988-12-01 Well Fluid changed to Crude Oil
1988-12-01 Well Mode changed to Suspended
2007-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-23 Perforation Treatment Performed - Jet Perforation
2007-11-23 Plug Back Performed
2007-11-23 Well Fluid changed to Crude Oil
2007-11-23 Well Mode changed to Abandoned Zone
2007-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-24 Perforation Treatment Performed - Remedial Casing
2007-11-24 Plug Back Performed
2007-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-25 Perforation Treatment Performed - Jet Perforation
2007-11-25 Perforation Treatment Performed - Remedial Casing
2007-11-25 Plug Back Performed
2007-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-26 Perforation Treatment Performed - Jet Perforation
2007-11-26 Perforation Treatment Performed - Remedial Casing
2007-11-26 Plug Back Performed
2007-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-27 Perforation Treatment Performed - Jet Perforation
2007-11-27 Perforation Treatment Performed - Remedial Casing
2007-11-27 Plug Back Performed
2007-11-28 Perforation Treatment Performed - Cement Plug
2007-11-28 Perforation Treatment Performed - Jet Perforation
2007-11-28 Perforation Treatment Performed - Remedial Casing
2007-11-28 Plug Back Performed
2007-11-29 Well Abandoned
2007-11-29 Well Fluid changed to Crude Oil
2007-11-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-07-08 Perforation 1980.00 1981.00 8
2007-11-25 Perforation 809.60 810.10 17
2007-11-25 Remedial Casing Cementing 809.60 832.10 0
2007-11-25 Packing Device Capped w/Cement 794.10 825.00 0
2007-11-26 Perforation 736.20 736.70 17
2007-11-26 Perforation 620.00 620.50 17
2007-11-26 Remedial Casing Cementing 620.00 736.70 0
2007-11-26 Packing Device Capped w/Cement 604.00 730.00 0
2007-11-27 Perforation 546.70 547.20 17
2007-11-27 Perforation 406.50 407.00 17
2007-11-27 Remedial Casing Cementing 406.50 547.20 0
1981-07-08 Perforation 1984.00 1986.00 8
2007-11-27 Packing Device Capped w/Cement 332.20 540.00 0
2007-11-28 Perforation 331.50 332.00 17
2007-11-28 Remedial Casing Cementing 331.50 332.00 0
2007-11-28 Cement Plug 253.00 332.00 0
1981-07-08 Acid Treatment 1980.00 1986.00 0
1986-10-27 Condensate Squeeze 1980.00 1986.00 0
2007-11-23 Packing Device Capped w/Cement 1970.00 1978.00 0
2007-11-23 Perforation 1132.00 1132.50 17
2007-11-24 Remedial Casing Cementing 1132.00 1132.50 0
2007-11-24 Packing Device Capped w/Cement 1108.70 1129.00 0
2007-11-25 Perforation 831.60 832.10 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 2897 0.0 0.0 0.0
1982 6672 0.0 0.0 0.0
1983 7796 0.0 0.0 0.0
1984 8260 0.0 0.0 0.0
1985 8040 0.0 0.0 0.0
1986 2639 0.0 0.0 0.0
1987 7258 0.0 0.0 0.0
1988 4195 0.0 0.0 0.0
1990 1225 0.0 0.0 0.0
1991 3356 0.0 0.0 0.0
1993 1958 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-05-16 Lost Circulation 191.00 191.00

For data sources see[6]