X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344082002030

Well Details

Well ID: 0344082002030
Loading map...
Location: 03/02-20-034-08W4/0
Location Alias: 03/02-20-34-08 W4M
Location Alias 2: 03/02-20-034-08 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 08
Section: 20
County/Municipality: Special Areas No. 4
Well Name: TAC 12-16 HZ 103 PROVOST 2-20-34-8
Operator Name: Tamarack Acquisition Corp.
License Number: 0494257
License Date: 2019-04-18
License Status: Issued
Spud Date: 2019-05-31
Final Drill Date: 2019-08-02
Well Total Depth: 1902.00 m
Surface Hole Latitude: 51.920992
Surface Hole Longitude: -111.089092

For data sources see[1][2]

Well History

Date Event
2019-04-18 Obtained License
2019-05-31 Set Surface
2019-05-31 Surface Casing Operation Performed
2019-08-01 Direction Drilling Operation Performed - Deviate
2019-08-01 Drill To LD
2019-08-02 Direction Drilling Operation Performed - Horizontal
2019-08-02 Finished Drilling
2019-08-02 Well Log Performed
2019-08-02 Well Mode changed to Drilled and Cased
2019-08-03 Production Casing Operation Performed
2019-08-03 Rig Released
2019-08-03 Well Log Performed
2019-08-06 Perforation Treatment Performed - Jet Perforation
2019-08-09 Perforation Treatment Performed - Fractured
2019-08-21 Well Began Production
2019-08-21 Well Fluid changed to Crude Oil
2019-08-21 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-08-01 Tempco Drilling Company Inc. 8 Drill To LD
2019-05-31 Predator Drilling Inc. 27 Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-08-01 231.00 Deviate (5 - 79 degrees)
2019-08-02 1010.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-08-06 Perforation 1811.00 1811.50 20
2019-08-06 Perforation 1500.00 1500.50 20
2019-08-06 Perforation 1465.00 1465.50 20
2019-08-06 Perforation 1432.00 1432.50 20
2019-08-06 Perforation 1396.00 1396.50 20
2019-08-06 Perforation 1350.00 1350.50 20
2019-08-06 Perforation 1315.00 1315.50 20
2019-08-06 Perforation 1285.00 1285.50 20
2019-08-06 Perforation 1256.00 1256.50 20
2019-08-06 Perforation 1215.00 1215.50 20
2019-08-06 Perforation 1174.00 1174.50 20
2019-08-06 Perforation 1775.00 1775.50 20
2019-08-06 Perforation 1139.00 1139.50 20
2019-08-06 Perforation 1109.00 1109.50 20
2019-08-06 Perforation 1068.00 1068.50 20
2019-08-09 Fracture 1811.00 1811.50 0
2019-08-09 Fracture 1775.00 1775.50 0
2019-08-09 Fracture 1743.00 1743.50 0
2019-08-09 Fracture 1707.00 1707.50 0
2019-08-09 Fracture 1675.00 1675.50 0
2019-08-09 Fracture 1639.00 1639.50 0
2019-08-09 Fracture 1607.00 1607.50 0
2019-08-06 Perforation 1743.00 1743.50 20
2019-08-09 Fracture 1571.00 1571.50 0
2019-08-09 Fracture 1533.00 1533.50 0
2019-08-09 Fracture 1500.00 1500.50 0
2019-08-09 Fracture 1465.00 1465.50 0
2019-08-09 Fracture 1432.00 1432.50 0
2019-08-09 Fracture 1396.00 1396.50 0
2019-08-09 Fracture 1350.00 1350.50 0
2019-08-09 Fracture 1315.00 1315.50 0
2019-08-09 Fracture 1285.00 1285.50 0
2019-08-09 Fracture 1256.00 1256.50 0
2019-08-06 Perforation 1707.00 1707.50 20
2019-08-09 Fracture 1215.00 1215.50 0
2019-08-09 Fracture 1174.00 1174.50 0
2019-08-09 Fracture 1139.00 1139.50 0
2019-08-09 Fracture 1109.00 1109.50 0
2019-08-09 Fracture 1068.00 1068.50 0
2019-08-06 Perforation 1675.00 1675.50 20
2019-08-06 Perforation 1639.00 1639.50 20
2019-08-06 Perforation 1607.00 1607.50 20
2019-08-06 Perforation 1571.00 1571.50 20
2019-08-06 Perforation 1533.00 1533.50 20

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-08-09 2019-08-09 878 571 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 83.5857 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 11.943 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.1185 N/A
water 7732-18-5 100 0.1185 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0127 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1609 N/A
Ethylene glycol 107-21-1 100 0.1609 N/A
Potassium Carbonate 584-08-7 100 0.1609 N/A
Potassium Hydroxide 1310-58-3 100 0.1609 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3076 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0712 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0712 N/A
water 7732-18-5 100 0.0712 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-08-06 2019-08-11 Oilfield Produced Water 600
2019-08-06 2019-08-11 Oilfield Produced Water 23
2019-08-06 2019-08-11 Oilfield Produced Water 4
2019-08-06 2019-08-11 Central Water Distribution Facility 9
2019-08-06 2019-08-11 Central Water Distribution Facility 4
2019-08-06 2019-08-11 Central Water Distribution Facility 12

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 3178 0.0 0.0 0.0
2020 2175 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-08-03 No Incident Encountered 0.00 0.00
2019-08-16 No Incident Encountered 0.00 0.00

For data sources see[10]

References