X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344093610000

Well Details

Well ID: 0344093610000
Loading map...
Location: 00/10-36-034-09W4/0
Location Alias: 00/10-36-34-09 W4M
Location Alias 2: 00/10-36-034-09 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 09
Section: 36
County/Municipality: Special Areas No. 4
Well Name: SPUR PROVOST 10-36-34-9
Operator Name: Tamarack Acquisition Corp.
License Number: 0038405
License Date: 1970-07-14
License Status: Suspension
Spud Date: 1970-07-25
Final Drill Date: 1970-07-27
Well Total Depth: 915.30 m
Surface Hole Latitude: 51.964045
Surface Hole Longitude: -111.146756

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-07-14 Obtained License
1970-07-25 Surface Casing Operation Performed
1970-07-27 Finished Drilling
1970-07-27 Production Casing Operation Performed
1970-07-27 Well Mode changed to Drilled and Cased
1970-09-30 Perforation Treatment Performed - Jet Perforation
1970-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-10-17 Perforation Treatment Performed - Fractured
1971-06-04 Well Began Production
1971-06-04 Well Fluid changed to Crude Oil
1971-06-04 Well Mode changed to Pumping
1973-03-01 Well Fluid changed to Crude Oil
1973-03-01 Well Mode changed to Suspended
1974-05-09 Well Fluid changed to Crude Oil
1974-05-09 Well Mode changed to Pumping
2019-09-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-07 Plug Back Performed
2019-09-07 Well Fluid changed to Crude Oil
2019-09-07 Well Mode changed to Abandoned Zone
2019-09-08 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-09-30 Perforation 898.20 900.10 7
2019-09-08 Perforation 375.00 379.00 20
2019-09-08 Perforation 369.00 373.50 20
2019-09-08 Perforation 366.00 369.00 20
1970-10-17 Acid Treatment 898.20 900.10 0
1970-10-17 Fracture 898.20 900.10 0
2019-09-07 Packing Device Capped w/Cement 875.00 883.00 0
2019-09-08 Perforation 401.00 405.00 20
2019-09-08 Perforation 395.00 400.00 20
2019-09-08 Perforation 387.50 390.50 20
2019-09-08 Perforation 383.00 387.00 20
2019-09-08 Perforation 379.00 383.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 4939 0.0 0.0 0.0
1972 3144 0.0 0.0 0.0
1974 5591 0.0 0.0 0.0
1975 8541 0.0 0.0 0.0
1976 8611 0.0 0.0 0.0
1977 8545 0.0 0.0 0.0
1978 8453 0.0 0.0 0.0
1979 8715 0.0 0.0 0.0
1980 8707 0.0 0.0 0.0
1981 8631 0.0 0.0 0.0
1982 8540 0.0 0.0 0.0
1983 8483 0.0 0.0 0.0
1984 8650 0.0 0.0 0.0
1985 8339 0.0 0.0 0.0
1986 8565 0.0 0.0 0.0
1987 8482 0.0 0.0 0.0
1988 8623 0.0 0.0 0.0
1989 8591 0.0 0.0 0.0
1990 8602 0.0 0.0 0.0
1991 8730 0.0 0.0 0.0
1992 8683 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8535 0.0 0.0 0.0
1996 7435 0.0 0.0 0.0
1997 8150 0.0 0.0 0.0
1998 8463 0.0 0.0 0.0
1999 8711 0.0 0.0 0.0
2000 8455 0.0 0.0 0.0
2001 8737 0.0 0.0 0.0
2002 8701 0.0 0.0 0.0
2003 8674 0.0 0.0 0.0
2004 8673 0.0 0.0 0.0
2005 8540 0.0 0.0 0.0
2006 8755 0.0 0.0 0.0
2007 8643 0.0 0.0 0.0
2008 8375 0.0 0.0 0.0
2009 8437 0.0 0.0 0.0
2010 8025 0.0 0.0 0.0
2011 7514 0.0 0.0 0.0
2012 8040 0.0 0.0 0.0
2013 8098 0.0 0.0 0.0
2014 7768 0.0 0.0 0.0
2015 8662 0.0 0.0 0.0
2016 8701 0.0 0.0 0.0
2017 4761 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-09-18 No Incident Encountered 0.00 0.00

For data sources see[6]

References