X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344261506002

Well Details

Well ID: 0344261506002
Loading map...
Location: 00/06-15-034-26W4/2
Location Alias: 00/06-15-34-26 W4M
Location Alias 2: 00/06-15-034-26 W4/02
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 26
Section: 15
County/Municipality: Kneehill County
Well Name: VAULT WIM 6-15-34-26
Operator Name: Obsidian Energy Ltd.
License Number: 0013242
License Date: 1957-03-26
License Status: RecExempt
Spud Date: 1957-05-17
Final Drill Date: 1957-07-01
Well Total Depth: 2302.20 m
Surface Hole Latitude: 51.916450
Surface Hole Longitude: -113.610046

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-03-26 Obtained License
1957-06-16 Drill Stem Test Performed
1957-06-18 Drill Stem Test Performed
1957-06-20 Drill Stem Test Performed
1957-06-21 Drill Stem Test Performed
1957-06-24 Drill Stem Test Performed
1957-06-25 Drill Stem Test Performed
1957-06-26 Drill Stem Test Performed
1957-06-27 Drill Stem Test Performed
1957-06-28 Drill Stem Test Performed
1957-06-29 Drill Stem Test Performed
1957-06-30 Drill Stem Test Performed
1957-07-01 Finished Drilling
1957-07-01 Well Mode changed to Drilled and Cased
1957-07-04 Production Casing Operation Performed
1957-07-06 Perforation Treatment Performed - Bullet Perforation
1957-07-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-11 Perforation Treatment Performed - Jet Perforation
1974-05-23 Perforation Treatment Performed - Jet Perforation
1974-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-07-20 Perforation Treatment Performed - Cement Squeeze
1974-10-16 Perforation Treatment Performed - Jet Perforation
1974-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-12-04 Perforation Treatment Performed - Cement Squeeze
1975-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-12-05 Perforation Treatment Performed - Jet Perforation
1984-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-10-01 Plug Back Performed
1991-12-07 Perforation Treatment Performed - Jet Perforation
1991-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-12-20 Well Began Production
1991-12-20 Well Fluid changed to Crude Oil
1991-12-20 Well Mode changed to Pumping
1992-04-14 Well Log Performed
1992-04-21 Perforation Treatment Performed - Cement Squeeze
1992-04-21 Well Fluid changed to Crude Oil
1992-04-21 Well Mode changed to Abandoned Zone
1992-04-24 Perforation Treatment Performed - Jet Perforation
1992-04-24 Well Log Performed
1992-04-30 Perforation Treatment Performed - Jet Perforation
1992-04-30 Well Log Performed
1992-05-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-07-31 Plug Back Performed
1993-08-31 Well Log Performed
1993-09-01 Well Log Performed
1993-09-02 Perforation Treatment Performed - Jet Perforation
1993-09-02 Well Log Performed
1993-09-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-09-03 Well Log Performed
1993-09-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-09-04 Perforation Treatment Performed - Jet Perforation
1993-09-04 Plug Back Performed
2001-08-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-13 Perforation Treatment Performed - Jet Perforation
2001-08-13 Plug Back Performed
2001-08-13 Well Log Performed
2001-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-14 Perforation Treatment Performed - Remedial Casing
2001-08-15 Perforation Treatment Performed - Cement Plug
2001-08-15 Perforation Treatment Performed - Jet Perforation
2001-08-15 Perforation Treatment Performed - Remedial Casing
2001-08-17 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-07-06 Bullet Perforation 2278.10 2279.00 13
1975-12-04 Cement Squeeze 2268.00 2270.80 0
1975-12-05 Perforation 2262.80 2264.40 7
1975-12-05 Acid Treatment 2262.80 2264.40 0
1984-07-31 Acid Treatment 2262.80 2264.40 0
1984-08-30 Acid Treatment 2262.80 2264.40 0
1990-10-01 Packing Device Capped w/Cement 2247.00 2258.00 0
1991-12-07 Perforation 1833.60 1838.50 13
1991-12-10 Acid Treatment 1833.60 1838.50 0
1992-04-21 Cement Squeeze 1833.60 1838.50 0
1992-04-24 Perforation 2224.50 2227.50 18
1957-07-15 Acid Treatment 2278.10 2279.00 0
1992-04-30 Perforation 2221.30 2224.30 13
1992-05-04 Acid Treatment 2221.30 2227.50 0
1992-05-07 Acid Treatment 2221.30 2227.50 0
1993-07-27 Acid Treatment 2221.30 2227.50 0
1993-07-29 Acid Treatment 2221.30 2227.50 0
1993-07-31 Packing Device Capped w/Cement 2202.00 2210.00 0
1993-09-02 Perforation 1599.00 1601.00 13
1993-09-03 Packing Device Capped w/Cement 1817.00 1825.00 0
1993-09-04 Packing Device Capped w/Cement 1576.50 1584.50 0
1993-09-04 Perforation 1039.40 1042.40 13
1973-06-11 Perforation 2275.00 2275.90 7
2001-08-13 Packing Device Capped w/Cement 1022.00 1030.00 0
2001-08-13 Perforation 691.00 692.00 13
2001-08-14 Remedial Casing Cementing 691.00 692.00 0
2001-08-14 Packing Device Capped w/Cement 638.50 680.00 0
2001-08-15 Perforation 221.00 222.00 13
2001-08-15 Remedial Casing Cementing 221.00 222.00 0
2001-08-15 Cement Plug 178.00 222.00 0
1974-05-23 Perforation 2269.50 2270.80 7
1974-05-27 Acid Treatment 2269.50 2270.80 0
1974-07-20 Cement Squeeze 2275.00 2275.90 0
1974-07-20 Cement Squeeze 2269.50 2279.00 0
1974-10-16 Perforation 2268.00 2269.50 7
1974-10-18 Acid Treatment 2268.00 2269.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 295 0.0 0.0 0.0
1992 660 0.0 0.0 0.0

For data sources see[5]

References