X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344093310030

Well Details

Well ID: 0344093310030
Loading map...
Location: 03/10-33-034-09W4/0
Location Alias: 03/10-33-34-09 W4M
Location Alias 2: 03/10-33-034-09 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 09
Section: 33
County/Municipality: Special Areas No. 4
Well Name: TAC 13-27 HZ 103 PROVOST 10-33-34-9
Operator Name: Tamarack Acquisition Corp.
License Number: 0496710
License Date: 2019-11-28
License Status: Issued
Spud Date: 2019-12-09
Final Drill Date: 2020-01-11
Well Total Depth: 2259.00 m
Surface Hole Latitude: 51.954008
Surface Hole Longitude: -111.207714

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-12-09 Hertz & Paluck Energy Services Inc. 1 Set Surface
2020-01-09 Tempco Drilling Company Inc. 8 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-01-10 614.80 Deviate (5 - 79 degrees)
2020-01-10 1062.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-02-02 Perforation 2242.00 2242.50 20
2020-02-02 Perforation 1880.00 1880.50 20
2020-02-02 Perforation 1845.00 1845.50 20
2020-02-02 Perforation 1801.50 1802.00 20
2020-02-02 Perforation 1765.00 1765.50 20
2020-02-02 Perforation 1729.00 1729.50 20
2020-02-02 Perforation 1693.00 1693.50 20
2020-02-02 Perforation 1657.00 1657.50 20
2020-02-02 Perforation 1622.00 1622.50 20
2020-02-02 Perforation 1587.00 1587.50 20
2020-02-02 Perforation 1553.00 1553.50 20
2020-02-02 Perforation 2206.00 2206.50 20
2020-02-02 Perforation 1506.00 1506.50 20
2020-02-02 Perforation 1310.00 1310.50 20
2020-02-02 Perforation 1275.00 1275.50 20
2020-02-02 Perforation 1240.00 1240.50 20
2020-02-02 Perforation 1204.00 1204.50 20
2020-02-09 Fracture 2242.00 2242.50 0
2020-02-09 Fracture 2206.00 2206.50 0
2020-02-09 Fracture 2170.50 2171.00 0
2020-02-09 Fracture 2135.50 2136.00 0
2020-02-09 Fracture 2092.00 2092.50 0
2020-02-02 Perforation 2170.50 2171.00 20
2020-02-09 Fracture 2043.00 2043.50 0
2020-02-09 Fracture 1987.00 1987.50 0
2020-02-09 Fracture 1952.00 1952.50 0
2020-02-09 Fracture 1916.00 1916.50 0
2020-02-09 Fracture 1880.00 1880.50 0
2020-02-09 Fracture 1845.00 1845.50 0
2020-02-09 Fracture 1801.50 1802.00 0
2020-02-09 Fracture 1765.00 1765.50 0
2020-02-09 Fracture 1729.00 1729.50 0
2020-02-09 Fracture 1693.00 1693.50 0
2020-02-02 Perforation 2135.50 2136.00 20
2020-02-09 Fracture 1657.00 1657.50 0
2020-02-09 Fracture 1622.00 1622.50 0
2020-02-09 Fracture 1587.00 1587.50 0
2020-02-09 Fracture 1553.00 1553.50 0
2020-02-09 Fracture 1506.00 1506.50 0
2020-02-09 Fracture 1310.00 1310.50 0
2020-02-09 Fracture 1275.00 1275.50 0
2020-02-09 Fracture 1240.00 1240.50 0
2020-02-09 Fracture 1204.00 1204.50 0
2020-02-02 Perforation 2092.00 2092.50 20
2020-02-02 Perforation 2043.00 2043.50 20
2020-02-02 Perforation 1987.00 1987.50 20
2020-02-02 Perforation 1952.00 1952.50 20
2020-02-02 Perforation 1916.00 1916.50 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 886 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-12 No Incident Encountered 0.00 0.00
2020-02-09 No Incident Encountered 0.00 0.00

For data sources see[7]

References