X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344082310000

Well Details

Well ID: 0344082310000
Loading map...
Location: 00/10-23-034-08W4/0
Location Alias: 00/10-23-34-08 W4M
Location Alias 2: 00/10-23-034-08 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 08
Section: 23
County/Municipality: Special Areas No. 4
Well Name: SPUR PROVOST 10-23-34-8
Operator Name: Tamarack Acquisition Corp.
License Number: 0115539
License Date: 1985-06-24
License Status: Suspension
Spud Date: 1985-07-17
Final Drill Date: 1985-07-24
Well Total Depth: 1079.00 m
Surface Hole Latitude: 51.933833
Surface Hole Longitude: -111.027188

For data sources see[1][2]

Well History

Date Event
1985-06-24 Obtained License
1985-07-18 Surface Casing Operation Performed
1985-07-24 Finished Drilling
1985-07-24 Production Casing Operation Performed
1985-07-24 Well Log Performed
1985-07-24 Well Mode changed to Drilled and Cased
1985-07-25 Rig Released
1985-09-02 Perforation Treatment Performed - Jet Perforation
1985-09-03 Perforation Treatment Performed - Fractured
1985-09-03 Perforation Treatment Performed - Jet Perforation
1985-09-06 Perforation Treatment Performed - Cement Squeeze
1985-09-06 Perforation Treatment Performed - Jet Perforation
1985-11-12 Well Began Production
1985-11-12 Well Fluid changed to Crude Oil
1985-11-12 Well Mode changed to Pumping
2002-08-30 Well Fluid changed to Crude Oil
2002-08-30 Well Mode changed to Suspended
2002-10-16 Well Fluid changed to Crude Oil
2002-10-16 Well Mode changed to Pumping
2015-07-01 Well Fluid changed to Crude Oil
2015-07-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-09-02 Perforation 860.50 862.00 13
1985-09-03 Perforation 865.50 868.50 13
1985-09-03 Perforation 860.50 862.00 13
1985-09-03 Fracture 860.50 868.50 0
1985-09-06 Perforation 450.00 451.00 7
1985-09-06 Perforation 424.00 426.00 7
1985-09-06 Cement Squeeze 424.00 451.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 1169 0.0 0.0 0.0
1986 8712 0.0 0.0 0.0
1987 8397 0.0 0.0 0.0
1988 8608 0.0 0.0 0.0
1989 8230 0.0 0.0 0.0
1990 8464 0.0 0.0 0.0
1991 8631 0.0 0.0 0.0
1992 8487 0.0 0.0 0.0
1993 8589 0.0 0.0 0.0
1994 6696 0.0 0.0 0.0
1995 8255 0.0 0.0 0.0
1996 8764 0.0 0.0 0.0
1997 7289 0.0 0.0 0.0
1998 7727 0.0 0.0 0.0
1999 8467 0.0 0.0 0.0
2000 8729 0.0 0.0 0.0
2001 6247 0.0 0.0 0.0
2002 1776 0.0 0.0 0.0
2003 8655 0.0 0.0 0.0
2004 8763 0.0 0.0 0.0
2005 4754 0.0 0.0 0.0
2006 8735 0.0 0.0 0.0
2007 8615 0.0 0.0 0.0
2008 8239 0.0 0.0 0.0
2009 7848 0.0 0.0 0.0
2010 8035 0.0 0.0 0.0
2011 8018 0.0 0.0 0.0
2012 8529 0.0 0.0 0.0
2013 8454 0.0 0.0 0.0
2014 7370 0.0 0.0 0.0
2015 4055 0.0 0.0 0.0

For data sources see[5]

References