X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344090712020

Well Details

Well ID: 0344090712020
Loading map...
Location: 02/12-07-034-09W4/0
Location Alias: 02/12-07-34-09 W4M
Location Alias 2: 02/12-07-034-09 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 09
Section: 07
County/Municipality: Special Areas No. 4
Well Name: MAPCO D PROVOST 12-7-34-9
Operator Name: Page Petroleum Ltd
License Number: 0046063
License Date: 1973-06-06
License Status: RecExempt
Spud Date: 1973-06-08
Final Drill Date: 1973-06-13
Well Total Depth: 1386.80 m
Surface Hole Latitude: 51.906410
Surface Hole Longitude: -111.277885

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-06-06 Obtained License
1973-06-13 Finished Drilling
1973-06-13 Well Mode changed to Drilled and Cased
1973-06-14 Perforation Treatment Performed - Open-Hole Completion
1973-06-14 Production Casing Operation Performed
1974-02-01 Well Began Production
1974-02-01 Well Fluid changed to Water
1974-02-01 Well Type changed to Source
1974-06-10 Perforation Treatment Performed - Cement Squeeze
1974-09-12 Perforation Treatment Performed - Jet Perforation
1974-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-10-18 Well Fluid changed to Crude Oil
1974-10-18 Well Mode changed to Pumping
1975-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-12-01 Well Fluid changed to Water
1975-12-01 Well Type changed to Source
1977-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-11-02 Perforation Treatment Performed - Open-Hole Completion
1982-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-07-14 Well Abandoned
1982-07-14 Well Fluid changed to Water
1982-07-14 Well Mode changed to Abandoned
1982-07-14 Well Type changed to Source

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-06-14 Open Hole/Barefoot Completion 1092.10 1386.80 0
1977-11-02 Open Hole/Barefoot Completion 1092.10 1155.20 0
1982-07-14 Packing Device Capped w/Cement 1049.80 1057.70 0
1974-06-10 Cement Squeeze 1092.10 1386.80 0
1974-09-12 Perforation 1068.00 1072.90 7
1974-09-12 Perforation 1084.50 1088.10 7
1974-09-12 Perforation 1123.20 1133.20 7
1974-09-12 Perforation 1138.70 1157.60 7
1974-09-13 Acid Treatment 1068.00 1386.80 0
1975-01-20 Acid Treatment 1068.00 1386.80 0
1977-11-02 Packing Device Capped w/Cement 1155.20 1169.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 1664 0.0 0.0 0.0
1975 5939 0.0 0.0 0.0
1976 0 0.0 0.0 0.0

For data sources see[5]

References