X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344181808002

Well Details

Well ID: 0344181808002
Loading map...
Location: 00/08-18-034-18W4/2
Location Alias: 00/08-18-34-18 W4M
Location Alias 2: 00/08-18-034-18 W4/02
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 18
Section: 18
County/Municipality: County of Stettler No. 6
Well Name: RANGER ET AL CHAIN LAKE 8-18-34-18
Operator Name: Postell Energy Co. Ltd.
License Number: 0102667
License Date: 1983-08-10
License Status: RecCertified
Spud Date: 1983-08-13
Final Drill Date: 1983-08-26
Well Total Depth: 1813.00 m
Surface Hole Latitude: 51.917830
Surface Hole Longitude: -112.537284

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-08-10 Obtained License
1983-08-19 Drill Stem Test Performed
1983-08-26 Finished Drilling
1983-08-26 Well Mode changed to Drilled and Cased
1983-08-27 Well Log Performed
1983-08-29 Production Casing Operation Performed
1983-10-15 Perforation Treatment Performed - Jet Perforation
1983-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-25 Perforation Treatment Performed - Jet Perforation
1983-10-25 Well Began Production
1983-10-25 Well Fluid changed to Crude Oil
1983-10-25 Well Mode changed to Pumping
1984-03-30 Well Fluid changed to Crude Oil
1984-03-30 Well Mode changed to Suspended
1985-06-01 Well Fluid changed to Crude Oil
1985-06-01 Well Mode changed to Pumping
1985-06-30 Well Fluid changed to Crude Oil
1985-06-30 Well Mode changed to Suspended
1988-09-01 Well Fluid changed to Crude Oil
1988-09-01 Well Mode changed to Pumping
1988-10-13 Perforation Treatment Performed - Cement Squeeze
1988-10-13 Well Log Performed
1988-10-16 Perforation Treatment Performed - Abrasa-Jet Perforation
1988-10-16 Well Log Performed
1988-12-08 Well Fluid changed to Crude Oil
1988-12-08 Well Mode changed to Suspended
1990-11-08 Perforation Treatment Performed - Fractured
1996-08-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-29 Plug Back Performed
1996-08-29 Well Log Performed
1996-10-05 Well Abandoned
1996-10-05 Well Fluid changed to Crude Oil
1996-10-05 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-10-15 Perforation 1141.00 1144.00 13
1983-10-16 Acid Treatment 1141.00 1144.00 0
1983-10-25 Perforation 1133.00 1135.00 0
1988-10-13 Cement Squeeze 1133.00 1144.00 0
1988-10-16 Hydra Jet Perforation 1132.50 1134.50 0
1990-11-08 Fracture 1132.50 1134.50 0
1996-08-29 Packing Device Capped w/Cement 1110.00 1118.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 533 0.0 0.0 0.0
1984 1076 0.0 0.0 0.0
1985 360 0.0 0.0 0.0
1988 1122 0.0 0.0 0.0
1990 79 0.0 0.0 0.0
1991 675 0.0 0.0 0.0

For data sources see[5]

References