If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344092902000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.94105,"lon":-111.243944,"icon":""}]} |
Location: 00/02-29-034-09W4/0 | |
Location Alias: 00/02-29-34-09 W4M | |
Location Alias 2: 00/02-29-034-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 09 | |
Section: 29 | |
County/Municipality: Special Areas No. 4 | |
Well Name: MAPCO PROVOST 2-29-34-9 | |
Operator Name: Page Petroleum Ltd | |
License Number: 0042948 | |
License Date: 1972-07-07 | |
License Status: RecCertified | |
Spud Date: 1972-07-09 | |
Final Drill Date: 1972-07-11 | |
Well Total Depth: 923.50 m | |
Surface Hole Latitude: 51.941050 | |
Surface Hole Longitude: -111.243944 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1972-07-07 | Obtained License |
1972-07-11 | Finished Drilling |
1972-07-11 | Production Casing Operation Performed |
1972-07-11 | Well Mode changed to Drilled and Cased |
1972-08-09 | Perforation Treatment Performed - Jet Perforation |
1972-08-11 | Perforation Treatment Performed - Fractured |
1973-10-02 | Well Began Production |
1973-10-02 | Well Fluid changed to Crude Oil |
1973-10-02 | Well Mode changed to Pumping |
1976-03-01 | Drill Stem Test Performed |
1979-01-01 | Well Fluid changed to Crude Oil |
1979-01-01 | Well Mode changed to Suspended |
1981-04-30 | Perforation Treatment Performed - Cement Plug |
1981-04-30 | Well Abandoned |
1981-04-30 | Well Fluid changed to Crude Oil |
1981-04-30 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1972-08-09 | Perforation | 893.10 | 895.20 | 10 |
1972-08-11 | Fracture | 893.10 | 895.20 | 0 |
1981-04-30 | Cement Plug | 774.00 | 923.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1973 | 3982 | 0.0 | 0.0 | 0.0 |
1974 | 3104 | 0.0 | 0.0 | 0.0 |
1975 | 3886 | 0.0 | 0.0 | 0.0 |
1976 | 4234 | 0.0 | 0.0 | 0.0 |
1977 | 2062 | 0.0 | 0.0 | 0.0 |
1978 | 1864 | 0.0 | 0.0 | 0.0 |
For data sources see[5]