X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344091314040

Well Details

Well ID: 0344091314040
Loading map...
Location: 04/14-13-034-09W4/0
Location Alias: 04/14-13-34-09 W4M
Location Alias 2: 04/14-13-034-09 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 09
Section: 13
County/Municipality: Special Areas No. 4
Well Name: TAC 8-23 HZ 104 PROVOST 14-13-34-9
Operator Name: Tamarack Acquisition Corp.
License Number: 0484361
License Date: 2017-07-06
License Status: Issued
Spud Date: 2017-07-11
Final Drill Date: 2017-07-18
Well Total Depth: 2004.00 m
Surface Hole Latitude: 51.930701
Surface Hole Longitude: -111.163426

For data sources see[1][2]

Well History

Date Event
2017-07-06 Obtained License
2017-07-11 Surface Casing Operation Performed
2017-07-17 Direction Drilling Operation Performed - Deviate
2017-07-17 Direction Drilling Operation Performed - Horizontal
2017-07-18 Finished Drilling
2017-07-18 Production Casing Operation Performed
2017-07-18 Rig Released
2017-07-18 Well Log Performed
2017-07-18 Well Mode changed to Drilled and Cased
2017-08-09 Perforation Treatment Performed - Jet Perforation
2017-09-09 Perforation Treatment Performed - Fractured
2017-09-22 Well Began Production
2017-09-22 Well Fluid changed to Crude Oil
2017-09-22 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-07-10 Predator Drilling Inc. 27 N/A Set Surface
2017-07-17 Tempco Drilling Company Inc. 8 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-07-17 205.10 Deviate (5 - 79 degrees)
2017-07-17 1051.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-08-09 Perforation 1980.00 1980.50 20
2017-08-09 Perforation 1672.00 1672.50 20
2017-08-09 Perforation 1639.00 1639.50 20
2017-08-09 Perforation 1610.00 1610.50 20
2017-08-09 Perforation 1558.00 1558.50 20
2017-08-09 Perforation 1536.00 1536.50 20
2017-08-09 Perforation 1499.00 1499.50 20
2017-08-09 Perforation 1465.00 1465.50 20
2017-08-09 Perforation 1412.00 1412.50 20
2017-08-09 Perforation 1358.00 1358.50 20
2017-08-09 Perforation 1325.00 1325.50 20
2017-08-09 Perforation 1954.00 1954.50 20
2017-08-09 Perforation 1289.00 1289.50 20
2017-08-09 Perforation 1255.00 1255.50 20
2017-08-09 Perforation 1214.00 1214.50 20
2017-09-09 Fracture 1980.00 1980.50 0
2017-09-09 Fracture 1885.00 1885.50 0
2017-09-09 Fracture 1851.00 1851.50 0
2017-09-09 Fracture 1814.00 1814.50 0
2017-09-09 Fracture 1780.00 1780.50 0
2017-09-09 Fracture 1742.00 1742.50 0
2017-09-09 Fracture 1709.00 1709.50 0
2017-08-09 Perforation 1921.00 1921.50 20
2017-09-09 Fracture 1672.00 1672.50 0
2017-09-09 Fracture 1639.00 1639.50 0
2017-09-09 Fracture 1610.00 1610.50 0
2017-09-09 Fracture 1558.00 1558.50 0
2017-09-09 Fracture 1536.00 1536.50 0
2017-09-09 Fracture 1499.00 1499.50 0
2017-09-09 Fracture 1465.00 1465.50 0
2017-09-09 Fracture 1412.00 1412.50 0
2017-09-09 Fracture 1358.00 1358.50 0
2017-09-09 Fracture 1325.00 1325.50 0
2017-08-09 Perforation 1885.00 1885.50 20
2017-09-09 Fracture 1289.00 1289.50 0
2017-09-09 Fracture 1255.00 1255.50 0
2017-09-09 Fracture 1214.00 1214.50 0
2017-08-09 Perforation 1851.00 1851.50 20
2017-08-09 Perforation 1814.00 1814.50 20
2017-08-09 Perforation 1780.00 1780.50 20
2017-08-09 Perforation 1742.00 1742.50 20
2017-08-09 Perforation 1709.00 1709.50 20

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-09-09 2017-09-09 892 799 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 83.8876 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 9.6455 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0573 N/A
water 7732-18-5 100 0.0573 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0401 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1449 N/A
Ethylene glycol 107-21-1 100 0.1449 N/A
Potassium Carbonate 584-08-7 100 0.1449 N/A
Potassium Hydroxide 1310-58-3 100 0.1449 N/A
IH-FR-1C Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.0408 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3251 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.071 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.071 N/A
water 7732-18-5 100 0.071 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-09-08 2017-09-08 Oilfield Produced Water 799

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 2286 0.0 0.0 0.0
2018 8535 0.0 0.0 0.0
2019 8711 0.0 0.0 0.0
2020 2180 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-07-18 No Incident Encountered 0.00 0.00
2017-09-09 No Incident Encountered 0.00 0.00

For data sources see[10]

References