X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344081911000

Well Details

Well ID: 0344081911000
Loading map...
Location: 00/11-19-034-08W4/0
Location Alias: 00/11-19-34-08 W4M
Location Alias 2: 00/11-19-034-08 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 08
Section: 19
County/Municipality: Special Areas No. 4
Well Name: TAC 4-29 HZ PROVOST 11-19-34-8
Operator Name: Tamarack Acquisition Corp.
License Number: 0496997
License Date: 2019-12-18
License Status: Issued
Spud Date: 2020-01-07
Final Drill Date: 2020-02-18
Well Total Depth: 2569.00 m
Surface Hole Latitude: 51.942132
Surface Hole Longitude: -111.112268

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-01-07 Hertz & Paluck Energy Services Inc. 1 Set Surface
2020-02-16 Tempco Drilling Company Inc. 8 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-02-16 205.70 Deviate (5 - 79 degrees)
2020-02-17 1055.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-02-26 Perforation 2542.00 2542.50 20
2020-02-26 Perforation 2040.00 2040.50 20
2020-02-26 Perforation 1991.00 1991.50 20
2020-02-26 Perforation 1956.00 1956.50 20
2020-02-26 Perforation 1878.00 1878.50 20
2020-02-26 Perforation 1828.00 1828.50 20
2020-02-26 Perforation 1771.00 1771.50 20
2020-02-26 Perforation 1721.00 1721.50 20
2020-02-26 Perforation 1666.00 1666.50 20
2020-02-26 Perforation 1617.00 1617.50 20
2020-02-26 Perforation 1561.00 1561.50 20
2020-02-26 Perforation 2494.00 2494.50 20
2020-02-26 Perforation 1512.00 1512.50 20
2020-02-26 Perforation 1457.00 1457.50 20
2020-02-26 Perforation 1408.00 1408.50 20
2020-02-26 Perforation 1353.00 1353.50 20
2020-02-26 Perforation 1304.00 1304.50 20
2020-02-26 Perforation 1245.00 1245.50 20
2020-02-26 Perforation 1188.00 1188.50 20
2020-02-26 Perforation 1121.00 1121.50 20
2020-02-26 Perforation 1074.00 1074.50 20
2020-02-28 Fracture 2542.00 2542.50 0
2020-02-26 Perforation 2445.00 2445.50 20
2020-02-28 Fracture 2494.00 2494.50 0
2020-02-28 Fracture 2445.00 2445.50 0
2020-02-28 Fracture 2378.00 2378.50 0
2020-02-28 Fracture 2319.00 2319.50 0
2020-02-28 Fracture 2270.00 2270.50 0
2020-02-28 Fracture 2215.00 2215.50 0
2020-02-28 Fracture 2156.00 2156.50 0
2020-02-28 Fracture 2095.00 2095.50 0
2020-02-28 Fracture 2040.00 2040.50 0
2020-02-28 Fracture 1991.00 1991.50 0
2020-02-26 Perforation 2378.00 2378.50 20
2020-02-28 Fracture 1956.00 1956.50 0
2020-02-28 Fracture 1878.00 1878.50 0
2020-02-28 Fracture 1828.00 1828.50 0
2020-02-28 Fracture 1771.00 1771.50 0
2020-02-28 Fracture 1721.00 1721.50 0
2020-02-28 Fracture 1666.00 1666.50 0
2020-02-29 Fracture 1617.00 1617.50 0
2020-02-29 Fracture 1561.00 1561.50 0
2020-02-29 Fracture 1512.00 1512.50 0
2020-02-29 Fracture 1457.00 1457.50 0
2020-02-26 Perforation 2319.00 2319.50 20
2020-02-29 Fracture 1408.00 1408.50 0
2020-02-29 Fracture 1353.00 1353.50 0
2020-02-29 Fracture 1304.00 1304.50 0
2020-02-29 Fracture 1245.00 1245.50 0
2020-02-29 Fracture 1188.00 1188.50 0
2020-02-29 Fracture 1121.00 1121.50 0
2020-02-29 Fracture 1074.00 1074.50 0
2020-02-26 Perforation 2270.00 2270.50 20
2020-02-26 Perforation 2215.00 2215.50 20
2020-02-26 Perforation 2156.00 2156.50 20
2020-02-26 Perforation 2095.00 2095.50 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 619 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-19 No Incident Encountered 0.00 0.00
2020-02-29 No Incident Encountered 0.00 0.00

For data sources see[7]

References