X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344082710030

Well Details

Well ID: 0344082710030
Loading map...
Location: 03/10-27-034-08W4/0
Location Alias: 03/10-27-34-08 W4M
Location Alias 2: 03/10-27-034-08 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 08
Section: 27
County/Municipality: Special Areas No. 4
Well Name: TAC 6-35 HZ 103 PROVOST 10-27-34-8
Operator Name: Tamarack Acquisition Corp.
License Number: 0497542
License Date: 2020-01-27
License Status: Issued
Spud Date: 2020-02-07
Final Drill Date: 2020-02-12
Well Total Depth: 2708.00 m
Surface Hole Latitude: 51.960330
Surface Hole Longitude: -111.035076

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-02-07 Hertz & Paluck Energy Services Inc. 1 Set Surface
2020-02-10 Bonanza Drilling Inc. 3 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-02-11 249.10 Deviate (5 - 79 degrees)
2020-02-11 969.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-02-20 Perforation 2679.00 2679.50 20
2020-02-20 Perforation 2205.00 2205.50 20
2020-02-20 Perforation 2157.00 2157.50 20
2020-02-20 Perforation 2079.00 2079.50 20
2020-02-20 Perforation 2020.00 2020.50 20
2020-02-20 Perforation 1960.00 1960.50 20
2020-02-20 Perforation 1905.00 1905.50 20
2020-02-20 Perforation 1855.00 1855.50 20
2020-02-20 Perforation 1795.00 1795.50 20
2020-02-20 Perforation 1728.00 1728.50 20
2020-02-20 Perforation 1670.00 1670.50 20
2020-02-20 Perforation 2642.00 2642.50 20
2020-02-20 Perforation 1622.00 1622.50 20
2020-02-20 Perforation 1483.00 1483.50 20
2020-02-20 Perforation 1427.00 1427.50 20
2020-02-20 Perforation 1378.00 1378.50 20
2020-02-20 Perforation 1308.00 1308.50 20
2020-02-20 Perforation 1252.00 1252.50 20
2020-02-20 Perforation 1203.00 1203.50 20
2020-02-20 Perforation 1157.00 1157.50 20
2020-02-20 Perforation 1101.00 1101.50 20
2020-02-20 Perforation 1052.00 1052.50 20
2020-02-20 Perforation 2595.00 2595.50 20
2020-02-20 Perforation 994.00 994.50 20
2020-02-26 Fracture 2679.00 2679.50 0
2020-02-26 Fracture 2642.00 2642.50 0
2020-02-26 Fracture 2595.00 2595.50 0
2020-02-26 Fracture 2539.00 2539.50 0
2020-02-26 Fracture 2490.00 2490.50 0
2020-02-26 Fracture 2434.00 2434.50 0
2020-02-26 Fracture 2376.00 2376.50 0
2020-02-26 Fracture 2318.00 2318.50 0
2020-02-26 Fracture 2261.00 2261.50 0
2020-02-20 Perforation 2539.00 2539.50 20
2020-02-26 Fracture 2205.00 2205.50 0
2020-02-26 Fracture 2157.00 2157.50 0
2020-02-26 Fracture 2079.00 2079.50 0
2020-02-26 Fracture 2020.00 2020.50 0
2020-02-26 Fracture 1960.00 1960.50 0
2020-02-26 Fracture 1905.00 1905.50 0
2020-02-26 Fracture 1855.00 1855.50 0
2020-02-26 Fracture 1795.00 1795.50 0
2020-02-26 Fracture 1728.00 1728.50 0
2020-02-26 Fracture 1670.00 1670.50 0
2020-02-20 Perforation 2490.00 2490.50 20
2020-02-26 Fracture 1622.00 1622.50 0
2020-02-26 Fracture 1483.00 1483.50 0
2020-02-26 Fracture 1427.00 1427.50 0
2020-02-26 Fracture 1378.00 1378.50 0
2020-02-27 Fracture 1308.00 1308.50 0
2020-02-27 Fracture 1252.00 1252.50 0
2020-02-27 Fracture 1203.00 1203.50 0
2020-02-27 Fracture 1157.00 1157.50 0
2020-02-27 Fracture 1101.00 1101.50 0
2020-02-27 Fracture 1052.00 1052.50 0
2020-02-20 Perforation 2434.00 2434.50 20
2020-02-27 Fracture 994.00 994.50 0
2020-02-20 Perforation 2376.00 2376.50 20
2020-02-20 Perforation 2318.00 2318.50 20
2020-02-20 Perforation 2261.00 2261.50 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 612 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-13 No Incident Encountered 0.00 0.00
2020-02-27 No Incident Encountered 0.00 0.00

For data sources see[7]

References