X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344092906020

Well Details

Well ID: 0344092906020
Loading map...
Location: 02/06-29-034-09W4/0
Location Alias: 02/06-29-34-09 W4M
Location Alias 2: 02/06-29-034-09 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 09
Section: 29
County/Municipality: Special Areas No. 4
Well Name: TAC 16-30 HZ 102 PROVOST 6-29-34-9
Operator Name: Tamarack Acquisition Corp.
License Number: 0494720
License Date: 2019-06-04
License Status: Issued
Spud Date: 2020-01-23
Final Drill Date: 2020-02-05
Well Total Depth: 2010.00 m
Surface Hole Latitude: 51.952551
Surface Hole Longitude: -111.257979

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-02-04 Tempco Drilling Company Inc. 8 Drill To LD
2020-01-23 Hertz & Paluck Energy Services Inc. 1 Set Surface

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-02-04 231.10 Deviate (5 - 79 degrees)
2020-02-04 1036.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-02-16 Perforation 1993.00 1993.50 20
2020-02-16 Perforation 1675.50 1676.00 20
2020-02-16 Perforation 1640.00 1640.50 20
2020-02-16 Perforation 1605.00 1605.50 20
2020-02-16 Perforation 1570.00 1570.50 20
2020-02-16 Perforation 1534.00 1534.50 20
2020-02-16 Perforation 1498.50 1499.00 20
2020-02-16 Perforation 1463.50 1464.00 20
2020-02-16 Perforation 1420.00 1420.50 20
2020-02-16 Perforation 1374.00 1374.50 20
2020-02-16 Perforation 1325.00 1325.50 20
2020-02-16 Perforation 1957.00 1957.50 20
2020-02-16 Perforation 1290.00 1290.50 20
2020-02-16 Perforation 1255.00 1255.50 20
2020-02-16 Perforation 1220.50 1221.00 20
2020-02-16 Perforation 1185.50 1186.00 20
2020-02-16 Perforation 1142.00 1142.50 20
2020-02-16 Perforation 1107.00 1107.50 20
2020-02-22 Fracture 1993.00 1993.50 0
2020-02-23 Fracture 1957.00 1957.50 0
2020-02-23 Fracture 1921.00 1921.50 0
2020-02-23 Fracture 1885.00 1885.50 0
2020-02-16 Perforation 1921.00 1921.50 20
2020-02-23 Fracture 1850.00 1850.50 0
2020-02-23 Fracture 1814.50 1815.00 0
2020-02-23 Fracture 1780.00 1780.50 0
2020-02-23 Fracture 1745.00 1745.50 0
2020-02-23 Fracture 1710.00 1710.50 0
2020-02-23 Fracture 1675.50 1676.00 0
2020-02-23 Fracture 1640.00 1640.50 0
2020-02-23 Fracture 1605.00 1605.50 0
2020-02-23 Fracture 1570.00 1570.50 0
2020-02-23 Fracture 1534.00 1534.50 0
2020-02-16 Perforation 1885.00 1885.50 20
2020-02-23 Fracture 1498.50 1499.00 0
2020-02-23 Fracture 1463.50 1464.00 0
2020-02-23 Fracture 1420.00 1420.50 0
2020-02-23 Fracture 1374.00 1374.50 0
2020-02-23 Fracture 1325.00 1325.50 0
2020-02-23 Fracture 1290.00 1290.50 0
2020-02-23 Fracture 1255.00 1255.50 0
2020-02-23 Fracture 1220.50 1221.00 0
2020-02-23 Fracture 1185.50 1186.00 0
2020-02-23 Fracture 1142.00 1142.50 0
2020-02-16 Perforation 1850.00 1850.50 20
2020-02-23 Fracture 1107.00 1107.50 0
2020-02-16 Perforation 1814.50 1815.00 20
2020-02-16 Perforation 1780.00 1780.50 20
2020-02-16 Perforation 1745.00 1745.50 20
2020-02-16 Perforation 1710.00 1710.50 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 618 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-05 No Incident Encountered 0.00 0.00
2020-02-23 No Incident Encountered 0.00 0.00

For data sources see[7]

References