X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344083504000

Well Details

Well ID: 0344083504000
Loading map...
Location: 00/04-35-034-08W4/0
Location Alias: 00/04-35-34-08 W4M
Location Alias 2: 00/04-35-034-08 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 08
Section: 35
County/Municipality: Special Areas No. 4
Well Name: SPUR PROVOST 4-35-34-8
Operator Name: Tamarack Acquisition Corp.
License Number: 0127708
License Date: 1987-08-04
License Status: Abandoned
Spud Date: 1987-09-06
Final Drill Date: 1987-09-08
Well Total Depth: 891.20 m
Surface Hole Latitude: 51.957121
Surface Hole Longitude: -111.041930

For data sources see[1][2]

Well History

Date Event
1987-08-04 Obtained License
1987-09-07 Surface Casing Operation Performed
1987-09-08 Finished Drilling
1987-09-08 Well Mode changed to Drilled and Cased
1987-09-09 Production Casing Operation Performed
1987-09-09 Rig Released
1987-10-09 Perforation Treatment Performed - Open-Hole Completion
1987-10-11 Well Log Performed
1987-10-21 Perforation Treatment Performed - Jet Perforation
1988-10-24 Liner Casing Operation Performed
1988-10-24 Perforation Treatment Performed - Cement Squeeze
1988-11-06 Perforation Treatment Performed - Jet Perforation
1988-11-09 Perforation Treatment Performed - Fractured
1988-12-23 Well Began Production
1988-12-23 Well Fluid changed to Crude Oil
1988-12-23 Well Mode changed to Flowing
1992-10-25 Well Fluid changed to Crude Oil
1992-10-25 Well Mode changed to Pumping
2002-08-30 Well Fluid changed to Crude Oil
2002-08-30 Well Mode changed to Suspended
2011-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-16 Plug Back Performed
2011-09-16 Well Fluid changed to Crude Oil
2011-09-16 Well Mode changed to Abandoned Zone
2011-12-13 Well Abandoned
2011-12-13 Well Fluid changed to Crude Oil
2011-12-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-10-09 Open Hole/Barefoot Completion 854.00 891.20 0
1987-10-21 Perforation 868.50 871.00 13
1988-10-24 Cement Squeeze 854.00 891.20 0
1988-11-06 Perforation 868.50 871.00 13
1988-11-09 Fracture 868.50 871.00 0
2011-09-16 Packing Device Capped w/Cement 851.90 860.10 0
2011-09-16 Packing Device Capped w/Cement 784.80 793.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 211 0.0 0.0 0.0
1989 3550 0.0 0.0 0.0
1990 4805 0.0 0.0 0.0
1991 8630 0.0 0.0 0.0
1992 8511 0.0 0.0 0.0
1993 7123 0.0 0.0 0.0
1994 8354 0.0 0.0 0.0
1995 8053 0.0 0.0 0.0
1996 6240 0.0 0.0 0.0
1997 5658 0.0 0.0 0.0
1998 7066 0.0 0.0 0.0
1999 744 0.0 0.0 0.0
2001 719 0.0 0.0 0.0

For data sources see[5]

References