If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344181714000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.922171,"lon":-112.524199,"icon":""}]} |
Location: 00/14-17-034-18W4/0 | |
Location Alias: 00/14-17-34-18 W4M | |
Location Alias 2: 00/14-17-034-18 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 18 | |
Section: 17 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: EMBER CHAIN 14-17-34-18 | |
Operator Name: Ember Resources Inc. | |
License Number: 0361207 | |
License Date: 2006-08-04 | |
License Status: Issued | |
Spud Date: 2006-08-08 | |
Final Drill Date: 2006-08-09 | |
Well Total Depth: 644.00 m | |
Surface Hole Latitude: 51.922171 | |
Surface Hole Longitude: -112.524199 |
Date | Event |
---|---|
2006-08-04 | Obtained License |
2006-08-09 | Finished Drilling |
2006-08-09 | Surface Casing Operation Performed |
2006-08-09 | Well Mode changed to Drilled and Cased |
2006-08-10 | Production Casing Operation Performed |
2006-08-10 | Rig Released |
2006-08-15 | Well Log Performed |
2006-08-31 | Perforation Treatment Performed - Jet Perforation |
2006-08-31 | Well Log Performed |
2006-09-02 | Perforation Treatment Performed - Fractured |
2006-09-07 | Perforation Treatment Performed - Jet Perforation |
2006-09-07 | Well Log Performed |
2006-09-10 | Perforation Treatment Performed - Fractured |
2006-09-20 | Perforation Treatment Performed - Jet Perforation |
2006-09-20 | Well Log Performed |
2006-10-03 | Perforation Treatment Performed - Cement Squeeze |
2006-10-03 | Plug Back Performed |
2006-10-22 | Well Log Performed |
2006-10-23 | Perforation Treatment Performed - Jet Perforation |
2006-10-23 | Well Log Performed |
2006-10-28 | Perforation Treatment Performed - Fractured |
2007-03-20 | Well Began Production |
2007-03-20 | Well Fluid changed to Gas |
2007-03-20 | Well Mode changed to Flowing |
2010-04-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-04-06 | Plug Back Performed |
2010-04-06 | Well Fluid changed to Gas |
2010-04-06 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-08-31 | Perforation | 587.00 | 590.00 | 17 |
2006-10-23 | Perforation | 208.20 | 210.20 | 13 |
2006-10-23 | Perforation | 161.00 | 162.00 | 13 |
2006-10-23 | Perforation | 149.00 | 159.00 | 13 |
2006-10-23 | Perforation | 144.50 | 145.50 | 13 |
2006-10-23 | Perforation | 141.30 | 142.30 | 13 |
2006-10-23 | Perforation | 137.70 | 138.70 | 13 |
2006-10-28 | Fracture | 314.20 | 315.20 | 0 |
2006-10-28 | Fracture | 269.70 | 270.70 | 0 |
2006-10-28 | Fracture | 263.20 | 264.20 | 0 |
2006-10-28 | Fracture | 208.20 | 210.20 | 0 |
2006-09-02 | Fracture | 587.00 | 590.00 | 0 |
2006-10-28 | Fracture | 161.00 | 162.00 | 0 |
2006-10-28 | Fracture | 149.00 | 159.00 | 0 |
2006-10-28 | Fracture | 144.50 | 145.50 | 0 |
2006-10-28 | Fracture | 141.30 | 142.30 | 0 |
2006-10-28 | Fracture | 137.70 | 138.70 | 0 |
2010-04-06 | Packing Device Capped w/Cement | 507.00 | 515.00 | 0 |
2006-09-07 | Perforation | 521.00 | 525.00 | 17 |
2006-09-10 | Fracture | 521.00 | 525.00 | 0 |
2006-09-20 | Perforation | 390.50 | 395.00 | 17 |
2006-10-03 | Cement Squeeze | 390.50 | 395.00 | 0 |
2006-10-23 | Perforation | 314.20 | 315.20 | 13 |
2006-10-23 | Perforation | 269.70 | 270.70 | 13 |
2006-10-23 | Perforation | 263.20 | 264.20 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 208 | 0.0 | 0.0 | 0.0 |
For data sources see[5]