If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344180603000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.885097,"lon":-112.548321,"icon":""}]} |
Location: 00/03-06-034-18W4/0 | |
Location Alias: 00/03-06-34-18 W4M | |
Location Alias 2: 00/03-06-034-18 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 18 | |
Section: 06 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: EMBER CHAIN 3-6-34-18 | |
Operator Name: Ember Resources Inc. | |
License Number: 0359818 | |
License Date: 2006-07-05 | |
License Status: Issued | |
Spud Date: 2006-07-21 | |
Final Drill Date: 2006-07-22 | |
Well Total Depth: 681.00 m | |
Surface Hole Latitude: 51.885097 | |
Surface Hole Longitude: -112.548321 |
Date | Event |
---|---|
2006-07-05 | Obtained License |
2006-07-21 | Surface Casing Operation Performed |
2006-07-22 | Finished Drilling |
2006-07-22 | Production Casing Operation Performed |
2006-07-22 | Rig Released |
2006-07-22 | Well Mode changed to Drilled and Cased |
2006-07-26 | Well Log Performed |
2006-09-12 | Perforation Treatment Performed - Jet Perforation |
2006-09-12 | Well Log Performed |
2006-09-29 | Perforation Treatment Performed - Fractured |
2006-10-14 | Well Began Production |
2006-10-14 | Well Fluid changed to Coalbed Methane-Coals and Other |
2006-10-14 | Well Mode changed to Flowing |
2007-02-02 | Well Log Performed |
2007-02-08 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-09-12 | Perforation | 623.50 | 624.50 | 13 |
2006-09-12 | Perforation | 207.80 | 208.80 | 13 |
2006-09-12 | Perforation | 204.00 | 205.50 | 13 |
2006-09-12 | Perforation | 202.00 | 203.00 | 13 |
2006-09-12 | Perforation | 187.60 | 188.60 | 13 |
2006-09-12 | Perforation | 184.00 | 185.00 | 13 |
2006-09-12 | Perforation | 179.60 | 180.60 | 13 |
2006-09-12 | Perforation | 172.90 | 173.90 | 13 |
2006-09-12 | Perforation | 162.30 | 163.30 | 13 |
2006-09-12 | Perforation | 152.70 | 153.70 | 13 |
2006-09-12 | Perforation | 144.00 | 145.00 | 13 |
2006-09-12 | Perforation | 618.80 | 619.80 | 13 |
2006-09-12 | Perforation | 142.50 | 143.50 | 13 |
2006-09-12 | Perforation | 138.40 | 139.40 | 13 |
2006-09-29 | Fracture | 623.50 | 624.50 | 0 |
2006-09-29 | Fracture | 618.80 | 619.80 | 0 |
2006-09-29 | Fracture | 611.30 | 612.30 | 0 |
2006-09-29 | Fracture | 609.10 | 610.10 | 0 |
2006-09-29 | Fracture | 607.80 | 608.80 | 0 |
2006-09-29 | Fracture | 604.00 | 605.00 | 0 |
2006-09-29 | Fracture | 356.30 | 357.30 | 0 |
2006-09-29 | Fracture | 321.80 | 322.80 | 0 |
2006-09-12 | Perforation | 611.30 | 612.30 | 13 |
2006-09-29 | Fracture | 301.40 | 302.40 | 0 |
2006-09-29 | Fracture | 207.80 | 208.80 | 0 |
2006-09-29 | Fracture | 204.00 | 205.00 | 0 |
2006-09-29 | Fracture | 202.00 | 203.00 | 0 |
2006-09-29 | Fracture | 187.60 | 188.60 | 0 |
2006-09-29 | Fracture | 184.00 | 185.00 | 0 |
2006-09-29 | Fracture | 179.60 | 180.60 | 0 |
2006-09-29 | Fracture | 172.90 | 173.90 | 0 |
2006-09-29 | Fracture | 162.30 | 163.30 | 0 |
2006-09-29 | Fracture | 152.70 | 153.70 | 0 |
2006-09-12 | Perforation | 609.10 | 610.10 | 13 |
2006-09-29 | Fracture | 144.00 | 145.00 | 0 |
2006-09-29 | Fracture | 142.50 | 143.50 | 0 |
2006-09-29 | Fracture | 138.40 | 139.40 | 0 |
2006-09-12 | Perforation | 607.80 | 608.80 | 13 |
2006-09-12 | Perforation | 604.00 | 605.00 | 13 |
2006-09-12 | Perforation | 356.30 | 357.30 | 13 |
2006-09-12 | Perforation | 321.80 | 322.80 | 13 |
2006-09-12 | Perforation | 301.40 | 302.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 1848 | 0.0 | 0.0 | 0.0 |
2007 | 8721 | 0.0 | 0.0 | 0.0 |
2008 | 8707 | 0.0 | 0.0 | 0.0 |
2009 | 8744 | 0.0 | 0.0 | 0.0 |
2010 | 8626 | 0.0 | 0.0 | 0.0 |
2011 | 8745 | 0.0 | 0.0 | 0.0 |
2012 | 8514 | 0.0 | 0.0 | 0.0 |
2013 | 8717 | 0.0 | 0.0 | 0.0 |
2014 | 8648 | 0.0 | 0.0 | 0.0 |
2015 | 8558 | 0.0 | 0.0 | 0.0 |
2016 | 8561 | 0.0 | 0.0 | 0.0 |
2017 | 8637 | 0.0 | 0.0 | 0.0 |
2018 | 8702 | 0.0 | 0.0 | 0.0 |
2019 | 8339 | 0.0 | 0.0 | 0.0 |
2020 | 2169 | 0.0 | 0.0 | 0.0 |
For data sources see[5]